# National Grid (Brooklyn Union Gas): 8 NOVs, 14 CARs on NYC street work, 2026-06-04

**Score:** 75/100

| Field | Value |
|---|---|
| Permittee | National Grid (Brooklyn Union Gas) |
| Permittee type | Utility or telecom |
| Inspection date | 2026-06-04 |
| NOVs | 8 |
| CARs | 14 |
| Failed re-inspections | 0 |
| Violations | Obstruction of any portion of street with construction materials/equipment without DOT permit / Failure to comply with terms and conditions of DOT permit / Failure to properly place and ramp plating and decking a minimum of 12 inches beyond the edge of the trench / Debris/construction materials obstructing sidewalks, gutters, crosswalks, and driveways without DOT permit |
| Permit types | Major Installations - Gas-Protected; Major Installation - Gas; Repair Gas; Repair Gas - Protected (+2 more) |
| Streets | 69 Lane; 3 Avenue; Springfield Boulevard; East 94 Street; Parkside Avenue; Bleecker Street (+15 more) |

## Why this score
- Corrective action request: a cut must be re-paved.
- Notice of violation issued.
- 22 findings in one day.

Source: NYC Department of Transportation street construction inspections and corrective action requests (data.cityofnewyork.us) (https://data.cityofnewyork.us/d/ydkf-mpxb). Last refreshed: 2026-10-28T20:51:30.518Z.
From NYC DOT street construction inspection data, published about monthly. A notice of violation is an allegation adjudicated at OATH and a corrective action request is a repair request; neither is a finding of fault, and outcomes are not shown. Only organizations with a legal-entity form, public bodies and utilities are shown. Verify with NYC DOT.
