DoeGridGrantPulse / compare
ROANOKE CEMENT COMPANY LLC vs RAPPAHANNOCK ELECTRIC COOPERATIVE: DoeGridGrantPulse comparison
ROANOKE CEMENT COMPANY LLC's award of $61,700,000 is 1.6x RAPPAHANNOCK ELECTRIC COOPERATIVE's $38,162,015 (75th percentile). ROANOKE CEMENT COMPANY LLC is dated 2024-11-01; RAPPAHANNOCK ELECTRIC COOPERATIVE 2024-10-01.
Data as of · Compiled by Zalwin from USAspending.gov federal assistance awards (Assistance Listings 81.254, 81.255, 81.256)
Both records plus every comparable VA record, with all columns and source links · Card, Apple Pay, Google Pay or Link via Stripe
How does ROANOKE CEMENT COMPANY LLC compare to RAPPAHANNOCK ELECTRIC COOPERATIVE?
| Field | ROANOKE CEMENT COMPANY LLC | RAPPAHANNOCK ELECTRIC COOPERATIVE |
|---|---|---|
| Recipient | ROANOKE CEMENT COMPANY LLC | RAPPAHANNOCK ELECTRIC COOPERATIVE |
| State | VA | VA |
| Program | Grid Innovation & Resilience (81.255) | Grid Infrastructure Deployment & Resilience (81.254) |
| Award | $61,700,000 | $38,162,015 |
| Period | 2024-11-01 to 2031-03-30 | 2024-10-01 to 2030-12-31 |
| Agency | Department of Energy / Department of Energy | Department of Energy / Department of Energy |
| Description | THE ROANOKE CEMENT COMPANY, LLC. (RCC) PLANT PROJECT IN TROUTVILLE, VIRGINIA AIMS TO CONSTRUCT AND OPERATE A FIRST-OF-A- KIND IN THE UNITED STATES CALCINED CLAY PRODUCTION LINE FOR LIMESTONE CALCINED CLAY CEMENT (LC3) USING A FLASH CALCINER (OR EQUIVALENT TECHNOLOGY) AND MODERATE PURITY CLAY TO REPLACE A SIGNIFICANT PORTION OF CLINKER IN CEMENT. WITH LOWER OPERATING COSTS AND HIGHER MATERIAL PERFORMANCE, THIS PROJECT PLANS TO ENABLE ANNUAL PRODUCTION CAPACITY OF 300,000 SHORT TONS/YEAR OF CALCINED CLAY WITH AN ANTICIPATED CARBON INTENSITY THAT IS 83% LOWER COMPARED TO THE CLINKER IT REPLACES. | BIPARTISAN INFRASTRUCTURE LAW (BIL) - ENABLING ELECTRIC VEHICLE (EV) AND DISTRIBUTED ENERGY RESOURCES (DER) ADOPTION THROUGH DISTRIBUTED ENERGY RESOURCES MANAGEMENT SYSTEM (DERMS), ADVANCED METERING INFRASTRUCTURE (AMI), AND FIBER INTEGRATION THIS PROJECT WILL MODERNIZE THE RECIPIENT'S DISTRIBUTION SYSTEM TO REDUCE POWER CONSUMPTION, AVOID COSTLY SYSTEM UPGRADES, DRIVE RESILIENCY AND RELIABILITY, AND IMPROVE THE FLEXIBILITY OF THE GRID. SMART METERING DATA THROUGH ADVANCED METERING INFRASTRUCTURE (AMI) WILL BE LEVERAGED TO GAIN OPERATIONAL EFFICIENCIES, RELIABILITY IMPROVEMENTS, BETTER CONSU |
| Award ID | DECD0000088 | DEGD0000914 |
| award percentile | 75th | 55th |
| Funded Project Score | 50/100 | 50/100 |
| Peer rank and all 4 VA records (CSV) | 🔒 Click to unlock → | |
| Official source URLs for every peer record | 🔒 Click to unlock → | |
Official records: ROANOKE CEMENT COMPANY LLC · RAPPAHANNOCK ELECTRIC COOPERATIVE
Get new doe grid resilience awards in your states
DoeGridGrantPulse emails new awards matching your states, programs and minimum amount.
Award data comes from USAspending.gov as reported by federal agencies and can lag or be revised; an award is not a procurement opportunity by itself. Organizations only; awards redacted for individual privacy are excluded. Informational only.