# Sugar Land North Wastewater Treatment Plant: 1,200-gallon sewage overflow (grease blockage) in Fort Bend County, TX

**Score:** 45/100

| Field | Value |
|---|---|
| Utility / system | Sugar Land North Wastewater Treatment Plant |
| System type | Treatment plant (WWTP) |
| TCEQ RN | RN102097078 |
| Permits | STORMWATER-PERMIT-TXR05T069; WASTEWATER-EPA ID-TX0058114; WASTEWATER-PERMIT-WQ0011317001 |
| Volume | 1,200 gallons |
| Cause | LINE BLOCKAGE (NON-GREASE) |
| Source | Texas Commission on Environmental Quality (TCEQ) Sanitary Sewer Overflows (data.texas.gov) |
| County | Fort Bend |
| TCEQ region | Houston |
| Dates | 2026-08-01 |
| Reported | 2026-08-02 |
| Incident number | 463259 |

## Why this score
- 1,200 gallons.
- Grease blockage: a fixable infrastructure cause.

Source: Texas Commission on Environmental Quality (TCEQ) Sanitary Sewer Overflows (data.texas.gov) (https://data.texas.gov/d/8kc5-95uk). Last refreshed: 2026-11-04T21:50:46.460Z.
From TCEQ Sanitary Sewer Overflow reports, which TCEQ publishes in monthly batches (recent weeks may not appear yet). Volumes are as reported by the utility and are often estimates. Utility/system level only. Verify with TCEQ.
