# Hylan Datacom & Electrical LLC: 2 NOVs, 3 CARs on NYC street work, 2026-07-28

**Score:** 80/100

| Field | Value |
|---|---|
| Permittee | Hylan Datacom & Electrical LLC |
| Permittee type | Contractor or developer |
| Inspection date | 2026-07-28 |
| NOVs | 2 |
| CARs | 3 |
| Failed re-inspections | 0 |
| Violations | Use/opening of street without DOT permit / Except as in NYC Administrative Code § 19-152, failure to fully replace defective sidewalk flag |
| Permit types | Open Protected Sidewalk For Foundation; Non Permit; Open Sidewalk To Install Foundation |
| Streets | Pierrepont Street; Monroe Place; Hicks Street; West 25 Street; West 91 Street |

## Why this score
- Corrective action request: a cut must be re-paved.
- Notice of violation issued.
- 5 findings in one day.
- Private contractor: buys restoration and compliance help.

Source: NYC Department of Transportation street construction inspections and corrective action requests (data.cityofnewyork.us) (https://data.cityofnewyork.us/d/ydkf-mpxb). Last refreshed: 2026-11-04T21:56:41.437Z.
From NYC DOT street construction inspection data, published about monthly. A notice of violation is an allegation adjudicated at OATH and a corrective action request is a repair request; neither is a finding of fault, and outcomes are not shown. Only organizations with a legal-entity form, public bodies and utilities are shown. Verify with NYC DOT.
