THE VIRGINIA DEPARTMENT OF ENERGY's award of $84,803,351 is 2.2x RAPPAHANNOCK ELECTRIC COOPERATIVE's $38,162,015 (80th percentile). RAPPAHANNOCK ELECTRIC COOPERATIVE is dated 2024-10-01; THE VIRGINIA DEPARTMENT OF ENERGY 2025-01-01.
Data as of · Compiled by Zalwin from USAspending.gov federal assistance awards (Assistance Listings 81.254, 81.255, 81.256)
Both records plus every comparable VA record, with all columns and source links · Card, Apple Pay, Google Pay or Link via Stripe
How does RAPPAHANNOCK ELECTRIC COOPERATIVE compare to THE VIRGINIA DEPARTMENT OF ENERGY?
| Field | RAPPAHANNOCK ELECTRIC COOPERATIVE | THE VIRGINIA DEPARTMENT OF ENERGY |
|---|---|---|
| Recipient | RAPPAHANNOCK ELECTRIC COOPERATIVE | THE VIRGINIA DEPARTMENT OF ENERGY |
| State | VA | VA |
| Program | Grid Infrastructure Deployment & Resilience (81.254) | Grid Infrastructure Deployment & Resilience (81.254) |
| Award | $38,162,015 | $84,803,351 |
| Period | 2024-10-01 to 2030-12-31 | 2025-01-01 to 2032-12-31 |
| Agency | Department of Energy / Department of Energy | Department of Energy / Department of Energy |
| Description | BIPARTISAN INFRASTRUCTURE LAW (BIL) - ENABLING ELECTRIC VEHICLE (EV) AND DISTRIBUTED ENERGY RESOURCES (DER) ADOPTION THROUGH DISTRIBUTED ENERGY RESOURCES MANAGEMENT SYSTEM (DERMS), ADVANCED METERING INFRASTRUCTURE (AMI), AND FIBER INTEGRATION THIS PROJECT WILL MODERNIZE THE RECIPIENT'S DISTRIBUTION SYSTEM TO REDUCE POWER CONSUMPTION, AVOID COSTLY SYSTEM UPGRADES, DRIVE RESILIENCY AND RELIABILITY, AND IMPROVE THE FLEXIBILITY OF THE GRID. SMART METERING DATA THROUGH ADVANCED METERING INFRASTRUCTURE (AMI) WILL BE LEVERAGED TO GAIN OPERATIONAL EFFICIENCIES, RELIABILITY IMPROVEMENTS, BETTER CONSU | BIPARTISAN INFRASTRUCTURE LAW (BIL) - DATA CENTER FLEXIBILITY AS A GRID ENHANCING TECHNOLOGY THE OBJECTIVES OF THIS AWARD WILL ADDRESS THREATS TO U.S. GRID RELIABILITY AND RESILIENCE CHALLENGES POSED BY RAPID GROWTH IN DATA CENTER ELECTRICITY LOADS AND HELP REDUCE DATA CENTER LOAD IMPACTS ON LOCAL AND REGIONAL GRIDS, THUS IMPROVING RELIABILITY AND RESILIENCE FOR BOTH DATA CENTERS AND GRID OPERATORS. THROUGH THE PROPOSED APPROACHES THE RECIPIENT WILL ALSO REDUCE AIR POLLUTION AND GREENHOUSE GAS EMISSIONS FROM BASELINE DATA CENTER POWER SUPPLY CONFIGURATIONS. |
| Award ID | DEGD0000914 | DEGD0000969 |
| award percentile | 55th | 80th |
| Funded Project Score | 50/100 | 65/100 |
| Peer rank and all 4 VA records (CSV) | 🔒 Click to unlock → | |
| Official source URLs for every peer record | 🔒 Click to unlock → | |
Official records: RAPPAHANNOCK ELECTRIC COOPERATIVE · THE VIRGINIA DEPARTMENT OF ENERGY
Get new doe grid resilience awards in your states
DoeGridGrantPulse emails new awards matching your states, programs and minimum amount.
Award data comes from USAspending.gov as reported by federal agencies and can lag or be revised; an award is not a procurement opportunity by itself. Organizations only; awards redacted for individual privacy are excluded. Informational only.