LaBuildingSafetyBuildingPulse: $50,000+
18 laBuildingSafetyBuildingPulse: $50,000+ are listed from City of Los Angeles Open Data (data.lacity.org, dataset gwh9-jnip), dated 2021-10-21 to 2026-10-24; the most frequent is PC Info Complete with 7. Data last updated 2026-11-03; each record links to its official source and a full report.
Data as of · Compiled by Zalwin from City of Los Angeles Open Data (data.lacity.org, dataset gwh9-jnip)
Includes: Organization, Classification, Status, City, Value, Date, official source URL and score · Card, Apple Pay, Google Pay or Link via Stripe
18 records from City of Los Angeles Open Data (data.lacity.org, dataset gwh9-jnip), dated 2021-10-21 to 2026-10-24. Most frequent: PC Info Complete (7). Each record links to a full report and the official source.
Last updated 2026-11-03. Source: City of Los Angeles Open Data (data.lacity.org, dataset gwh9-jnip).
Get new LaBuildingSafetyBuildingPulse records by email (free, weekly)
We email one confirmation link now; the weekly digest starts only after you confirm. One-click unsubscribe in every email.
Double opt-in: nothing is sent until you click the confirmation link. One-click unsubscribe.
- PC Info Complete (7)
- PC Approved (3)
- PC in Progress (1)
- Front facade repairs of an (E) Commercial Bldg due to a vehicle collision. Storefront was damaged and unsafe since front facade caused damage to entrance."COMPLY WITH DEPARTMENT ORDER effective date 10/27/2025. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". (1)
- eplan ** TREE IMPACT DAMAGE REPAIR: DAMAGE OCCURRED @ THE RESIDENCE ROOF FRAMING & ATTIC. A PORTION OF THE ROOF FRAMING WAS DAMAGED BY TREE IMPACT.REPAIR WORK WILL INCLUDE THE FOLLOWING:REPAIR/REPLACEMENT ROOF FRAMING OVER THE RESIDENCE AS REQUIRED.REPLACEMENT OF EXTERIOR SIDING AND STUCCO PLASTER AS REQUIRED TO MATCH (E).REPLACEMENT OF ROOFING.REPLACEMENT OF INTERIOR WALL & CEILING FINISHES, AS REQUIRED.REPLACEMENT OF DAMAGED DOORS & WINDOWS, AS REQUIRED.REPLACEMENT OF INSULATION.REPLACEMENT OF FIXTURES, AS REQUIRED.NO UPGRADES OF EITHER THE FOUNDATION SYSTEM OR THE EXISTING LATERAL FORCE RESISTING SYSTEM ARE ANTICIPATED AS PART OF THIS PROJECT. REPAIR WORK TO EXISTING SHEAR WALLS WILL BE OF LIKE KIND AND QUALITY.NO CHANGES TO THE EXISTING LATERAL FORCE RESISTING SYSTEM ARE ANTICIPATED.NO ADDITIONS OR ALTERATIONS ARE A PART OF THIS PROJECT. (1)
How do I get new laBuildingSafetyBuildingPulse: $50,000+ by email?
Search, filter and export these records, or get alerts when new ones appear.
What are the top laBuildingSafetyBuildingPulse: $50,000+ right now?
Browse 3 more matching record reports
Browse all LaBuildingSafetyBuildingPulse record reports
Which related categories and locations should I check?
Browse by filing category
General Commercial Filings (425) Permitting & Work Filings (15)
Browse by filing status
Browse by jurisdiction
Browse by minimum reported value
Frequently asked questions
How many laBuildingSafetyBuildingPulse: $50,000+ are listed?
18 records from City of Los Angeles Open Data (data.lacity.org, dataset gwh9-jnip), last refreshed automatically. The most recent is dated 2026-10-24.
Can I get alerts for $50,000+?
Yes. LaBuildingSafetyBuildingPulse can email you new records matching this filter; plans are listed on the LaBuildingSafetyBuildingPulse page.
Source: City of Los Angeles Open Data (data.lacity.org, dataset gwh9-jnip). Informational only. RSS feed of new records