# ALLETE, INC.: $49,985,072 Grid Infrastructure Deployment & Resilience award

**Funded Project Score:** 35/100

| Field | Value |
|---|---|
| Recipient | ALLETE, INC. |
| State | MN |
| Program | Grid Infrastructure Deployment & Resilience (81.254) |
| Award | $49,985,072 |
| Period | 2024-10-01 to 2029-09-30 |
| Agency | Department of Energy / Department of Energy |
| Description | BIPARTISAN INFRASTRUCTURE LAW (BIL): MINNESOTA POWER HIGH-VOLTAGE DIRECT CURRENT (HVDC) TERMINATION EXPANSION CAPABILITY (HTEC) PROJECT. THE OVERALL GOAL OF THIS PROJECT IS TO WORK WITH A HIGH-VOLTAGE DIRECT CURRENT (HVDC) SUPPLIER TO DESIGN AND BUILD TWO VOLTAGE SOURCE CONVERTER (VSC) HVDC TERMINAL STATIONS CAPABLE OF DELIVERING 1500 MEGAWATTS (MW), ENSURING THAT THEY ARE SIZED AND CONFIGURED FOR FUTURE LOCAL AND REGIONAL GRID EXPANSION. HVDC TERMINAL STATIONS ARE DESIGNED, AND EQUIPMENT IS MANUFACTURED BY A LIMITED NUMBER OF SUPPLIERS GLOBALLY. |
| Award ID | DEGD0000924 |

## Why this score
- Award of $5M or more.

Source: USAspending.gov federal assistance awards (Assistance Listings 81.254, 81.255, 81.256) (https://www.usaspending.gov/award/ASST_NON_DEGD0000924_089). Last refreshed: 2026-11-03T18:30:24.609Z.
Award data comes from USAspending.gov as reported by federal agencies and can lag or be revised; an award is not a procurement opportunity by itself. Organizations only; awards redacted for individual privacy are excluded. Informational only.
