# Hylan Datacom & Electrical LLC: 3 NOVs, 2 CARs on NYC street work, 2026-05-30

**Score:** 80/100

| Field | Value |
|---|---|
| Permittee | Hylan Datacom & Electrical LLC |
| Permittee type | Contractor or developer |
| Inspection date | 2026-05-30 |
| NOVs | 3 |
| CARs | 2 |
| Failed re-inspections | 0 |
| Violations | Except as in NYC Administrative Code § 19-152, failure to install or seal expansion joints as per subsection / Failure to provide smooth riding surface free of defects in the final completed wearing course |
| Permit types | Open Protected Sidewalk For Foundation; Install Traffic Signals - Protected; Install Traffic Signals |
| Streets | Pierrepont Street; Pierrepont Place; Montague Terrace |

## Why this score
- Corrective action request: a cut must be re-paved.
- Notice of violation issued.
- 5 findings in one day.
- Private contractor: buys restoration and compliance help.

Source: NYC Department of Transportation street construction inspections and corrective action requests (data.cityofnewyork.us) (https://data.cityofnewyork.us/d/ydkf-mpxb). Last refreshed: 2026-11-04T21:56:41.437Z.
From NYC DOT street construction inspection data, published about monthly. A notice of violation is an allegation adjudicated at OATH and a corrective action request is a repair request; neither is a finding of fault, and outcomes are not shown. Only organizations with a legal-entity form, public bodies and utilities are shown. Verify with NYC DOT.