Construction of a new mixed use (retail and commercial office) facility at Assembly Row to include a (13) story retail and commerical office building and a (7) story, above grade parking structure. This application submitted for the purposed of requesting EOT consent to build over a former railroad
2026-11-04
Demolition of existing building and site utilities - WITHDRAWN SEE D15-000038 — Permitting (1835535)
2026-11-04
Basement renovations. French drain system. Framing walls. New electric and plumbing work. Insulate all exterior walls. New half bathroom. All new 1/2" blue boards with skim coat plaster. Paint entire basement — Permitting (4144773)
2026-11-04
Renovations and repairs: repair existing porch and foundation, renovate kitchen, bathroom and mudroom, new siding and roofing. - DUPLICATE PERMIT SEE B15-001109 — Permitting (2279166)
2026-11-04
Wire new service and 4 units Permits pulled see E16-000942-0945 JP 7/7/16 — Permitting (2855230)
2026-11-04
Public records via
Somerville MA Applications for Permits and Licenses Pulse
on Zalwin. Informational only.