# Consolidated Edison (Con Edison): 34 NOVs, 29 CARs, 2 failed re-inspections on NYC street work, 2026-08-31

**Score:** 75/100

| Field | Value |
|---|---|
| Permittee | Consolidated Edison (Con Edison) |
| Permittee type | Utility or telecom |
| Inspection date | 2026-08-31 |
| NOVs | 34 |
| CARs | 29 |
| Failed re-inspections | 2 |
| Violations | Failure to properly fasten plating and decking / Failure to comply with all applicable sections of the Highway Rules, the Standard Specifications, Standard Detail Drawings, and all other applicable laws or rules / Failure to permanently restore cut within required time / Obstruction of any portion of street with construction materials/equipment without DOT permit / Use/opening of street without DOT permit |
| Permit types | Major Installations - High Voltage; Replacement Of Poles-Protected; Conduit Construction And Franchise-Prot; Non Permit (+17 more) |
| Streets | East 94 Street; 58 Avenue; East 3 Street; Guy R Brewer Boulevard; Adee Avenue; Forest Hill Road (+46 more) |

## Why this score
- Corrective action request: a cut must be re-paved.
- Notice of violation issued.
- 65 findings in one day.

Source: NYC Department of Transportation street construction inspections and corrective action requests (data.cityofnewyork.us) (https://data.cityofnewyork.us/d/ydkf-mpxb). Last refreshed: 2026-10-28T20:51:30.518Z.
From NYC DOT street construction inspection data, published about monthly. A notice of violation is an allegation adjudicated at OATH and a corrective action request is a repair request; neither is a finding of fault, and outcomes are not shown. Only organizations with a legal-entity form, public bodies and utilities are shown. Verify with NYC DOT.
