LaBuildingSafetyBuildingTracker: Permitting & Work Filings
123 laBuildingSafetyBuildingTracker: Permitting & Work Filings are listed from City of Los Angeles Open Data (data.lacity.org, dataset e67z-kt2n); the most frequent is Add sill plate anchor bolts and cripple wall plywood per L.A. City Std. Plan #1; no foundation replacement (EQ hazard reduction per Chapter 92). with 12. Data last updated 2026-11-03; each record links to its official source and a full report.
Data as of · Compiled by Zalwin from City of Los Angeles Open Data (data.lacity.org, dataset e67z-kt2n)
Includes: Organization, Classification, Status, City, Value, Date, official source URL and score · Card, Apple Pay, Google Pay or Link via Stripe
123 records from City of Los Angeles Open Data (data.lacity.org, dataset e67z-kt2n). Most frequent: Add sill plate anchor bolts and cripple wall plywood per L.A. City Std. Plan #1; no foundation replacement (EQ hazard reduction per Chapter 92). (12). Each record links to a full report and the official source.
Last updated 2026-11-03. Source: City of Los Angeles Open Data (data.lacity.org, dataset e67z-kt2n).
Get new LaBuildingSafetyBuildingTracker records by email (free, weekly)
We email one confirmation link now; the weekly digest starts only after you confirm. One-click unsubscribe in every email.
Double opt-in: nothing is sent until you click the confirmation link. One-click unsubscribe.
- Add sill plate anchor bolts and cripple wall plywood per L.A. City Std. Plan #1; no foundation replacement (EQ hazard reduction per Chapter 92). (12)
- Foothill Trails District (7)
- Bank (4)
- Hollywood Studio District (4)
- Anchor bolting/bracing foundation per L.A. City standard plan. (4)
How do I get new laBuildingSafetyBuildingTracker: Permitting & Work Filings by email?
Search, filter and export these records, or get alerts when new ones appear.
What are the top laBuildingSafetyBuildingTracker: Permitting & Work Filings right now?
Browse 35 more matching record reports
- EARTHQUAKE RETROFIT AND FOUNDATION REINFORCEMENT IN GARAGE.
- Add sill plate anchor bolts, cripple wall plywood and replace foundation per L.A. City Std. Plan #1 (EQ hazard reduction per Chapter 92).
- Foundation repair : under-pin (E) pad footing per engineer's recommendations.
- VOLUNTARY FOUNDATION SUPPORT - ADD LENS GROUT TO AREAS OF WATER LEAK UNDER THE FOUNDATON TO FILL VOID AREAS PER SOIL ENGR'S RECOMMENDATION.
- REVISION TO FOUNDATION PLAN PER ENGINEER DESIGN FOR PROPOSED ADDITION UNDER 05014-10000-03240.
- Anchor bolting/bracing foundation per L.A. City standard plan.
- VOLUNTARY FOUNDATION REMEDIAL WORK; UNDERPINNING (E) KITCHEN EAST EXTERIOR WALL PER SOIL REPORT RECOMMENDATIONS (APPROXIMATELY 32' LONG)
- VOLUNTARY CRIPPLE WALL SEISMIC RETROFIT PER LA CITY STD. PLAN #1. REPLACE EXTERIOR FOOTING FOUNDATION; INSTALL ANCHORS; SHEATH CRIPPLE WALLS.
- INSTALL NEW FOUNDATION AND CRIPPLE WALL PARALLEL TO AND INSIDE EXISTING FOUNDATION.
- FOUNDATION REPAIR PER ENG. DETAILS ALONG THE SOUTH SIDE OF THE BUILDING.
- REPLACE EXISTING FOUNDATION WITH NEW FOOTING AND RETAINING WALL (6'-0" MAX.) AT EAST AND SOUTH OF THE BUILDING DUE TO POOR GRADE & TERMITES.
- VOLUNTARY UPGRADE (E)12'6" x 30' EXTERIOR FOUNDATION PAD FOR (E) NITROGEN TANK.
- COMPLY WITH DEPARTMENT ORDER DATED 4/17/2001. PERMIT TO EXPIRE 30-DAYS FROMISSUANCE DATE. (ALL WORK SHALL BE NON-STRUCTURAL)
- Foothill Trails District
- REPLACE 28' LF. OF (E) FOUNDATION IN THE SFD AS PER CITY OF L.A STANDARD PLAN #1.
- VOLUNTARY INSTALL NEW INTERIOR SISTER FOUNDATION TO REINFORCE EXISTING BRICK FOUNDATION, ENGINEERED.
- Replace foundation per type V sheet, stucco over cripple walls.
- Hospital
- VOLUNTARY FOUNDATION REPAIR UNDERPIN 33' AT REAR OF EXISTING SFD
- College
- REPAIR & REPLACE AS NEEDED FOUNDATION. PER TYPE 5. RESTUCCO HOUSE & GARAGE.
- REDO FOUNDATION & ROOF AS PER TYPE 5.
- SOUNDPROOFING AT LAX. Comply with department order effective date 8/7/07. Permit will expire 30 days from issuance date.
- REPLACE PORTION OF EXISTING URM FOUNDATION (VOLUNTARY) AT CORNERS. ADD PLYWOOD TO CRIPPLE WALLS THRU-OUT. GPI WAIVED BY JOHNNY KAZARIAN ON 9/18/01
- Rebuild 6" block wall on existing foundation per engineer
- CONVERT (E) SFD WITH BASEMENT TO 3 UNIT APARTMENT. COMPLY WITH DEPARTMENT ORDER DATED 9/28/06. THIS PERMIT WILL EXPIRE IN 30 DAYS FROM ISSUANCE DATE.
- REVISE FOUNDATION PLAN. TO S.O.G.
- VOLUNTARY FOUNDATION BOLTING & CRIPPLE WALL BRACING. CRIPPLE WALLS EXCEED 4'-0" (NO ENGINEERING) NOT CONSIDERED A SEISMIC UPGRADE.
- VOLUNTARY FOUNDATION BOLTING, CRIPPLE WALL BRACING PER LA STANDARD PLAN.(EARTHQUAKE HAZARD REDUCTION PER CHAPTER 92)
- Bank
- FOUNDATION REPAIR PER L.A. STANDARD PLANS VALUATION TO BE VERIFIED BY FIELD INSPECTOR
- Foundation Only
- TO ALLOW CONSTRUCTION TO CONTINUE BEYOND FOUNDATION WORK AND TO CAPTURE REQUIRED CLEARANCES FROM OTHER CITY DEPARTMENTS
- Add sill plate anchor bolts and cripple wall plywood per L.A. City Std. Plan #1; no foundation replacement (EQ hazard reduction per Chapter 92).
- Voluntary foundation repair, underpin conti. footing with 3'6" square pad footings at two locations.
Which related categories and locations should I check?
Browse by filing category
General Commercial Filings (64)
Browse by filing status
Browse by jurisdiction
Browse by minimum reported value
Frequently asked questions
How many laBuildingSafetyBuildingTracker: Permitting & Work Filings are listed?
123 records from City of Los Angeles Open Data (data.lacity.org, dataset e67z-kt2n), last refreshed automatically.
Can I get alerts for Permitting & Work Filings?
Yes. LaBuildingSafetyBuildingTracker can email you new records matching this filter; plans are listed on the LaBuildingSafetyBuildingTracker page.
Source: City of Los Angeles Open Data (data.lacity.org, dataset e67z-kt2n). Informational only. RSS feed of new records