# Consolidated Edison (Con Edison): 29 NOVs, 64 CARs, 4 failed re-inspections on NYC street work, 2026-05-05

**Score:** 75/100

| Field | Value |
|---|---|
| Permittee | Consolidated Edison (Con Edison) |
| Permittee type | Utility or telecom |
| Inspection date | 2026-05-05 |
| NOVs | 29 |
| CARs | 64 |
| Failed re-inspections | 4 |
| Violations | Failure to comply with terms and conditions of DOT permit / Use/opening of street without DOT permit / Failure to repair defective street condition found within an area extending 12 inches outward from the perimeter of the cover/grating / Obstruction of any portion of street with construction materials/equipment without DOT permit / Failure to permanently restore cut within required time |
| Permit types | Non Permit; Construct Or Alter Manhole &/Or Casting; Major Installation - Gas; Major Installations - High Voltage (+17 more) |
| Streets | West 28 Street; Rockaway Parkway; Monroe Avenue; Astoria Boulevard; Frisby Avenue; Cross Bronx Expressway (+72 more) |

## Why this score
- Corrective action request: a cut must be re-paved.
- Notice of violation issued.
- 97 findings in one day.

Source: NYC Department of Transportation street construction inspections and corrective action requests (data.cityofnewyork.us) (https://data.cityofnewyork.us/d/ydkf-mpxb). Last refreshed: 2026-10-28T20:51:30.518Z.
From NYC DOT street construction inspection data, published about monthly. A notice of violation is an allegation adjudicated at OATH and a corrective action request is a repair request; neither is a finding of fault, and outcomes are not shown. Only organizations with a legal-entity form, public bodies and utilities are shown. Verify with NYC DOT.