[NyRenewableProjectPulse](/v/nyrenewableprojectpulse) / compare

# Fort Covington Solar Farm vs Fort Covington Solar Farm: NyRenewableProjectPulse comparison

**Fort Covington Solar Farm's capacity of 250 is 1.0x Fort Covington Solar Farm's 250 (91st percentile). Fort Covington Solar Farm is dated 2026-09-30; Fort Covington Solar Farm 2026-09-30.**

Data as of 2026-11-04 · [Compiled by Zalwin](/research/nyrenewableprojectpulse) from NYSERDA Large-scale Renewable Projects Reported by NYSERDA: Beginning 2004 (data.ny.gov) Copy citation

Download all 297 NyRenewableProjectPulse records (CSV) — $4.99 →

Both records plus every comparable record, with all columns and source links · Card, Apple Pay, Google Pay or Link via Stripe

## How does Fort Covington Solar Farm compare to Fort Covington Solar Farm?

| Field | Fort Covington Solar Farm | Fort Covington Solar Farm |
|---|---|---|
| Project | Fort Covington Solar Farm | Fort Covington Solar Farm |
| Developer | Boralex | Boralex |
| Technology | Solar | Solar |
| Capacity | 250 MW | 250 MW |
| Storage | 77 MW / 308 MWh | |
| Solicitation | RESRFP21-1 | RESRFP24-1 |
| Status | Cancelled | Under Development |
| Permit process | ORES | ORES |
| Interconnection queue # | 1183 | 1183 |
| NYISO zone | North | North |
| Location | Franklin County, NY | Franklin County, NY |
| Data through | 2026-09-30 | 2026-09-30 |
| Delivery start | | 2029 |
| capacity percentile | 91st | 91st |
| Score | 45/100 | 85/100 |
| Peer rank and all 297 records (CSV) | Every comparable record ranked, with amounts, dates and scores 🔒 Click to unlock → |
| Official source URLs for every peer record | Direct links to each record at its government source 🔒 Click to unlock → |

Official records: [Fort Covington Solar Farm](https://data.ny.gov/d/dprp-55ye) · [Fort Covington Solar Farm](https://data.ny.gov/d/dprp-55ye)

## Get new and changed projects

NyRenewableProjectPulse emails projects that are new or change status, matching your technologies and minimum MW.

Download all matching records (CSV) — $4.99 → [See plans](/v/nyrenewableprojectpulse#pricing)

From NYSERDA's Large-scale Renewable Projects dataset, refreshed quarterly. Capacity and dates are contract figures; projects under development may be delayed or cancelled. Project level only. Verify with NYSERDA and the NYS DPS.

## Often used together

- [GhgEmitterPulse](/v/ghgemitterpulse)
- [NyCertificateOfNeedPulse](/v/nycertificateofneedpulse)
- [SEC Form D Capital Raise + Commercial Facility Permit Expansion Multi-Signal Trigger](/v/formdfacpermitxsignal)
- [SubprocessorRadar](/subprocessorradar)
- [OidcConfigAudit](/oidcconfigaudit)
- [OpenGraphPreviewPulse](/opengraphpreviewpulse)
