# Consolidated Edison (Con Edison): 88 NOVs, 35 CARs on NYC street work, 2026-06-06

**Score:** 75/100

| Field | Value |
|---|---|
| Permittee | Consolidated Edison (Con Edison) |
| Permittee type | Utility or telecom |
| Inspection date | 2026-06-06 |
| NOVs | 88 |
| CARs | 35 |
| Failed re-inspections | 0 |
| Violations | Failure to provide smooth riding surface free of defects in the final completed wearing course / Except as in NYC Administrative Code § 19-152, failure to install or seal expansion joints as per subsection / Failure to permanently restore cut within required time / Failure to obtain proper permits to repair the conditions reported on a CAR. / Failure to conform to the applicable Standard Detail Drawing #H-1042 or DOT approved standard (protected street) |
| Permit types | Non Permit; Repair Gas; Tributary Install - Electric; Regrade Hardware (+21 more) |
| Streets | East 40 Street; East 79 Street; Clinton Avenue; 2 Street; 44 Drive; 21 Street (+89 more) |

## Why this score
- Corrective action request: a cut must be re-paved.
- Notice of violation issued.
- 123 findings in one day.

Source: NYC Department of Transportation street construction inspections and corrective action requests (data.cityofnewyork.us) (https://data.cityofnewyork.us/d/ydkf-mpxb). Last refreshed: 2026-10-28T20:51:30.518Z.
From NYC DOT street construction inspection data, published about monthly. A notice of violation is an allegation adjudicated at OATH and a corrective action request is a repair request; neither is a finding of fault, and outcomes are not shown. Only organizations with a legal-entity form, public bodies and utilities are shown. Verify with NYC DOT.
