LaBuildingSafetyBuildingLedger: Permitting & Work Filings
196 laBuildingSafetyBuildingLedger: Permitting & Work Filings are listed from City of Los Angeles Open Data (data.lacity.org, dataset dyxf-7hc4), dated 2012-01-20 to 2019-12-20; the most frequent is Add sill plate anchors bolts and cripple wall plywood per L.A. City Std. Plan #1; no foundation replacement (EQ hazard reduction per Chapter 92). with 39. Data last updated 2026-11-03; each record links to its official source and a full report.
Data as of · Compiled by Zalwin from City of Los Angeles Open Data (data.lacity.org, dataset dyxf-7hc4)
Includes: Organization, Classification, Status, City, Value, Date, official source URL and score · Card, Apple Pay, Google Pay or Link via Stripe
196 records from City of Los Angeles Open Data (data.lacity.org, dataset dyxf-7hc4), dated 2012-01-20 to 2019-12-20. Most frequent: Add sill plate anchors bolts and cripple wall plywood per L.A. City Std. Plan #1; no foundation replacement (EQ hazard reduction per Chapter 92). (39). Each record links to a full report and the official source.
Last updated 2026-11-03. Source: City of Los Angeles Open Data (data.lacity.org, dataset dyxf-7hc4).
Get new LaBuildingSafetyBuildingLedger records by email (free, weekly)
We email one confirmation link now; the weekly digest starts only after you confirm. One-click unsubscribe in every email.
Double opt-in: nothing is sent until you click the confirmation link. One-click unsubscribe.
- Add sill plate anchors bolts and cripple wall plywood per L.A. City Std. Plan #1; no foundation replacement (EQ hazard reduction per Chapter 92). (39)
- Hollywood Studio District (18)
- Community and Neighbors for Ninth District Unity (16)
- Foothill Trails District (16)
- Add sill plate anchor bolts and cripple wall plywood per L.A. City Std. Plan #1; no foundation replacement (EQ hazard reduction per Chapter 92). (9)
How do I get new laBuildingSafetyBuildingLedger: Permitting & Work Filings by email?
Search, filter and export these records, or get alerts when new ones appear.
What are the top laBuildingSafetyBuildingLedger: Permitting & Work Filings right now?
Browse 35 more matching record reports
- Add sill plate anchors bolts, cripple wall plywood and replace foundation per L.A. City Std. Plan #1(EQ hazard reduction per Chapter 92).
- Community and Neighbors for Ninth District Unity
- Add sill plate anchors bolts and cripple wall plywood per L.A. City Std. Plan #1; no foundation replacement (EQ hazard reduction per Chapter 92).
- NEW 5' (H) X 44'3" (L) X 8" CONCRETE RETAINING WALL PER ENGINEERING. Comply with department ordert 11/26/2018, permit will expire 30 days from issuance date
- REPLASTER & RE-PIPE SWIMMING POOL. Comply with department order effective date 4/30/2019, permit will expire 3 days from issuance date.
- Supplemental to permit # 19016-20000-06935, To revise foundation and increase valuation from $17,500 to$24,000.
- Community and Neighbors for Ninth District Unity
- VOLUNTARY FOUNDATION REPLACEMENT PER LADBS STD. PLAN AND PIER AND POST PER ENG. DETAILS.
- supplemental to pcis # 17016-30000-35952 to revise foundation & interior walls and change engineer of record
- VOLUNTARY FOUNDATION UPGRADE PER LA CITY STANDARD PLAN AND ENGINEERING DETAILS
- Foothill Trails District
- SUPPLEMENTAL permit to 17010-10000-00116 TO REVISE FOUNDATION SYSTEM to caissons.
- Supplemental Permit to 16014-10000-03758 to revise foundation plan to provide pile foundation and grade beam due to field soil condition.
- Community and Neighbors for Ninth District Unity
- SUPPLEMENTAL PERMIT FOR 17014-20000-01133 TO REVISE FOUNDATION PLAN TO ADD PILES & GRADE BEAMS PER ENG'R DESIGN
- Foothill Trails District
- Hollywood Studio District
- VOLUNTARY SEISMIC FOUNDATION RETROFIT PER ENGINEERED DETAILS.
- REPAIR EXISTING DECK AND ADD NEW STAIRS. COMPLY WITH DEPARTMENT ORDER effective date 04/29/2016. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE".
- Foothill Trails District
- Foothill Trails District
- Community and Neighbors for Ninth District Unity
- Community and Neighbors for Ninth District Unity
- Foothill Trails District
- New 2 concrete foundation /caisson for 100 ft high light pole
- INTERIOR REMODEL TO (E) SFD, APPROX. 130 SQFT."Comply with department order effective date 10/09/2015. Permit will expire 30 days from issuance date."
- Voluntary retrofit to anchor bolt foundation for the existing 1-story apartment per city standard plan
- Community and Neighbors for Ninth District Unity
- Hollywood Studio District
- Add sill plate anchors bolts, cripple wall plywood and replace foundation per L.A. City Std. Plan #1(EQ hazard reduction per Chapter 92).
- Foothill Trails District
- ENCLOSE (E) PORCH IN (E) SFD "COMPLY WITH DEPARTMENT ORDER effective date 8/22/2008. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE"
- Foothill Trails District
- Add sill plate anchors bolts, cripple wall plywood and replace foundation per L.A. City Std. Plan #1(EQ hazard reduction per Chapter 92).
- VOLUNTARY UPGRADE (E) FOUNDATION PER LADBS STD PLAN #1, Detail #9.
Which related categories and locations should I check?
Browse by filing category
General Commercial Filings (51)
Browse by filing status
Browse by jurisdiction
Browse by minimum reported value
Frequently asked questions
How many laBuildingSafetyBuildingLedger: Permitting & Work Filings are listed?
196 records from City of Los Angeles Open Data (data.lacity.org, dataset dyxf-7hc4), last refreshed automatically. The most recent is dated 2019-12-20.
Can I get alerts for Permitting & Work Filings?
Yes. LaBuildingSafetyBuildingLedger can email you new records matching this filter; plans are listed on the LaBuildingSafetyBuildingLedger page.
Source: City of Los Angeles Open Data (data.lacity.org, dataset dyxf-7hc4). Informational only. RSS feed of new records