[NyRenewableProjectPulse](/v/nyrenewableprojectpulse) / compare

# Cider Solar Farm vs Excelsior Energy Center LLC: NyRenewableProjectPulse comparison

**Cider Solar Farm's capacity of 500 is 1.8x Excelsior Energy Center LLC's 280 (97th percentile). Cider Solar Farm is dated 2026-09-30; Excelsior Energy Center LLC 2026-09-30.**

Data as of 2026-11-04 · [Compiled by Zalwin](/research/nyrenewableprojectpulse) from NYSERDA Large-scale Renewable Projects Reported by NYSERDA: Beginning 2004 (data.ny.gov) Copy citation

Download all 297 NyRenewableProjectPulse records (CSV) — $4.99 →

Both records plus every comparable record, with all columns and source links · Card, Apple Pay, Google Pay or Link via Stripe

## How does Cider Solar Farm compare to Excelsior Energy Center LLC?

| Field | Cider Solar Farm | Excelsior Energy Center LLC |
|---|---|---|
| Project | Cider Solar Farm | Excelsior Energy Center LLC |
| Developer | Greenbacker Renewable Energy Company | NextEra Energy Resources |
| Technology | Solar | Solar |
| Capacity | 500 MW | 280 MW |
| Solicitation | RESRFP23-1 | RESRFP23-1 |
| Status | Under Development | Under Development |
| Delivery start | 2027 | 2026 |
| Permit process | ORES | Article 10 |
| Interconnection queue # | 811 | 721 |
| NYISO zone | Genesee | Genesee |
| Location | Genesee County, NY | Genesee County, NY |
| Data through | 2026-09-30 | 2026-09-30 |
| capacity percentile | 97th | 93rd |
| Score | 85/100 | 85/100 |
| Peer rank and all 297 records (CSV) | Every comparable record ranked, with amounts, dates and scores 🔒 Click to unlock → |
| Official source URLs for every peer record | Direct links to each record at its government source 🔒 Click to unlock → |

Official records: [Cider Solar Farm](https://data.ny.gov/d/dprp-55ye) · [Excelsior Energy Center LLC](https://data.ny.gov/d/dprp-55ye)

## Get new and changed projects

NyRenewableProjectPulse emails projects that are new or change status, matching your technologies and minimum MW.

Download all matching records (CSV) — $4.99 → [See plans](/v/nyrenewableprojectpulse#pricing)

From NYSERDA's Large-scale Renewable Projects dataset, refreshed quarterly. Capacity and dates are contract figures; projects under development may be delayed or cancelled. Project level only. Verify with NYSERDA and the NYS DPS.

## Often used together

- [GhgEmitterPulse](/v/ghgemitterpulse)
- [NyCertificateOfNeedPulse](/v/nycertificateofneedpulse)
- [SEC Form D Capital Raise + Commercial Facility Permit Expansion Multi-Signal Trigger](/v/formdfacpermitxsignal)
- [SubprocessorRadar](/subprocessorradar)
- [OidcConfigAudit](/oidcconfigaudit)
- [OpenGraphPreviewPulse](/opengraphpreviewpulse)
