# Amf Electrical Contracting Corp.: 7 NOVs, 1 CAR on NYC street work, 2026-07-21

**Score:** 80/100

| Field | Value |
|---|---|
| Permittee | Amf Electrical Contracting Corp. |
| Permittee type | Contractor or developer |
| Inspection date | 2026-07-21 |
| NOVs | 7 |
| CARs | 1 |
| Failed re-inspections | 0 |
| Violations | Immediately upon completion of backfill, 4 inches of temporary asphalt must be applied. / Failure to comply with terms and conditions of DOT permit / Failure to obtain a confirmation number prior to expiration of DOT street opening permit (protected street) |
| Permit types | Major Installations - Cable; Open Sidewalk To Install Foundation; Major Installations - Cable-Protected; Open Protected Sidewalk For Foundation |
| Streets | Clove Road; Kings Highway; 11 Avenue; Avenue R |

## Why this score
- Corrective action request: a cut must be re-paved.
- Notice of violation issued.
- 8 findings in one day.
- Private contractor: buys restoration and compliance help.

Source: NYC Department of Transportation street construction inspections and corrective action requests (data.cityofnewyork.us) (https://data.cityofnewyork.us/d/ydkf-mpxb). Last refreshed: 2026-10-28T20:51:30.518Z.
From NYC DOT street construction inspection data, published about monthly. A notice of violation is an allegation adjudicated at OATH and a corrective action request is a repair request; neither is a finding of fault, and outcomes are not shown. Only organizations with a legal-entity form, public bodies and utilities are shown. Verify with NYC DOT.