# East Bank Plant: 50,000-gallon sewage overflow (line break) in Shelby County, TX

**Score:** 55/100

| Field | Value |
|---|---|
| Utility / system | East Bank Plant |
| System type | Treatment plant (WWTP) |
| TCEQ RN | RN101614014 |
| Permits | WASTEWATER-PERMIT-WQ0010063003 |
| Volume | 50,000 gallons |
| Cause | LINE BREAK |
| Source | Texas Commission on Environmental Quality (TCEQ) Sanitary Sewer Overflows (data.texas.gov) |
| County | Shelby |
| TCEQ region | Beaumont |
| Dates | 2026-07-20 |
| Reported | 2026-07-29 |
| Incident number | 464576 |

## Why this score
- 50,000 gallons.
- Line break: a fixable infrastructure cause.

Source: Texas Commission on Environmental Quality (TCEQ) Sanitary Sewer Overflows (data.texas.gov) (https://data.texas.gov/d/8kc5-95uk). Last refreshed: 2026-10-28T20:50:27.175Z.
From TCEQ Sanitary Sewer Overflow reports, which TCEQ publishes in monthly batches (recent weeks may not appear yet). Volumes are as reported by the utility and are often estimates. Utility/system level only. Verify with TCEQ.
