# Empire City Subway Company (Limited): 4 NOVs, 1 CAR on NYC street work, 2026-07-30

**Score:** 65/100

| Field | Value |
|---|---|
| Permittee | Empire City Subway Company (Limited) |
| Permittee type | Utility or telecom |
| Inspection date | 2026-07-30 |
| NOVs | 4 |
| CARs | 1 |
| Failed re-inspections | 0 |
| Violations | Installing asphalt on a concrete street or concrete bus stop area / Except as in NYC Administrative Code § 19-152, failure to fully replace defective sidewalk flag / Failure to obtain a confirmation number two hours prior to the commencement of a backfill on a protected street / Use/opening of street without DOT permit |
| Permit types | Major Installation - Telephone-Protected; Repair Sidewalk; Non Permit |
| Streets | East 32 Street; Bryant Avenue; Ludlow Street; 6 Avenue; 1 Avenue |

## Why this score
- Corrective action request: a cut must be re-paved.
- Notice of violation issued.
- 5 findings in one day.

Source: NYC Department of Transportation street construction inspections and corrective action requests (data.cityofnewyork.us) (https://data.cityofnewyork.us/d/ydkf-mpxb). Last refreshed: 2026-11-04T21:56:41.437Z.
From NYC DOT street construction inspection data, published about monthly. A notice of violation is an allegation adjudicated at OATH and a corrective action request is a repair request; neither is a finding of fault, and outcomes are not shown. Only organizations with a legal-entity form, public bodies and utilities are shown. Verify with NYC DOT.