Temporary generator power and electrical distribution for concert event at Lesley college on April 27th.: Electrical (, MA) — Complete

Temporary generator power and electrical distribution for concert event at Lesley college on April 27th. (Massachusetts): Electrical (, MA) — Complete. Dated 2753 days ago, it serves as a historical benchmark. Score 35/100. As of 2026-11-04, from City of Cambridge Open Data (data.cambridgema.gov, dataset hvtc-3ab9).

Data as of · Compiled by Zalwin from City of Cambridge Open Data (data.cambridgema.gov, dataset hvtc-3ab9)

Free preview: all 7 published fields of this record are shown below. Locked: 230 related MA CambridgeElectricalPermitsPulse records and the 6-column CSV export.

FieldValue
OrganizationTemporary generator power and electrical distribution for concert event at Lesley college on April 27th.
ClassificationElectrical
StatusComplete
LocationMA
Reported valueNot stated
Filing date2019-04-23
Reference ID45058
Peer records CSV (231 MA records) 🔒 Click to unlock →
CRM-ready export with official source URLs 🔒 Click to unlock →

View the official record

Markdown version

Watch Temporary generator power and electrical distribution for concert event at Lesley college on April 27th.

Free email alert. Alert me when this company gets a new filing, lien, permit, contract or expiry in this feed. One confirmation email; unsubscribe any time.

Free for 1 company. More companies from $9/mo (25), $49/mo (500 + CSV), $199/mo (500 + CSV + API). Cancel any time from the link in every email.

Free first: a 10-record sample of MA records

See the real columns before you buy. One confirmation email, nothing else unless you opt in.

Unlock Temporary generator power and electrical distribution for concert event at Lesley college on April 27th. + all 231 MA records (CSV)

Instant CSV download · Card, Apple Pay, Google Pay or Link via Stripe · No account required
CSV columns: Organization · Classification · Status · City · Value · Date · official source URL

  • Source agency: City of Cambridge Open Data (data.cambridgema.gov, dataset hvtc-3ab9)
  • Record date: 2019-04-23
  • Data refreshed: 2026-11-04
  • Refunds on request within 14 days

Search all MA records free →

Browse CambridgeElectricalPermitsPulse by state and category →

LIVE PUBLIC DATA Source: City of Cambridge Open Data (data.cambridgema.gov, dataset hvtc-3ab9) · Last refreshed: Wed, 04 Nov 2026 21:57:21 GMT

Is this your business? Add a "Listed on Zalwin" badge to your site

Paste this snippet into your website. It links to this public record; nothing is tracked on your site.

Listed on Zalwin badge preview

Peer benchmark and outreach value: Temporary generator power and electrical distribution for concert event at Lesley college on April 27th. and 231 Massachusetts peers

  • Massachusetts CambridgeElectricalPermitsPulse records like this one: 231
  • Timing: Low: older than 30 days
  • Estimated pipeline if you contact every Massachusetts peer: $46,200 (peers × rate × deal size; an estimate from your assumptions, not a forecast)

Search, filter and export more CambridgeElectricalPermitsPulse records

Run instant live search with these filters Download free sample CSV

✓ Read-only, live public data · Key and unlock right after payment · Card, Apple Pay, Google Pay or Link via Stripe · Refunds on request within 14 days

35 / 100 Score

  • Verified City of Cambridge public registry record.

What is the CambridgeElectricalPermitsPulse record for Temporary generator power and electrical distribution for concert event at Lesley college on April 27th. in Massachusetts?

Temporary generator power and electrical distribution for concert event at Lesley college on April 27th. recorded a electrical filing (Complete) in MA on 2019-04-23.

How does Temporary generator power and electrical distribution for concert event at Lesley college on April 27th. compare to other Massachusetts CambridgeElectricalPermitsPulse records?

It is 2753 days old; check the official source for later updates before acting. Its Score of 35/100 is modest; treat it as background rather than a priority.

Temporary generator power and electrical distribution for concert event at Lesley college on April 27th. vs. top 3 peers

OrganizationLocationRecord date
Temporary generator power and electrical distribution for concert event at Lesley college on April 27th.MA2019-04-23
Ganley Electric LLCCambridge, MA2026-10-23
ALDON ELECTRIC INC.Cambridge, MA2026-03-05
Repair service due to tree company truck hitting meter socketCambridge, MA2025-11-14

Related records

CambridgeElectricalPermitsPulse: Permitting & Work Filings CambridgeElectricalPermitsPulse: Completed / Closed CambridgeElectricalPermitsPulse: City of Cambridge

More Massachusetts public-record feeds

Newly CLIA-Certified Laboratories by State & Certificate in Massachusetts Newly Posted IRS Automatic Revocations of Tax Exemption in Massachusetts SEC 8-K Corporate Trigger Events in Massachusetts HIPAA Breach Reports (500+ Individuals) by State & Type in Massachusetts Nonprofit Revenue, Expenses & Assets from Form 990 in Massachusetts Newly Licensed Child Care Centers & After-School Programs (TX, NY, PA, WA, MA) in Massachusetts FMCSA Trucking Insurance Cancellations by Carrier, Insurer & Fleet Size in Massachusetts New NIH Research Awards by Organization in Massachusetts

How to monitor Temporary generator power and electrical distribution for concert event at Lesley college on April 27th. and peer permitting & work filings records

Get new CambridgeElectricalPermitsPulse records like Temporary generator power and electrical distribution for concert event at Lesley college on April 27th. by email (free, weekly)

We email one confirmation link now; the weekly digest starts only after you confirm. One-click unsubscribe in every email.

Double opt-in: nothing is sent until you click the confirmation link. One-click unsubscribe.

See this week's digest

Get City of Cambridge commercial filing alerts

CambridgeElectricalPermitsPulse emails new commercial filings from City of Cambridge matching your category and value filters.

See plans

✓ Read-only, live public data · Key and unlock right after payment · Card, Apple Pay, Google Pay or Link via Stripe · Refunds on request within 14 days

Public record data from City of Cambridge Open Data (data.cambridgema.gov, dataset hvtc-3ab9). Filtered to commercial organizations; individual consumer and residential records are excluded. A public filing or inspection record is not a finding of fault and does not establish legal liability. Verify directly with City of Cambridge before acting.

Often used together