# Verizon New York Inc.: 3 NOVs, 17 CARs on NYC street work, 2026-08-31

**Score:** 75/100

| Field | Value |
|---|---|
| Permittee | Verizon New York Inc. |
| Permittee type | Utility or telecom |
| Inspection date | 2026-08-31 |
| NOVs | 3 |
| CARs | 17 |
| Failed re-inspections | 0 |
| Violations | Failure to replace loose, slippery or broken utility maintenance hole (manhole) covers, castings, and other street hardware / Except as in NYC Administrative Code § 19-152, failure to install or seal expansion joints as per subsection / Except as in NYC Administrative Code § 19-152, failure to install pedestrian ramp as per DOT drawings |
| Permit types | Non Permit; Ped Ramp Replace/Modify/Install Utilities Corporation |
| Streets | East 98 Street; Quimby Avenue; Story Avenue; Ada Drive; 15 Avenue; 75 Road (+7 more) |

## Why this score
- Corrective action request: a cut must be re-paved.
- Notice of violation issued.
- 20 findings in one day.

Source: NYC Department of Transportation street construction inspections and corrective action requests (data.cityofnewyork.us) (https://data.cityofnewyork.us/d/ydkf-mpxb). Last refreshed: 2026-10-28T20:51:30.518Z.
From NYC DOT street construction inspection data, published about monthly. A notice of violation is an allegation adjudicated at OATH and a corrective action request is a repair request; neither is a finding of fault, and outcomes are not shown. Only organizations with a legal-entity form, public bodies and utilities are shown. Verify with NYC DOT.
