# National Grid (Brooklyn Union Gas): 10 NOVs, 16 CARs on NYC street work, 2026-07-28

**Score:** 75/100

| Field | Value |
|---|---|
| Permittee | National Grid (Brooklyn Union Gas) |
| Permittee type | Utility or telecom |
| Inspection date | 2026-07-28 |
| NOVs | 10 |
| CARs | 16 |
| Failed re-inspections | 0 |
| Violations | Failure to obtain a confirmation number prior to expiration of DOT street opening permit (protected street) / Except as in NYC Administrative Code § 19-152, failure to install or seal expansion joints as per subsection / Failure to properly fasten plating and decking / Obstruction of any portion of street with construction materials/equipment without DOT permit / Except as in NYC Administrative Code § 19-152, failure to install pedestrian ramp as per DOT drawings |
| Permit types | Ped Ramp Replace/Modify/Install Utilities Corporation; Major Installation - Gas; Major Installations - Gas-Protected; Non Permit (+3 more) |
| Streets | Autumn Avenue; 19 Street; 54 Street; Jamaica Avenue; 194 Street; Crown Street (+12 more) |

## Why this score
- Corrective action request: a cut must be re-paved.
- Notice of violation issued.
- 26 findings in one day.

Source: NYC Department of Transportation street construction inspections and corrective action requests (data.cityofnewyork.us) (https://data.cityofnewyork.us/d/ydkf-mpxb). Last refreshed: 2026-10-28T20:51:30.518Z.
From NYC DOT street construction inspection data, published about monthly. A notice of violation is an allegation adjudicated at OATH and a corrective action request is a repair request; neither is a finding of fault, and outcomes are not shown. Only organizations with a legal-entity form, public bodies and utilities are shown. Verify with NYC DOT.