# Consolidated Edison (Con Edison): 99 NOVs, 36 CARs, 2 failed re-inspections on NYC street work, 2026-05-23

**Score:** 75/100

| Field | Value |
|---|---|
| Permittee | Consolidated Edison (Con Edison) |
| Permittee type | Utility or telecom |
| Inspection date | 2026-05-23 |
| NOVs | 99 |
| CARs | 36 |
| Failed re-inspections | 2 |
| Violations | Failure to permanently restore cut within required time / Failure to repair defective street condition found within an area extending 12 inches outward from the perimeter of the cover/grating / Failure to obtain proper permits to repair the conditions reported on a CAR. / Failure to provide smooth riding surface free of defects in the final completed wearing course / Failure to restore in kind all roadway pavement markings |
| Permit types | Repair Gas; Repair Electric/Communications; Non Permit; Major Installation - Gas (+14 more) |
| Streets | 230 Street; Barnett Avenue; Washington Avenue; 80 Street; Kalmia Avenue; 23 Avenue (+101 more) |

## Why this score
- Corrective action request: a cut must be re-paved.
- Notice of violation issued.
- 137 findings in one day.

Source: NYC Department of Transportation street construction inspections and corrective action requests (data.cityofnewyork.us) (https://data.cityofnewyork.us/d/ydkf-mpxb). Last refreshed: 2026-11-04T21:56:41.437Z.
From NYC DOT street construction inspection data, published about monthly. A notice of violation is an allegation adjudicated at OATH and a corrective action request is a repair request; neither is a finding of fault, and outcomes are not shown. Only organizations with a legal-entity form, public bodies and utilities are shown. Verify with NYC DOT.
