TxSewageOverflowPulse / compare

Panther Creek Wastewater Treatment Plant vs Frisco West WCID Collection System: TxSewageOverflowPulse comparison

Frisco West WCID Collection System's gallons of 24,300 is 1.6x Panther Creek Wastewater Treatment Plant's 15,000 (92nd percentile). Panther Creek Wastewater Treatment Plant is dated 2026-05-07; Frisco West WCID Collection System 2026-07-27.

Data as of · Compiled by Zalwin from Texas Commission on Environmental Quality (TCEQ) Sanitary Sewer Overflows (data.texas.gov)

Both records plus every comparable record, with all columns and source links · Card, Apple Pay, Google Pay or Link via Stripe

How does Panther Creek Wastewater Treatment Plant compare to Frisco West WCID Collection System?

FieldPanther Creek Wastewater Treatment PlantFrisco West WCID Collection System
Utility / systemPanther Creek Wastewater Treatment PlantFrisco West WCID Collection System
System typeTreatment plant (WWTP)Collection system
TCEQ RNRN102739430RN111463576
PermitsSTORMWATER-PERMIT-TXR05X986; STORMWATER-PERMIT-TXR1519VD; WASTEWATER-PERMIT-WQ0014245001
Volume15,000 gallons24,300 gallons
CauseHUMAN ERRORHUMAN ERROR
SourceTexas Commission on Environmental Quality (TCEQ) Sanitary Sewer Overflows (data.texas.gov)Texas Commission on Environmental Quality (TCEQ) Sanitary Sewer Overflows (data.texas.gov)
CountyDentonDenton
TCEQ regionDfw MetroplexDfw Metroplex
Dates2026-05-072026-07-27
Reported2026-05-132026-07-29
Incident number458038463983
gallons percentile90th92nd
Score40/10040/100
Peer rank and all 500 records (CSV) 🔒 Click to unlock →
Official source URLs for every peer record 🔒 Click to unlock →

Official records: Panther Creek Wastewater Treatment Plant · Frisco West WCID Collection System

Get new overflows in your counties

TxSewageOverflowPulse emails new sewer overflows matching your counties, causes and minimum volume.

See plans

From TCEQ Sanitary Sewer Overflow reports, which TCEQ publishes in monthly batches (recent weeks may not appear yet). Volumes are as reported by the utility and are often estimates. Utility/system level only. Verify with TCEQ.

Often used together