Revision Energy: solar PV installation (11.88 kW with battery storage) at Gray Gdns E, Cambridge MA (issued 2026-10-06)

Revision Energy: solar PV installation (11.88 kW with battery storage) at Gray Gdns E, Cambridge MA (issued 2026-10-06). Its demolition or solar project cost of 68,238 is above the median of 45,000 (62nd percentile). Dated 30 days ago, it is in the active follow-up window. Score 60/100. As of 2026-11-04, from City of Cambridge sprinkler and standpipe, crane / boom / pump truck, excavation, demolition and solar installation permits (data.cambridgema.gov).

Data as of · Compiled by Zalwin from City of Cambridge sprinkler and standpipe, crane / boom / pump truck, excavation, demolition and solar installation permits (data.cambridgema.gov)

demolition or solar project cost: 68,238 · 62th percentile of 68 CambridgeContractorPermitPulse records · 1.5x the median

Free preview: all 9 published fields of this record are shown below. Locked: 499 related CambridgeContractorPermitPulse records and the 5-column CSV export.

FieldValue
CompanyRevision Energy
PermitSolar PV and storage installation
LocationGray Gdns E, Cambridge, MA
Issued2026-10-06
StatusActive
BuildingOne or Two Family Dwelling
Solar system11.88 kW, 27 panels, with battery storage
InverterENPHASE IQ8MC-72-M-US
Solar project cost$68,238
demolition or solar project cost percentile62th of 68 (median 45,000, 1.5x median)
Peer records CSV (500 records) 🔒 Click to unlock →
CRM-ready export with official source URLs 🔒 Click to unlock →

View the official record

Markdown version

Watch Revision Energy

Free email alert. Alert me when this company gets a new filing, lien, permit, contract or expiry in this feed. One confirmation email; unsubscribe any time.

Free for 1 company. More companies from $9/mo (25), $49/mo (500 + CSV), $199/mo (500 + CSV + API). Cancel any time from the link in every email.

Unlock Revision Energy + 500 peer records (CSV)

Instant CSV download · Card, Apple Pay, Google Pay or Link via Stripe · No account required
CSV columns: Company · Permit · Location · Issued · Status · official source URL

  • Source agency: City of Cambridge sprinkler and standpipe, crane / boom / pump truck, excavation, demolition and solar installation permits (data.cambridgema.gov)
  • Record date: 2026-10-06
  • Data refreshed: 2026-11-04
  • Refunds on request within 14 days

Search all records free →

Top CambridgeContractorPermitPulse records (Cambridge, MA first): The Boston Solar Company, LLC · 621 Energy LLC · The Boston Solar Company, LLC · Dellbrook Construction LLC · Solect Energy · Browse all by state and category →

LIVE PUBLIC DATA Source: City of Cambridge sprinkler and standpipe, crane / boom / pump truck, excavation, demolition and solar installation permits (data.cambridgema.gov) · Last refreshed: Wed, 04 Nov 2026 06:09:18 GMT

Is this your business? Add a "Listed on Zalwin" badge to your site

Paste this snippet into your website. It links to this public record; nothing is tracked on your site.

Listed on Zalwin badge preview

Peer benchmark and outreach value: Revision Energy and 882 Cambridge, MA peers

  • Cambridge, MA CambridgeContractorPermitPulse records like this one: 882
  • Revision Energy's demolition or solar project cost: 62nd percentile of 68 records
  • Timing: Medium: dated in the last 30 days
  • Estimated pipeline if you contact every Cambridge, MA peer: $176,400 (peers × rate × deal size; an estimate from your assumptions, not a forecast)

Search, filter and export more CambridgeContractorPermitPulse records

Run instant live search with these filters Download free sample CSV

✓ Read-only, live public data · Key and unlock right after payment · Card, Apple Pay, Google Pay or Link via Stripe · Refunds on request within 14 days

60 / 100 Score

  • Permit active: work underway or about to start.
  • Commercial-size solar or battery storage.

What is the CambridgeContractorPermitPulse record for Revision Energy?

Revision Energy was issued a City of Cambridge solar pv and storage installation permit on 2026-10-06 for work at Gray Gdns E; status: Active.

How does Revision Energy compare to other CambridgeContractorPermitPulse records?

Its demolition or solar project cost of 68,238 sits in the upper half (62th percentile) of 68 records; the median is 45,000. It is 30 days old, still within a typical 45-day follow-up window.

Revision Energy vs. top 3 peers

OrganizationLocationAmountPercentileRecord date
Revision EnergyCambridge, MA68,23862nd2026-10-06
Sunrun Installation ServicesCambridge, MA70,80065th2026-09-03
Trinity Solar, LLCCambridge, MA83,919.2469th2026-10-27
Second Generation Energy LLCCambridge, MA43,70049th2026-10-05

Related records

CambridgeContractorPermitPulse: Solar PV and storage installation CambridgeContractorPermitPulse: Active

How to monitor Revision Energy and peer solar pv and storage installation records

Get new CambridgeContractorPermitPulse records like Revision Energy by email (free, weekly)

We email one confirmation link now; the weekly digest starts only after you confirm. One-click unsubscribe in every email.

Double opt-in: nothing is sent until you click the confirmation link. One-click unsubscribe.

See this week's digest

Get new Cambridge contractor permits

CambridgeContractorPermitPulse emails new Cambridge sprinkler, crane, excavation, demolition and solar permits matching your permit types.

See plans

✓ Read-only, live public data · Key and unlock right after payment · Card, Apple Pay, Google Pay or Link via Stripe · Refunds on request within 14 days

From City of Cambridge permit data on data.cambridgema.gov. Details are as entered on each application. Permits pulled under a person's name are excluded, personal names (applicants, agents) and owner-occupancy are never shown, and homes are shown by street only; solar system size and cost are as the installer entered them. Verify with the City of Cambridge.

Often used together