# Apm Services Group Corp: 1 NOV, 3 CARs on NYC street work, 2026-09-21

**Score:** 90/100

| Field | Value |
|---|---|
| Permittee | Apm Services Group Corp |
| Permittee type | Contractor or developer |
| Inspection date | 2026-09-21 |
| NOVs | 1 |
| CARs | 3 |
| Failed re-inspections | 0 |
| Violations | Except as in NYC Administrative Code § 19-152, failure to install pedestrian ramp as per DOT drawings |
| Permit types | Pave Street-W/ Engineering & Insp Fee-P; Ped Ramp Replace/Modify/Install General Contractor |
| Streets | President Street; Prospect Park West; Henry Street; Avenue C |

## Why this score
- Corrective action request: a cut must be re-paved.
- Notice of violation issued.
- 4 findings in one day.
- Private contractor: buys restoration and compliance help.
- In the latest monthly release.

Source: NYC Department of Transportation street construction inspections and corrective action requests (data.cityofnewyork.us) (https://data.cityofnewyork.us/d/ydkf-mpxb). Last refreshed: 2026-10-28T20:51:30.518Z.
From NYC DOT street construction inspection data, published about monthly. A notice of violation is an allegation adjudicated at OATH and a corrective action request is a repair request; neither is a finding of fault, and outcomes are not shown. Only organizations with a legal-entity form, public bodies and utilities are shown. Verify with NYC DOT.
