CambridgeContractorPermitPulse / compare

Trinity Solar LLC vs Revision Energy: CambridgeContractorPermitPulse comparison

Revision Energy's demolition or solar project cost of 68,238 is 1.0x Trinity Solar LLC's 66,000 (62nd percentile). Trinity Solar LLC is dated 2026-06-09; Revision Energy 2026-10-06.

Data as of · Compiled by Zalwin from City of Cambridge sprinkler and standpipe, crane / boom / pump truck, excavation, demolition and solar installation permits (data.cambridgema.gov)

Both records plus every comparable record, with all columns and source links · Card, Apple Pay, Google Pay or Link via Stripe

How does Trinity Solar LLC compare to Revision Energy?

FieldTrinity Solar LLCRevision Energy
CompanyTrinity Solar LLCRevision Energy
PermitSolar PV and storage installationSolar PV and storage installation
LocationBlanchard Rd, Cambridge, MAGray Gdns E, Cambridge, MA
Issued2026-06-092026-10-06
StatusActiveActive
BuildingOne or Two Family DwellingOne or Two Family Dwelling
Solar system15.99 kW, 39 panels11.88 kW, 27 panels, with battery storage
InverterUSE11400H-USSKBEZ8 (10000W)ENPHASE IQ8MC-72-M-US
Solar project cost$66,000$68,238
demolition or solar project cost percentile60th62nd
Score45/10060/100
Peer rank and all 500 records (CSV) 🔒 Click to unlock →
Official source URLs for every peer record 🔒 Click to unlock →

Official records: Trinity Solar LLC · Revision Energy

Get new Cambridge contractor permits

CambridgeContractorPermitPulse emails new Cambridge sprinkler, crane, excavation, demolition and solar permits matching your permit types.

See plans

From City of Cambridge permit data on data.cambridgema.gov. Details are as entered on each application. Permits pulled under a person's name are excluded, personal names (applicants, agents) and owner-occupancy are never shown, and homes are shown by street only; solar system size and cost are as the installer entered them. Verify with the City of Cambridge.

Often used together