# Moran Environmental Recovery — MER to set up an work area at 25 Ames Street in Cambridge, MA MIT campus. MER will be working for United Civil to remove asbestos containing materials inside steam coffin and piping this work will include approximately 800 SF asbestos Black Mastic on top of precast con

**Score:** 82/100

| Field | Value |
|---|---|
| Organization | Moran Environmental Recovery |
| Filing Date | 2026-02-13 |
| Jurisdiction | MA |
| Locality | 1197940 |
| Classification | MER to set up an work area at 25 Ames Street in Cambridge, MA MIT campus. MER will be working for United Civil to remove asbestos containing materials inside steam coffin and piping this work will include approximately 800 SF asbestos Black Mastic on top of precast concrete covers over de-energized steam lines supply and return inside trench. Asbestos pipe insulation to be abated is 185 LF total this work will be performed utilizing full containment methods for all removal operations for this project |
| Reported Metric | 5000 |
| Dataset Source | Cambridge Open Data (jrxr-y9ty) |

## Why this score
- Official Cambridge Open Data commercial filing (jrxr-y9ty)
- Active reported metric (5,000)
- Recent filing window (2026-02-13)
- Jurisdiction: MA

Source: Cambridge Open Data — Asbestos Removal Permits (jrxr-y9ty) (https://data.cambridgema.gov/d/jrxr-y9ty). Last refreshed: 2026-11-04T06:11:41.242Z.
Source: Cambridge Open Data (data.cambridgema.gov, dataset jrxr-y9ty). Public registry publication is a routine administrative record and is not a finding of fault, violation, or noncompliance. Individual and sole-proprietor records are excluded; verify directly with the issuing agency before taking action.
