[NyRenewableProjectPulse](/v/nyrenewableprojectpulse) / compare

# 401 Fieldcrest Dr. Elmsford, NY 10523 vs ATT Clean Energy Project - 400 Hamilton B: NyRenewableProjectPulse comparison

**ATT Clean Energy Project - 400 Hamilton B's capacity of 1 is 1.0x 401 Fieldcrest Dr. Elmsford, NY 10523's 1 (12th percentile). 401 Fieldcrest Dr. Elmsford, NY 10523 is dated 2026-09-30; ATT Clean Energy Project - 400 Hamilton B 2026-09-30.**

Data as of 2026-11-04 · [Compiled by Zalwin](/research/nyrenewableprojectpulse) from NYSERDA Large-scale Renewable Projects Reported by NYSERDA: Beginning 2004 (data.ny.gov) Copy citation

Download all 297 NyRenewableProjectPulse records (CSV) — $4.99 →

Both records plus every comparable record, with all columns and source links · Card, Apple Pay, Google Pay or Link via Stripe

## How does 401 Fieldcrest Dr. Elmsford, NY 10523 compare to ATT Clean Energy Project - 400 Hamilton B?

| Field | 401 Fieldcrest Dr. Elmsford, NY 10523 | ATT Clean Energy Project - 400 Hamilton B |
|---|---|---|
| Project | 401 Fieldcrest Dr. Elmsford, NY 10523 | ATT Clean Energy Project - 400 Hamilton B |
| Technology | Fuel Cell | Fuel Cell |
| Capacity | 0.8 MW | 1 MW |
| Solicitation | 2554 | 2554 |
| Status | Completed | Cancelled |
| Delivery start | 2015 | |
| NYISO zone | Dunwoodie | Dunwoodie |
| Location | Westchester County, NY | Westchester County, NY |
| Data through | 2026-09-30 | 2026-09-30 |
| capacity percentile | 10th | 12th |
| Score | 15/100 | 15/100 |
| Peer rank and all 297 records (CSV) | Every comparable record ranked, with amounts, dates and scores 🔒 Click to unlock → |
| Official source URLs for every peer record | Direct links to each record at its government source 🔒 Click to unlock → |

Official records: [401 Fieldcrest Dr. Elmsford, NY 10523](https://data.ny.gov/d/dprp-55ye) · [ATT Clean Energy Project - 400 Hamilton B](https://data.ny.gov/d/dprp-55ye)

## Get new and changed projects

NyRenewableProjectPulse emails projects that are new or change status, matching your technologies and minimum MW.

Download all matching records (CSV) — $4.99 → [See plans](/v/nyrenewableprojectpulse#pricing)

From NYSERDA's Large-scale Renewable Projects dataset, refreshed quarterly. Capacity and dates are contract figures; projects under development may be delayed or cancelled. Project level only. Verify with NYSERDA and the NYS DPS.

## Often used together

- [GhgEmitterPulse](/v/ghgemitterpulse)
- [NyCertificateOfNeedPulse](/v/nycertificateofneedpulse)
- [SEC Form D Capital Raise + Commercial Facility Permit Expansion Multi-Signal Trigger](/v/formdfacpermitxsignal)
- [SubprocessorRadar](/subprocessorradar)
- [OidcConfigAudit](/oidcconfigaudit)
- [OpenGraphPreviewPulse](/opengraphpreviewpulse)
