Every NyRenewableProjectPulse record report, 200 per page, grouped by state. Records 1 to 200: Attentive Energy One: 1,404 MW offshore wind project, cancelled, NY to ATT Clean Energy Project - Rego Park: 0.2 MW fuel cell / other project, contract completed in Queens County, NY. Source: NYSERDA Large-scale Renewable Projects Reported by NYSERDA: Beginning 2004 (data.ny.gov).

1 [2](/hub/nyrenewableprojectpulse/records/2)

- [Attentive Energy One: 1,404 MW offshore wind project, cancelled, NY](/report/nyrenewableprojectpulse/nyserda-attentive-energy-one-orecrfp22-1)
- [Beacon Wind: 1,230 MW offshore wind project, cancelled, NY](/report/nyrenewableprojectpulse/nyserda-beacon-wind-orecrfp20-1)
- [Champlain Hudson Power Express (CHPE): hydroelectric project, operational, NY](/report/nyrenewableprojectpulse/nyserda-champlain-hudson-power-express-chpe--t4rfp21-1)
- [Clean Path NY (CPNY): land-based wind project, cancelled, NY](/report/nyrenewableprojectpulse/nyserda-clean-path-ny-cpny--t4rfp21-1)
- [Community Offshore Wind 1: 1,314 MW offshore wind project, cancelled, NY](/report/nyrenewableprojectpulse/nyserda-community-offshore-wind-1-orecrfp22-1)
- [Community Refuse LFG: 6.4 MW biogas / biomass project, contract completed, PA](/report/nyrenewableprojectpulse/nyserda-community-refuse-lfg-2389)
- [Empire Wind 1: 816 MW offshore wind project, cancelled, NY](/report/nyrenewableprojectpulse/nyserda-empire-wind-1-orecrfp18-1)
- [Empire Wind 2: 1,260 MW offshore wind project, cancelled, NY](/report/nyrenewableprojectpulse/nyserda-empire-wind-2-orecrfp20-1)
- [Excelsior Wind A: 1,314 MW offshore wind project, cancelled, NY](/report/nyrenewableprojectpulse/nyserda-excelsior-wind-a-orecrfp22-1)
- [High Falls: 14.7 MW hydroelectric project, contract completed, QC](/report/nyrenewableprojectpulse/nyserda-high-falls-1168)
- [Mineral Basin Solar: 401.64 MW solar project, cancelled, PA](/report/nyrenewableprojectpulse/nyserda-mineral-basin-solar-resrfp22-1)
- [Ogdensburg Hydro: 3 MW hydroelectric project, operational, NY](/report/nyrenewableprojectpulse/nyserda-ogdensburg-hydro-tier-2-maintenance)
- [Port of Albany Port Infrastructure Investment Plan: fuel cell / other project, cancelled, NY](/report/nyrenewableprojectpulse/nyserda-port-of-albany-port-infrastructure-investment-plan-orecrfp20-1)
- [South Brooklyn Marine Terminal: fuel cell / other project, under development, NY](/report/nyrenewableprojectpulse/nyserda-south-brooklyn-marine-terminal-orecrfp20-1)
- [Sunrise Wind: 924 MW offshore wind project, cancelled, NY](/report/nyrenewableprojectpulse/nyserda-sunrise-wind-orecrfp18-1)

## ALBANY

- [Albany 1: 0.9 MW biogas / biomass project, contract completed in Albany County, NY](/report/nyrenewableprojectpulse/nyserda-albany-1-1851)
- [Albany 2: 3.2 MW biogas / biomass project, contract completed in Albany County, NY](/report/nyrenewableprojectpulse/nyserda-albany-2-2226)
- [Coeymans Solar: 20 MW solar project, operational in Albany County, NY](/report/nyrenewableprojectpulse/nyserda-coeymans-solar-3257)
- [School Street: 5.2 MW hydroelectric project, contract completed in Albany County, NY](/report/nyrenewableprojectpulse/nyserda-school-street-1681)

## ALLEGANY

- [Alfred Oaks Solar: 100 MW solar project, cancelled in Allegany County, NY](/report/nyrenewableprojectpulse/nyserda-alfred-oaks-solar-resrfp21-1)
- [Moraine Solar Energy Center: 93.55 MW solar project, cancelled in Allegany County, NY](/report/nyrenewableprojectpulse/nyserda-moraine-solar-energy-center-resrfp20-1)
- [Moraine Solar Energy Center: 93.55 MW solar project, under development in Allegany County, NY](/report/nyrenewableprojectpulse/nyserda-moraine-solar-energy-center-resrfp24-1)

## BROOME

- [Bluestone Wind: 111.8 MW land-based wind project, operational in Broome County, NY](/report/nyrenewableprojectpulse/nyserda-bluestone-wind-resrfp17-1)

## CATTARAUGUS

- [Alle-Catt Wind Farm: 339.78 MW land-based wind project, cancelled in Cattaraugus County, NY](/report/nyrenewableprojectpulse/nyserda-alle-catt-wind-farm-resrfp17-1)
- [Alle-Catt Wind: 340 MW land-based wind project, under development in Cattaraugus County, NY](/report/nyrenewableprojectpulse/nyserda-alle-catt-wind-resrfp23-1)
- [Bakerstand Solar 1: 19.99 MW solar project, cancelled in Cattaraugus County, NY](/report/nyrenewableprojectpulse/nyserda-bakerstand-solar-1-resrfp18-1)
- [Martin Rd Solar: 19.99 MW solar project, cancelled in Cattaraugus County, NY](/report/nyrenewableprojectpulse/nyserda-martin-rd-solar-resrfp19-1)

## CAYUGA

- [Agricola Wind: 99 MW land-based wind project, under development in Cayuga County, NY](/report/nyrenewableprojectpulse/nyserda-agricola-wind-resrfp24-1)
- [Dog Corners Solar: 19.99 MW solar project, under development in Cayuga County, NY](/report/nyrenewableprojectpulse/nyserda-dog-corners-solar-resrfp23-1)
- [Garnet Energy Center Storage 1: 200 MW solar project, cancelled in Cayuga County, NY](/report/nyrenewableprojectpulse/nyserda-garnet-energy-center-storage-1-resrfp19-1)
- [Garnet Energy Center, LLC: 200 MW solar project, under development in Cayuga County, NY](/report/nyrenewableprojectpulse/nyserda-garnet-energy-center-llc-resrfp23-1)
- [Great Gully Solar Farm (formerly Delight Farm): 16.8 MW solar project, cancelled in Cayuga County, NY](/report/nyrenewableprojectpulse/nyserda-great-gully-solar-farm-formerly-delight-farm--resrfp20-1)
- [Harvest Hills Solar (Formerly Milliken Solar): 200 MW solar project, cancelled in Cayuga County, NY](/report/nyrenewableprojectpulse/nyserda-harvest-hills-solar-formerly-milliken-solar--resrfp20-1)
- [Harvest Hills Solar 2: 100 MW solar project, cancelled in Cayuga County, NY](/report/nyrenewableprojectpulse/nyserda-harvest-hills-solar-2-resrfp21-1)
- [Mill Street Dam: 0.22 MW hydroelectric project, contract completed in Cayuga County, NY](/report/nyrenewableprojectpulse/nyserda-mill-street-dam-2389)
- [North Division Street Dam Hydroelectric Facility: 0.58 MW hydroelectric project, operational in Cayuga County, NY](/report/nyrenewableprojectpulse/nyserda-north-division-street-dam-hydroelectric-facility-3257)
- [Scipio Solar: 18 MW solar project, under development in Cayuga County, NY](/report/nyrenewableprojectpulse/nyserda-scipio-solar-resrfp23-1)
- [SED Dog Corners Solar: 19.99 MW solar project, cancelled in Cayuga County, NY](/report/nyrenewableprojectpulse/nyserda-sed-dog-corners-solar-resrfp18-1)
- [SunEast Scipio Solar: 18 MW solar project, cancelled in Cayuga County, NY](/report/nyrenewableprojectpulse/nyserda-suneast-scipio-solar-resrfp21-1)

## CHAUTAUQUA

- [South Ripley Solar and Storage: 270 MW solar project, cancelled in Chautauqua County, NY](/report/nyrenewableprojectpulse/nyserda-south-ripley-solar-and-storage-resrfp19-1)
- [South Ripley Solar: 261.9 MW solar project, cancelled in Chautauqua County, NY](/report/nyrenewableprojectpulse/nyserda-south-ripley-solar-resrfp24-1)
- [SunEast Kingbird Solar: 19.99 MW solar project, cancelled in Chautauqua County, NY](/report/nyrenewableprojectpulse/nyserda-suneast-kingbird-solar-resrfp20-1)
- [York Run Solar: 90 MW solar project, cancelled in Chautauqua County, NY](/report/nyrenewableprojectpulse/nyserda-york-run-solar-resrfp21-1)
- [York Run Solar: 90 MW solar project, under development in Chautauqua County, NY](/report/nyrenewableprojectpulse/nyserda-york-run-solar-resrfp24-1)

## CHENANGO

- [High Bridge Wind and Battery: 99 MW land-based wind project, cancelled in Chenango County, NY](/report/nyrenewableprojectpulse/nyserda-high-bridge-wind-and-battery-resrfp18-1)
- [High Bridge Wind: 100.8 MW land-based wind project, under development in Chenango County, NY](/report/nyrenewableprojectpulse/nyserda-high-bridge-wind-resrfp24-1)
- [Puckett Solar: 20 MW solar project, operational in Chenango County, NY](/report/nyrenewableprojectpulse/nyserda-puckett-solar-resrfp17-1)

## CLINTON

- [Altona Windpark: 31.61 MW land-based wind project, under development in Clinton County, NY](/report/nyrenewableprojectpulse/nyserda-altona-windpark-resrfp24-1)
- [Altona: 102 MW land-based wind project, contract completed in Clinton County, NY](/report/nyrenewableprojectpulse/nyserda-altona-1037)
- [Black Brook Hydro_October 2021 Award: 0.64 MW hydroelectric project, contract completed in Clinton County, NY](/report/nyrenewableprojectpulse/nyserda-black-brook-hydro-october-2021-award-tier-2-maintenance)
- [Black Brook Hydro: 0.52 MW hydroelectric project, operational in Clinton County, NY](/report/nyrenewableprojectpulse/nyserda-black-brook-hydro-tier-2-maintenance)
- [Chateaugay Wind Farm: 106.5 MW land-based wind project, contract completed in Clinton County, NY](/report/nyrenewableprojectpulse/nyserda-chateaugay-wind-farm-1037)
- [Chateaugay Windpark: 33.26 MW land-based wind project, under development in Clinton County, NY](/report/nyrenewableprojectpulse/nyserda-chateaugay-windpark-resrfp25-1)
- [Clinton Co.: 6.4 MW biogas / biomass project, contract completed in Clinton County, NY](/report/nyrenewableprojectpulse/nyserda-clinton-co--2389)
- [Clinton Wind: 100.5 MW land-based wind project, contract completed in Clinton County, NY](/report/nyrenewableprojectpulse/nyserda-clinton-wind-1037)
- [Clinton Windpark: 27.57 MW land-based wind project, under development in Clinton County, NY](/report/nyrenewableprojectpulse/nyserda-clinton-windpark-resrfp24-1)
- [Ellenburg Windpark: 33.08 MW land-based wind project, under development in Clinton County, NY](/report/nyrenewableprojectpulse/nyserda-ellenburg-windpark-resrfp25-1)
- [Ellenburg: 81 MW land-based wind project, contract completed in Clinton County, NY](/report/nyrenewableprojectpulse/nyserda-ellenburg-1037)
- [Valcour Altona Windpark: 71.89 MW land-based wind project, under development in Clinton County, NY](/report/nyrenewableprojectpulse/nyserda-valcour-altona-windpark-resrfp22-1)
- [Valcour Chateaugay Windpark: 87.63 MW land-based wind project, under development in Clinton County, NY](/report/nyrenewableprojectpulse/nyserda-valcour-chateaugay-windpark-resrfp22-1)
- [Valcour Clinton Windpark: 80.43 MW land-based wind project, under development in Clinton County, NY](/report/nyrenewableprojectpulse/nyserda-valcour-clinton-windpark-resrfp22-1)
- [Valcour Ellenburg Windpark: 90 MW land-based wind project, under development in Clinton County, NY](/report/nyrenewableprojectpulse/nyserda-valcour-ellenburg-windpark-resrfp22-1)

## COLUMBIA

- [ELP Stuyvesant Solar: 19.99 MW solar project, cancelled in Columbia County, NY](/report/nyrenewableprojectpulse/nyserda-elp-stuyvesant-solar-resrfp21-1)
- [Shepherd's Run Solar Project: 42 MW solar project, under development in Columbia County, NY](/report/nyrenewableprojectpulse/nyserda-shepherd-s-run-solar-project-resrfp24-1)
- [Shepherd's Run Solar: 60 MW solar project, cancelled in Columbia County, NY](/report/nyrenewableprojectpulse/nyserda-shepherd-s-run-solar-resrfp17-1)
- [Stuyvesant Falls: 6 MW hydroelectric project, contract completed in Columbia County, NY](/report/nyrenewableprojectpulse/nyserda-stuyvesant-falls-1851)

## CORTLAND

- [Homer Solar Energy Center: 90 MW solar project, cancelled in Cortland County, NY](/report/nyrenewableprojectpulse/nyserda-homer-solar-energy-center-resrfp20-1)
- [Homer Solar Energy Center: 90 MW solar project, under development in Cortland County, NY](/report/nyrenewableprojectpulse/nyserda-homer-solar-energy-center-resrfp24-1)
- [Janis Solar: 20 MW solar project, operational in Cortland County, NY](/report/nyrenewableprojectpulse/nyserda-janis-solar-resrfp17-1)

## DELAWARE

- [Stonewall Solar: 145 MW solar project, cancelled in Delaware County, NY](/report/nyrenewableprojectpulse/nyserda-stonewall-solar-resrfp22-1)

## DUTCHESS

- [Wappingers Falls: 0.12 MW hydroelectric project, contract completed in Dutchess County, NY](/report/nyrenewableprojectpulse/nyserda-wappingers-falls-1851)

## ERIE

- [Buffalo BioEnergy: 1.24 MW biogas / biomass project, cancelled in Erie County, NY](/report/nyrenewableprojectpulse/nyserda-buffalo-bioenergy-2554)
- [Steel Winds II: 15 MW land-based wind project, contract completed in Erie County, NY](/report/nyrenewableprojectpulse/nyserda-steel-winds-ii-1851)
- [Steel Winds Wind Farm 2: 4.4 MW land-based wind project, operational in Erie County, NY](/report/nyrenewableprojectpulse/nyserda-steel-winds-wind-farm-2-resrfp19-1)
- [Steel Winds Wind Farm: 5.84 MW land-based wind project, operational in Erie County, NY](/report/nyrenewableprojectpulse/nyserda-steel-winds-wind-farm-resrfp19-1)

## ESSEX

- [ELP Ticonderoga Solar: 19.99 MW solar project, cancelled in Essex County, NY](/report/nyrenewableprojectpulse/nyserda-elp-ticonderoga-solar-resrfp19-1)
- [ELP Ticonderoga Solar: 20 MW solar project, under development in Essex County, NY](/report/nyrenewableprojectpulse/nyserda-elp-ticonderoga-solar-resrfp24-1)

## FRANKLIN

- [Bellmont: 21 MW land-based wind project, cancelled in Franklin County, NY](/report/nyrenewableprojectpulse/nyserda-bellmont-1037)
- [Brookside Solar: 100 MW solar project, under development in Franklin County, NY](/report/nyrenewableprojectpulse/nyserda-brookside-solar-resrfp23-1)
- [Chasm Falls: 1.6 MW hydroelectric project, operational in Franklin County, NY](/report/nyrenewableprojectpulse/nyserda-chasm-falls-resrfp20-1)
- [Fort Covington Solar Farm: 250 MW solar project, cancelled in Franklin County, NY](/report/nyrenewableprojectpulse/nyserda-fort-covington-solar-farm-resrfp21-1)
- [Fort Covington Solar Farm: 250 MW solar project, under development in Franklin County, NY](/report/nyrenewableprojectpulse/nyserda-fort-covington-solar-farm-resrfp24-1)
- [North Country Wind: 298.2 MW land-based wind project, cancelled in Franklin County, NY](/report/nyrenewableprojectpulse/nyserda-north-country-wind-resrfp22-1)

## FULTON

- [Foothills Solar Farm: 40 MW solar project, cancelled in Fulton County, NY](/report/nyrenewableprojectpulse/nyserda-foothills-solar-farm-resrfp21-1)
- [SunEast Limestone Solar: 19.99 MW solar project, cancelled in Fulton County, NY](/report/nyrenewableprojectpulse/nyserda-suneast-limestone-solar-resrfp19-1)

## GENESEE

- [Alabama Solar Park: 130 MW solar project, cancelled in Genesee County, NY](/report/nyrenewableprojectpulse/nyserda-alabama-solar-park-resrfp20-1)
- [Cider Solar Farm: 500 MW solar project, cancelled in Genesee County, NY](/report/nyrenewableprojectpulse/nyserda-cider-solar-farm-resrfp20-1)
- [Cider Solar Farm: 500 MW solar project, under development in Genesee County, NY](/report/nyrenewableprojectpulse/nyserda-cider-solar-farm-resrfp23-1)
- [Excelsior Energy Center - Solar + Storage 2: 280 MW solar project, cancelled in Genesee County, NY](/report/nyrenewableprojectpulse/nyserda-excelsior-energy-center-solar-storage-2-resrfp18-1)
- [Excelsior Energy Center LLC: 280 MW solar project, under development in Genesee County, NY](/report/nyrenewableprojectpulse/nyserda-excelsior-energy-center-llc-resrfp23-1)
- [SunEast Transit Solar: 19.99 MW solar project, cancelled in Genesee County, NY](/report/nyrenewableprojectpulse/nyserda-suneast-transit-solar-resrfp20-1)

## GREENE

- [Flint Mine Solar: 100 MW solar project, cancelled in Greene County, NY](/report/nyrenewableprojectpulse/nyserda-flint-mine-solar-resrfp17-1)
- [Flint Mine Solar: 100 MW solar project, under development in Greene County, NY](/report/nyrenewableprojectpulse/nyserda-flint-mine-solar-resrfp25-1)
- [Greene County 1: 20 MW solar project, cancelled in Greene County, NY](/report/nyrenewableprojectpulse/nyserda-greene-county-1-3257)
- [Greene County 2: 10 MW solar project, cancelled in Greene County, NY](/report/nyrenewableprojectpulse/nyserda-greene-county-2-3257)
- [Greene County Energy Properties: 19.9 MW solar project, cancelled in Greene County, NY](/report/nyrenewableprojectpulse/nyserda-greene-county-energy-properties-resrfp17-1)
- [Hannacroix Solar Facility: 4.99 MW solar project, cancelled in Greene County, NY](/report/nyrenewableprojectpulse/nyserda-hannacroix-solar-facility-resrfp18-1)
- [Hecate Energy Greene 1 LLC: 20 MW solar project, under development in Greene County, NY](/report/nyrenewableprojectpulse/nyserda-hecate-energy-greene-1-llc-resrfp25-1)
- [Hecate Energy Greene 2 LLC: 10 MW solar project, under development in Greene County, NY](/report/nyrenewableprojectpulse/nyserda-hecate-energy-greene-2-llc-resrfp25-1)
- [Hecate Energy Greene County 1: 49.99 MW solar project, cancelled in Greene County, NY](/report/nyrenewableprojectpulse/nyserda-hecate-energy-greene-county-1-3257)

## HERKIMER

- [Columbia Solar Energy Center: 350 MW solar project, cancelled in Herkimer County, NY](/report/nyrenewableprojectpulse/nyserda-columbia-solar-energy-center-resrfp21-1)
- [Dolgeville Hydro: 5 MW hydroelectric project, cancelled in Herkimer County, NY](/report/nyrenewableprojectpulse/nyserda-dolgeville-hydro-resrfp22-1)
- [Dolgeville Hydro: 5 MW hydroelectric project, operational in Herkimer County, NY](/report/nyrenewableprojectpulse/nyserda-dolgeville-hydro-resrfp24-1)
- [Flat Hill Solar: 19.99 MW solar project, under development in Herkimer County, NY](/report/nyrenewableprojectpulse/nyserda-flat-hill-solar-resrfp23-1)
- [Grassy Knoll Solar: 19.99 MW solar project, under development in Herkimer County, NY](/report/nyrenewableprojectpulse/nyserda-grassy-knoll-solar-resrfp23-1)
- [Hardscrabble Wind Energy Project: 26.64 MW land-based wind project, contract completed in Herkimer County, NY](/report/nyrenewableprojectpulse/nyserda-hardscrabble-wind-energy-project-1851)
- [Hardscrabble: 74 MW land-based wind project, contract completed in Herkimer County, NY](/report/nyrenewableprojectpulse/nyserda-hardscrabble-1681)
- [Hills Solar: 19.99 MW solar project, under development in Herkimer County, NY](/report/nyrenewableprojectpulse/nyserda-hills-solar-resrfp23-1)
- [SED Hills Solar: 19.99 MW solar project, cancelled in Herkimer County, NY](/report/nyrenewableprojectpulse/nyserda-sed-hills-solar-resrfp18-1)
- [SED Watkins Road Solar 1: 19.99 MW solar project, cancelled in Herkimer County, NY](/report/nyrenewableprojectpulse/nyserda-sed-watkins-road-solar-1-resrfp18-1)
- [SunEast Flat Hill Solar: 19.99 MW solar project, cancelled in Herkimer County, NY](/report/nyrenewableprojectpulse/nyserda-suneast-flat-hill-solar-resrfp19-1)
- [SunEast Grassy Knoll Solar: 19.99 MW solar project, cancelled in Herkimer County, NY](/report/nyrenewableprojectpulse/nyserda-suneast-grassy-knoll-solar-resrfp19-1)
- [SunEast Millers Grove Solar: 19.99 MW solar project, cancelled in Herkimer County, NY](/report/nyrenewableprojectpulse/nyserda-suneast-millers-grove-solar-resrfp22-1)
- [Watkins Road Solar: 19.99 MW solar project, under development in Herkimer County, NY](/report/nyrenewableprojectpulse/nyserda-watkins-road-solar-resrfp23-1)

## JEFFERSON

- [DANC: 4.8 MW biogas / biomass project, contract completed in Jefferson County, NY](/report/nyrenewableprojectpulse/nyserda-danc-2226)
- [Glen Park: 7.18 MW hydroelectric project, operational in Jefferson County, NY](/report/nyrenewableprojectpulse/nyserda-glen-park-3257)
- [Greens Corners Solar Park: 140 MW solar project, under development in Jefferson County, NY](/report/nyrenewableprojectpulse/nyserda-greens-corners-solar-park-resrfp25-1)
- [Greens Corners Solar: 120 MW solar project, cancelled in Jefferson County, NY](/report/nyrenewableprojectpulse/nyserda-greens-corners-solar-resrfp19-1)
- [Long Falls - Ampersand: 0.33 MW hydroelectric project, operational in Jefferson County, NY](/report/nyrenewableprojectpulse/nyserda-long-falls-ampersand-tier-2-maintenance)
- [Riverside Solar: 100 MW solar project, cancelled in Jefferson County, NY](/report/nyrenewableprojectpulse/nyserda-riverside-solar-resrfp22-1)
- [Rutland Center Solar 1: 110.2 MW solar project, cancelled in Jefferson County, NY](/report/nyrenewableprojectpulse/nyserda-rutland-center-solar-1-resrfp20-1)
- [Sandy Creek Solar: 19.99 MW solar project, cancelled in Jefferson County, NY](/report/nyrenewableprojectpulse/nyserda-sandy-creek-solar-resrfp19-1)
- [Tannery Island - Tannery Island Hydro: 0.17 MW hydroelectric project, operational in Jefferson County, NY](/report/nyrenewableprojectpulse/nyserda-tannery-island-tannery-island-hydro-3257)
- [Theresa Hydroelectric Project: 1.3 MW hydroelectric project, operational in Jefferson County, NY](/report/nyrenewableprojectpulse/nyserda-theresa-hydroelectric-project-resrfp25-1)
- [Tracy Solar Energy Center: 119 MW solar project, cancelled in Jefferson County, NY](/report/nyrenewableprojectpulse/nyserda-tracy-solar-energy-center-resrfp20-1)
- [Tracy Solar Energy Center: 119 MW solar project, under development in Jefferson County, NY](/report/nyrenewableprojectpulse/nyserda-tracy-solar-energy-center-resrfp24-1)

## KINGS

- [Empire Wind: 810 MW offshore wind project, under development in Kings County, NY](/report/nyrenewableprojectpulse/nyserda-empire-wind-orecrfp23-1)

## LEWIS

- [Belfort Unit 3: 0.36 MW hydroelectric project, operational in Lewis County, NY](/report/nyrenewableprojectpulse/nyserda-belfort-unit-3-3257)
- [Eagle: 0.5 MW hydroelectric project, contract completed in Lewis County, NY](/report/nyrenewableprojectpulse/nyserda-eagle-1037)
- [Effley: 0.3 MW hydroelectric project, contract completed in Lewis County, NY](/report/nyrenewableprojectpulse/nyserda-effley-1168)
- [Lyons Falls Hydro: 8.59 MW hydroelectric project, contract completed in Lewis County, NY](/report/nyrenewableprojectpulse/nyserda-lyons-falls-hydro-tier-2-maintenance)
- [Lyons Falls Mill Hydro: 5.51 MW hydroelectric project, cancelled in Lewis County, NY](/report/nyrenewableprojectpulse/nyserda-lyons-falls-mill-hydro-3084)
- [Lyons Falls Mill Redevelopment: 3.28 MW hydroelectric project, cancelled in Lewis County, NY](/report/nyrenewableprojectpulse/nyserda-lyons-falls-mill-redevelopment-resrfp17-1)
- [Lyons Falls Mill Repower: 7.5 MW hydroelectric project, under development in Lewis County, NY](/report/nyrenewableprojectpulse/nyserda-lyons-falls-mill-repower-resrfp24-1)
- [Lyonsdale: biogas / biomass project, contract completed in Lewis County, NY](/report/nyrenewableprojectpulse/nyserda-lyonsdale-rps-maintenance)
- [Moose River Hydro: 12.2 MW hydroelectric project, contract completed in Lewis County, NY](/report/nyrenewableprojectpulse/nyserda-moose-river-hydro-t2rfp21-1)
- [Number Three Wind Farm: 103.9 MW land-based wind project, operational in Lewis County, NY](/report/nyrenewableprojectpulse/nyserda-number-three-wind-farm-3257)
- [Roaring Brook Wind: 79.73 MW land-based wind project, operational in Lewis County, NY](/report/nyrenewableprojectpulse/nyserda-roaring-brook-wind-resrfp18-1)
- [Taylorville Hydro: 0.1 MW hydroelectric project, contract completed in Lewis County, NY](/report/nyrenewableprojectpulse/nyserda-taylorville-hydro-1851)

## LIVINGSTON

- [Hatchery Solar: 19.99 MW solar project, cancelled in Livingston County, NY](/report/nyrenewableprojectpulse/nyserda-hatchery-solar-resrfp22-1)
- [Hatchery Solar: 19.99 MW solar project, cancelled in Livingston County, NY](/report/nyrenewableprojectpulse/nyserda-hatchery-solar-resrfp20-1)
- [Highbanks Solar: 12.5 MW solar project, under development in Livingston County, NY](/report/nyrenewableprojectpulse/nyserda-highbanks-solar-resrfp24-1)
- [Highbanks Solar: 19.99 MW solar project, cancelled in Livingston County, NY](/report/nyrenewableprojectpulse/nyserda-highbanks-solar-resrfp20-1)
- [Horseshoe Solar Energy Center: 180 MW solar project, under development in Livingston County, NY](/report/nyrenewableprojectpulse/nyserda-horseshoe-solar-energy-center-resrfp24-1)
- [Horseshoe Solar: 180 MW solar project, cancelled in Livingston County, NY](/report/nyrenewableprojectpulse/nyserda-horseshoe-solar-resrfp18-1)
- [Morris Ridge Solar: 177 MW solar project, operational in Livingston County, NY](/report/nyrenewableprojectpulse/nyserda-morris-ridge-solar-resrfp18-1)
- [SunEast Hampton Corners Solar: 19.99 MW solar project, cancelled in Livingston County, NY](/report/nyrenewableprojectpulse/nyserda-suneast-hampton-corners-solar-resrfp22-1)
- [White Creek Solar, LLC: 135 MW solar project, under development in Livingston County, NY](/report/nyrenewableprojectpulse/nyserda-white-creek-solar-llc-resrfp22-1)

## MADISON

- [Oxbow Hill Solar: 140 MW solar project, cancelled in Madison County, NY](/report/nyrenewableprojectpulse/nyserda-oxbow-hill-solar-resrfp22-1)

## MONTGOMERY

- [Double Lock Solar: 19.99 MW solar project, cancelled in Montgomery County, NY](/report/nyrenewableprojectpulse/nyserda-double-lock-solar-resrfp17-1)
- [Flat Creek Solar: 300 MW solar project, cancelled in Montgomery County, NY](/report/nyrenewableprojectpulse/nyserda-flat-creek-solar-resrfp24-1)
- [Grissom Solar: 20 MW solar project, operational in Montgomery County, NY](/report/nyrenewableprojectpulse/nyserda-grissom-solar-resrfp17-1)
- [High River Energy Center: 90 MW solar project, operational in Montgomery County, NY](/report/nyrenewableprojectpulse/nyserda-high-river-energy-center-resrfp17-1)
- [Mill Point Solar 2: 100 MW solar project, cancelled in Montgomery County, NY](/report/nyrenewableprojectpulse/nyserda-mill-point-solar-2-resrfp21-1)
- [Mill Point Solar I: 223 MW solar project, under development in Montgomery County, NY](/report/nyrenewableprojectpulse/nyserda-mill-point-solar-i-resrfp24-1)
- [Mill Point Solar: 250 MW solar project, cancelled in Montgomery County, NY](/report/nyrenewableprojectpulse/nyserda-mill-point-solar-resrfp20-1)
- [Mohawk Solar: 90.5 MW solar project, cancelled in Montgomery County, NY](/report/nyrenewableprojectpulse/nyserda-mohawk-solar-resrfp18-1)
- [Regan Solar: 20 MW solar project, operational in Montgomery County, NY](/report/nyrenewableprojectpulse/nyserda-regan-solar-resrfp17-1)
- [SunEast Flat Creek Solar II: 100 MW solar project, cancelled in Montgomery County, NY](/report/nyrenewableprojectpulse/nyserda-suneast-flat-creek-solar-ii-resrfp21-1)
- [SunEast Flat Creek Solar: 200 MW solar project, cancelled in Montgomery County, NY](/report/nyrenewableprojectpulse/nyserda-suneast-flat-creek-solar-resrfp20-1)
- [SunEast Tabletop Solar: 80 MW solar project, cancelled in Montgomery County, NY](/report/nyrenewableprojectpulse/nyserda-suneast-tabletop-solar-resrfp19-1)
- [Tayandenega Solar: 15 MW solar project, cancelled in Montgomery County, NY](/report/nyrenewableprojectpulse/nyserda-tayandenega-solar-resrfp23-1)
- [Tayandenega Solar: 19.99 MW solar project, cancelled in Montgomery County, NY](/report/nyrenewableprojectpulse/nyserda-tayandenega-solar-resrfp17-1)

## NIAGARA

- [Bear Ridge Solar: 100 MW solar project, cancelled in Niagara County, NY](/report/nyrenewableprojectpulse/nyserda-bear-ridge-solar-resrfp21-1)
- [Bear Ridge Solar: 92.98 MW solar project, under development in Niagara County, NY](/report/nyrenewableprojectpulse/nyserda-bear-ridge-solar-resrfp23-1)
- [Burt Dam Incremental Hydro: 0.09 MW hydroelectric project, cancelled in Niagara County, NY](/report/nyrenewableprojectpulse/nyserda-burt-dam-incremental-hydro-3257)
- [Modern: 6.4 MW biogas / biomass project, contract completed in Niagara County, NY](/report/nyrenewableprojectpulse/nyserda-modern-2226)
- [Niagara BioEnergy: 0.85 MW biogas / biomass project, cancelled in Niagara County, NY](/report/nyrenewableprojectpulse/nyserda-niagara-bioenergy-2554)
- [Niagara Generating Facility*: 26 MW biogas / biomass project, contract completed in Niagara County, NY](/report/nyrenewableprojectpulse/nyserda-niagara-generating-facility--1037)
- [Ridge View Solar Energy Center: 350 MW solar project, cancelled in Niagara County, NY](/report/nyrenewableprojectpulse/nyserda-ridge-view-solar-energy-center-resrfp21-1)
- [Somerset Solar: 125 MW solar project, cancelled in Niagara County, NY](/report/nyrenewableprojectpulse/nyserda-somerset-solar-resrfp22-1)

## ONEIDA

- [Flat Stone Solar: 19.99 MW solar project, under development in Oneida County, NY](/report/nyrenewableprojectpulse/nyserda-flat-stone-solar-resrfp23-1)
- [Kayuta Lake Hydro _July 2021 Award: 0.46 MW hydroelectric project, cancelled in Oneida County, NY](/report/nyrenewableprojectpulse/nyserda-kayuta-lake-hydro-july-2021-award-tier-2-maintenance)
- [Kayuta Lake Hydro: 0.46 MW hydroelectric project, contract completed in Oneida County, NY](/report/nyrenewableprojectpulse/nyserda-kayuta-lake-hydro-tier-2-maintenance)
- [Newport Solar Farm: 130 MW solar project, cancelled in Oneida County, NY](/report/nyrenewableprojectpulse/nyserda-newport-solar-farm-resrfp21-1)
- [SED Skyline Solar: 19.99 MW solar project, cancelled in Oneida County, NY](/report/nyrenewableprojectpulse/nyserda-sed-skyline-solar-resrfp18-1)
- [Skyline Solar: 20 MW solar project, under development in Oneida County, NY](/report/nyrenewableprojectpulse/nyserda-skyline-solar-resrfp24-1)
- [SunEast Augustus Solar: 19.99 MW solar project, cancelled in Oneida County, NY](/report/nyrenewableprojectpulse/nyserda-suneast-augustus-solar-resrfp20-1)
- [SunEast Flat Stone Solar: 19.99 MW solar project, cancelled in Oneida County, NY](/report/nyrenewableprojectpulse/nyserda-suneast-flat-stone-solar-resrfp20-1)

## ONONDAGA

- [Baldwinsville: 0.6 MW hydroelectric project, contract completed in Onondaga County, NY](/report/nyrenewableprojectpulse/nyserda-baldwinsville-t2rfp21-1)
- [Sky High Solar: 19.99 MW solar project, cancelled in Onondaga County, NY](/report/nyrenewableprojectpulse/nyserda-sky-high-solar-resrfp17-1)
- [SunEast Clay Solar: 19.99 MW solar project, cancelled in Onondaga County, NY](/report/nyrenewableprojectpulse/nyserda-suneast-clay-solar-resrfp18-1)
- [Wave Hydro: 0.95 MW hydroelectric project, cancelled in Onondaga County, NY](/report/nyrenewableprojectpulse/nyserda-wave-hydro-2226)

## ONTARIO

- [Henkel US Operations Corp - Geneva Facility: 3.3 MW land-based wind project, contract completed in Ontario County, NY](/report/nyrenewableprojectpulse/nyserda-henkel-us-operations-corp-geneva-facility-2554)
- [Manchester Solar: 19.99 MW solar project, cancelled in Ontario County, NY](/report/nyrenewableprojectpulse/nyserda-manchester-solar-resrfp18-1)
- [Ontario: 6.4 MW biogas / biomass project, contract completed in Ontario County, NY](/report/nyrenewableprojectpulse/nyserda-ontario-2226)
- [Trelina Solar Energy Center, LLC: 79.8 MW solar project, under development in Ontario County, NY](/report/nyrenewableprojectpulse/nyserda-trelina-solar-energy-center-llc-resrfp23-1)

## ORANGE

- [Little Pond Solar: 19.99 MW solar project, cancelled in Orange County, NY](/report/nyrenewableprojectpulse/nyserda-little-pond-solar-resrfp23-1)
- [Little Pond Solar: 19.99 MW solar project, cancelled in Orange County, NY](/report/nyrenewableprojectpulse/nyserda-little-pond-solar-resrfp17-1)
- [Rising Solar: 20 MW solar project, cancelled in Orange County, NY](/report/nyrenewableprojectpulse/nyserda-rising-solar-resrfp17-1)

## ORLEANS

- [Hemlock Ridge Solar: 200 MW solar project, cancelled in Orleans County, NY](/report/nyrenewableprojectpulse/nyserda-hemlock-ridge-solar-resrfp22-1)
- [Heritage Wind, LLC: 126 MW land-based wind project, under development in Orleans County, NY](/report/nyrenewableprojectpulse/nyserda-heritage-wind-llc-resrfp23-1)
- [Heritage Wind: 147 MW land-based wind project, cancelled in Orleans County, NY](/report/nyrenewableprojectpulse/nyserda-heritage-wind-resrfp18-1)
- [Orleans Solar: 200 MW solar project, cancelled in Orleans County, NY](/report/nyrenewableprojectpulse/nyserda-orleans-solar-resrfp20-1)

## OSWEGO

- [ELP Granby Solar II: 19.99 MW solar project, under development in Oswego County, NY](/report/nyrenewableprojectpulse/nyserda-elp-granby-solar-ii-resrfp23-1)
- [Fulton Unit 1: 0.87 MW hydroelectric project, operational in Oswego County, NY](/report/nyrenewableprojectpulse/nyserda-fulton-unit-1-3257)
- [Fulton Unit 2: 0.45 MW hydroelectric project, operational in Oswego County, NY](/report/nyrenewableprojectpulse/nyserda-fulton-unit-2-3084)
- [High Dam Hydroelectric Facility: 9.2 MW hydroelectric project, operational in Oswego County, NY](/report/nyrenewableprojectpulse/nyserda-high-dam-hydroelectric-facility-resrfp25-1)
- [Oswego Falls: 0.6 MW hydroelectric project, contract completed in Oswego County, NY](/report/nyrenewableprojectpulse/nyserda-oswego-falls-1037)

## QUEENS

- [ATT Clean Energy Project - Rego Park: 0.2 MW fuel cell / other project, contract completed in Queens County, NY](/report/nyrenewableprojectpulse/nyserda-att-clean-energy-project-rego-park-2554)