Every WaPublicWorksIntentPulse record report, 200 per page, grouped by state. Records 1 to 200: A T S Automation Inc: prime, $1,054,536 on "GHC B4000 HVAC Upgrade" for Wash State Dept of Enterprise Services, Aberdeen to Daktronics Inc: sub to Skanska USA Building Inc, $182,375 on "Pacific MS Replacement Project" for Highline School District, Des Moines. Source: Washington State Department of Labor & Industries prevailing wage Statements of Intent (data.wa.gov).
ABERDEEN
- A T S Automation Inc: prime, $1,054,536 on "GHC B4000 HVAC Upgrade" for Wash State Dept of Enterprise Services, Aberdeen
- Datskiy Electric LLC: sub to A T S Automation Inc, $41,000 on "GHC B4000 HVAC Upgrade" for Wash State Dept of Enterprise Services, Aberdeen
- Puget Sound Controls LLC: sub to Ameresco Inc, $117,399 on "City of Aberdeen" for City of Aberdeen, Aberdeen
- Securitas Technology Corp: prime, $48,924 on "Aberdeen Timerland Library Fire Upgrade and Services" for City of Aberdeen, Aberdeen
- Shaw Integrated & Turf Sol Inc: prime, $130,050 on "Aberdeen Pioneer Park Field 3" for City of Aberdeen, Aberdeen
AHTANUM
AIRWAY HEIGHTS
- Diamond Asphalt Paving Inc: sub to T Bailey LLC, $48,154 on "Reclaimed Water Extension & Reservoir" for City of Airway Heights, Airway Heights
- Metals Fabrication Co, Inc: sub to Bnbuilders Inc, $583,000 on "SRFR Fire Station 32" for Snohomish Regional Fire & Rescue, Airway Heights
- Metals Fabrication Co, Inc: sub to Bnbuilders Inc, $976,000 on "SRFR Fire Station 81" for Snohomish Regional Fire & Rescue, Airway Heights
- Midland Electric Inc: sub to T Bailey LLC, $138,198 on "Reclaimed Water Extension & Reservoir" for City of Airway Heights, Airway Heights
- Smith Electric & Controls LLC: sub to Divco Incorporation, $125,000 on "Craig Road Elementary School" for Cheney School District #360, Airway Heights
ALGONA
ALLYN
- Roof Doctor Inc the: prime, $43,929 on "Rustlewood Well House Roof Repairs" for Mason County Public Utility District #3, Allyn
- Roof Doctor Inc the: prime, $55,515 on "NBCI Buildings (3) Roof Repairs" for Mason County Public Works, Allyn
ANACORTES
- Asphalt Northwest LLC: sub to Raw Land Construction LLC, $109,272 on "2026 Doon Way Waterline Replacements" for City of Anacortes, Anacortes
- Valley Concrete Solutions LLC: sub to Strider Construction Co Inc, $41,076 on "Combined Sewer Overflow Pump Station" for City of Anacortes, Anacortes
ANDERSON ISLAND
ARLINGTON
- Anderson Dirtworx LLC: prime, $87,450 on "Veach Rd Rx" for Stillaguamish Tribe Natural Resources, Arlington
- Eagle Asphalt Sealctng Co LLC: sub to Kirtley-Cole Associates LLC, $190,300 on "Skagit Regional Health-Medical Office Building" for Skagit County Public Hospital District #1, Arlington
- North Sky Communications LLC: prime, $61,113 on "Hwy 530 - Arlington H1005 Terminal (6028420)" for Ziply Fiber, Arlington
- NW Prof Res/Comm Const Inc: sub to Ameresco Inc, $183,356 on "Arlington Energy Storage" for Snohomish County Public Utility District #1, Arlington
ASHFORD
AUBURN
- Alpha Edge Construction LLC: prime, $142,342 on "Golf Course Clubhouse Basement Buildout" for City of Auburn, Auburn
- Burton Construction Inc: prime, $282,149 on "GRC - Holman Library Passenger Elevator" for Wash State Dept of Enterprise Services, Auburn
- Code Mechanical Inc: sub to Dalton Electric Corp, $58,428 on "CP2403, Well 4 Electrical Improvements" for City of Auburn, Auburn
- Equipment Sales Co Inc: prime, $81,428 on "M&O Shop Build" for City of Auburn, Auburn
- Foley Sign Co: sub to Todd Robinson Painting Inc, $62,060 on "Auburn Station Parking & Access Improvement" for Sound Transit, Auburn
- Guardian Security Systems Inc: sub to General Mechanical Inc, $57,780 on "AIRPORT T-HANGAR UPGRADES" for City of Auburn, Auburn
- Hanson Tree Service LLC: prime, $90,000 on "On-Call Tree Services" for City of Auburn, Auburn
- Joseph J Jefferson/Son Inc: sub to Marpac Construction LLC, $48,880 on "Auburn Theater & Park" for City of Auburn, Auburn
- Mckinstry Co LLC: prime, $119,455 on "FWSD Lakeland Elementary School-Prevailing Wage" for Federal Way School District, Auburn
- Mckinstry Co LLC: sub to Mckinstry Essention LLC, $184,432 on "GRC Science Bldg. Lighting and Boilers Ph. 1" for Wash State Dept of Enterprise Services, Auburn
- Mill Plain Electric Inc: prime, $191,294 on "Auburn, WA EV" for King County Administration Bldg, Auburn
- Puget Paving & Const Inc: sub to T Bailey LLC, $231,110 on "1400 Reservoir" for Lake Meridian Water District, Auburn
- Quality Fence Builders Inc: sub to Forma Construction Company, $110,580 on "Auburn Warehouse Fencing" for Sound Transit, Auburn
- Stanley Patrick Striping Co: sub to Colvos Construction LLC, $40,918 on "Muckleshoot Housing Authority Permanent Supportive Housing" for Muckleshoot Housing Authority, Auburn
BAINBRIDGE ISLAND
- Apollo Solutions Group: prime, $263,147 on "BAINBRIDGE ISLAND SCHOOL DISTRICT PH-II FP295" for Bainbridge Island School District, Bainbridge Island
- Dc Surveying, LLC: sub to High Country Contractors Inc, $54,600 on "Finch Green" for Commerce, Wa. State Department of (Formerly Cted), Bainbridge Island
- Kimco Plumbing Inc: sub to High Country Contractors Inc, $367,578 on "Finch Green" for Commerce, Wa. State Department of (Formerly Cted), Bainbridge Island
- Pacific Partners Insltn N: sub to Trico Companies LLC, $118,060 on "SR 305, Eagle Harbor Maintenance Facility Welding Shop Building Replacement - XE3625" for Wash State Dept of Transportation, Bainbridge Island
BATTLE GROUND
- Clima-Tech Corporation: sub to Copper Mechanical LLC, $47,967 on "Battle Ground Public Schools Construction Trades Building" for Battle Ground Public Schools, Battle Ground
- Construction Ahead Inc: sub to Western United Civil Grp LLC, $45,150 on "2026 Street Preservation Program - Reconstruction A" for City of Battle Ground, Battle Ground
- First Imprssns Cncrt Const LLC: sub to Union Corner Construction Inc, $132,444 on "Battle Ground Public Schools Construction Trades Building" for Battle Ground Public Schools, Battle Ground
- Grade Werks Excavating LLC: prime, $133,000 on "SW 20th Ave Force Main" for City of Battle Ground, Battle Ground
- Infinite Build LLC: sub to Union Corner Construction Inc, $70,000 on "Battle Ground Public Schools Construction Trades Building" for Battle Ground Public Schools, Battle Ground
- Lindberg Electrical LLC: sub to Union Corner Construction Inc, $96,200 on "Battle Ground Public Schools Futures Building Site Work" for Battle Ground Public Schools, Battle Ground
- Sunbridge Solar LLC: prime, $82,068 on "BESS Conversion" for Battle Ground Healtthcare, Battle Ground
- Vertex Contracting LLC: prime, $54,123 on "2026 Sidewalk Trip Hazard Removal - Phase II" for City of Battle Ground, Battle Ground
BEAVER
BELLEUVE
BELLEVUE
- Build For You Construction LLC: prime, $67,500 on "North Robinswood Sport Field Irrigation Booster Pump Replacement" for City of Bellevue, Bellevue
- Dickson Company: sub to Forma Construction Company, $184,575 on "JO-888 - I-90 Rail Removal" for King County Parks Department, Bellevue
- Division 9 Inc: sub to Howard S Wright, $120,021 on "Bellevue City Hall 1W Suite" for City of Bellevue, Bellevue
- Finishing Edge Washington LLC: sub to Omni Contracting Solutions LLC, $206,690 on "Orchard Gardens" for Commerce, Wa. State Department of (Formerly Cted), Bellevue
- Forma Construction Company: prime, $136,422 on "Hydraulic Brake Test Bench Electrical Implementation" for Sound Transit, Bellevue
- Jma Power Washing LLC: prime, $52,944 on "Larsen Lake Cabin Restore" for City of Bellevue, Bellevue
- K & D Services Inc: prime, $225,000 on "On-Call Traffic Control Services" for City of Bellevue, Bellevue
- Lakeside Industries Inc: sub to Johansen Construction Co LLC, $462,175 on "Mountains to Sound Greenway Trail (142nd to 150th)" for City of Bellevue, Bellevue
- Legacy Group Inc: sub to Corti Construction Inc, $62,615 on "KCLS Bellevue L2 Restroom Remediation" for King County Library System, Bellevue
- Loyal Mechanical Inc: sub to M J Takisaki Inc, $41,300 on "BC - C/D & B/L Building Bridges" for Wash State Dept of Enterprise Services, Bellevue
- Mckinstry Co LLC: prime, $67,800 on "Bellevue College - Caf Refresh" for King County Directors Association, Bellevue
- Motorola Solutions, Inc: prime, $84,635 on "MCC7500 Radio Console Interface to CAD" for North East King County Regional Public, Bellevue
- Olson Brothers Pro-Vac LLC: sub to Holmberg Company, $98,989 on "KC001602, Plumbing Mechanical Construction Work Order" for King County Solid Waste, Bellevue
- Pearson Drilling Inc: sub to Johansen Construction Co LLC, $443,000 on "Mountains to Sound Greenway Trail (142nd to 150th)" for City of Bellevue, Bellevue
- Performance Contracting Inc: sub to G L Y Construction Inc, $51,551 on "Clise Mansion Roof Sunroom Improvements" for King County Parks Department, Bellevue
- S Q I Inc: prime, $51,783 on "Roof Repairs at Fire Station 12" for City of Redmond, Bellevue
- Seawest Construction Inc: sub to Fieldturf USA Inc, $582,000 on "Sammamish HS Baseball Field" for Bellevue School District #405, Bellevue
- Service Electric Co Inc: sub to Fieldturf USA Inc, $126,000 on "Sammamish HS Baseball Field" for Bellevue School District #405, Bellevue
- Van Dam Welding Inc: sub to Highmark Concrete Contrs LLC, $61,760 on "Mountains to Sound Greenway Trail (142nd to 150th)" for City of Bellevue, Bellevue
- West Coast Signal Inc: prime, $148,500 on "140th & Bel-Red Emergency Signal Repair" for City of Bellevue, Bellevue
BELLEVUE, CLYDE HILL
BELLEVUE, EVERETT
BELLINGHAM
- Andgar Mechanical LLC: sub to Wellman & Zuck Consts LLC, $140,852 on "Samish Commons ELC" for Bellingham Housing Authority, Bellingham
- Caz Energy Audits LLC: prime, $49,746 on "Rolstad" for Opportunity Council, the, Bellingham
- Cornerstone Concrete LLC: prime, $47,513 on "Family Shelter Outdoor Rehab" for Domestic Violence & Sexual Asl Svc of Whatcom, Bellingham
- Dawson Construction LLC: prime, $209,597 on "WF-Soil Stockpile Management" for Port of Bellingham, Bellingham
- G K Knutson Inc: sub to Colacurcio Bros Inc, $363,010 on "City of Bellingham What-Comm 911 Emergency Communications Center EF-183 / 59B-2025" for City of Bellingham, Bellingham
- Guardian Security Systems Inc: prime, $56,442 on "City Wide Fire Extinguisher/Panel Inspections" for City of Bellingham, Bellingham
- Hillco Contracting Inc: sub to Highline Construction LLC, $355,002 on "Pacific Street Operations Center Fleet Building Improvements / 8B-2026" for City of Bellingham, Bellingham
- Iron Horse LLC: sub to Ram Const General Contrs LLC, $60,000 on "Merdian Sewer Main, I-5 to Van Wyck / 29B-2024" for City of Bellingham, Bellingham
- Lyndale Glass Inc: sub to Faber Construction Corp, $48,391 on "Lummi School K-12 Expansion" for Lummi Indian Business Council, Bellingham
- Quality Floors LLC: sub to Ram Const General Contrs LLC, $149,360 on "Community Transitions" for Bellingham School District #501, Bellingham
- Quigg Bros Inc: prime, $248,500 on "PORT OF BELLINGHAM SEAVIEW PILINGS" for Port of Bellingham, Bellingham
- Security Solutions NW LLC: prime, $87,696 on "SPRINKLER REPAIR BSD POTTERY ROOM" for Bellingham School District #501, Bellingham
- Security Solutions NW LLC: sub to Valley Plumbing & Electric Inc, $53,654 on "Samish Commons ELC" for Bellingham Housing Authority, Bellingham
- Superior Windows & Glass Inc: sub to Dawson Construction LLC, $292,329 on "New Ferndale City Hall" for City of Ferndale, Bellingham
- Suppression Systems Inc: sub to Faber Construction Corp, $122,900 on "CF Data Center" for Western Washington University, Bellingham
- Western Refinery Services Inc: sub to Tiger Construction Ltd, $190,944 on "Tremont Lift Station EU-193 / 19B-2026" for City of Bellingham, Bellingham
BELLINGHMAN
BENTON CITY, YAKIMA
BEVERLY,COULEE,ELECTRIC,EPHRATA,H ARTLINE,MALAGA,MARLIN,MATTAWA,M OSESLAKE,PALISADES,QUINCY,ROCKIS LAND,ROYALCITY,SOAPLAKE,WARDEN
BLACK DIAMOND
- Big Mountain Enterprises LLC: sub to Kolkay Electric Inc, $225,535 on "Enumclaw Elementary School #6" for Enumclaw School District #216, Black Diamond
- Burly Products Inc: sub to Kiewit Infrastructure West Co, $102,901 on "SR 169, Rock Creek, Ginder Creek & Unnamed Tributaries - Fish Passage - XE3456" for Wash State Dept of Transportation, Black Diamond
- Corona Steel Inc: sub to John Korsmo Construction LLC, $1,032,654 on "Enumclaw Elementary School #6" for Enumclaw School District #216, Black Diamond
- Heckman Inc: sub to Pipe Construction Inc, $219,044 on "Enumclaw Elementary School #6" for Enumclaw School District #216, Black Diamond
- United Test & Balance Inc: sub to Pipe Construction Inc, $68,500 on "Enumclaw Elementary School #6" for Enumclaw School District #216, Black Diamond
BLAINE
- Apollo Solutions Group: prime, $171,195 on "Blain School District PH-I FP510" for Blaine School District #503, Blaine
- Cmi / Dba Mantle Industries LLC: prime, $140,826 on "Aluminum Gangway 072026-1046" for The Northwest Seaport Alliance, Blaine
- Jensen Lee Construction Inc: sub to Summit Construction Group Inc, $46,140 on "Birch Bay Vogt Library Express Renovation" for Whatcom County Library System, Blaine
- Lakeside Industries Inc: prime, $151,637 on "2026 Street Preservation Project" for City of Blaine, Blaine
BONNEY LAKE
- Alliance Partition Systems: sub to John Korsmo Construction LLC, $2,068,000 on "Bonney Lake High School Construction" for Sumner School District #320, Bonney Lake
- Axiom Division 7 Inc: sub to John Korsmo Construction LLC, $757,412 on "Bonney Lake High School Construction" for Sumner School District #320, Bonney Lake
- B E S Electrical Services LLC: sub to John Korsmo Construction LLC, $1,762,000 on "Bonney Lake High School Construction" for Sumner School District #320, Bonney Lake
- Bella Terra LLC: sub to Tapani Inc, $63,819 on "Canyonfalls Creek Pump Station" for Tacoma Public Utilities District, Bonney Lake
- Bill Wheeler Const Co Inc: sub to John Korsmo Construction LLC, $1,915,000 on "Bonney Lake High School Construction" for Sumner School District #320, Bonney Lake
- Gilliardi Logging & Const Inc: sub to Bill Wheeler Const Co Inc, $55,650 on "Bonney Lake High School Construction" for Sumner School District #320, Bonney Lake
- Hot Mix Pavers, Inc: sub to Tapani Inc, $119,193 on "Canyonfalls Creek Pump Station" for Tacoma Public Utilities District, Bonney Lake
- Rockstar Floors LLC: sub to John Korsmo Construction LLC, $108,000 on "Bonney Lake High School Construction" for Sumner School District #320, Bonney Lake
- Warfield Masonry LLC: sub to John Korsmo Construction LLC, $213,711 on "Bonney Lake High School Construction" for Sumner School District #320, Bonney Lake
BONNEY LAKE, SPANAWAY, EATONVILLE, PUYALLUP, GIG HARBOR, STEILACOOM, GRAHAM, UNIVERSITY PLACE, TACOMA, FREDERICKSON, LAKEWOOD, LAKEBAY, ROY, ORTING, BUCKLEY, DUPONT, MCKENNA, PURDY, VAUGHN
BONNEY LAKE, SPANAWAY, PUYALLUP, GRAHAM, GIG HARBOR, STEILACOOM, LAKEWOOD, UNIVERSITY PLACE, TACOMA, FREDERICKSON, LAKEBAY, VAUGHN, EATONVILLE, ORTING, BUCKLEY, DUPONT, MCKENNA, PURDY
- Legacy Telecommunications, LLC: prime, $200,000 on "Countywide Generator Maintenance and Repairs" for Pierce County, Bonney Lake, Spanaway, Puyallup, Graham, Gig Harbor, Steilacoom, Lakewood, University Place, Tacoma, Frederickson, Lakebay, Vaughn, Eatonville, Orting, Buckley, Dupont, Mckenna, Purdy
- Legacy Telecommunications, LLC: prime, $349,000 on "Countywide Generator Maintenance" for Pierce County, Bonney Lake, Spanaway, Puyallup, Graham, Gig Harbor, Steilacoom, Lakewood, University Place, Tacoma, Frederickson, Lakebay, Vaughn, Eatonville, Orting, Buckley, Dupont, Mckenna, Purdy
BOTHELL
- C D K Const Services Inc: prime, $299,100 on "Canyon Park X-Ray Replacement" for King County Public Hospital District #2, Bothell
- Corti Construction Inc: prime, $95,919 on "City of Bothell Police Department Entry TI" for City of Bothell, Bothell
- Eagle Pro Painting LLC: prime, $72,509 on "Bothell Parks Painting Project" for City of Bothell, Bothell
- Evergreen Sign Company: sub to Pcl Construction Srvc Inc, $100,000 on "Stride Bus Rapid Transit (BRT) BUs Base North (BBN)" for Sound Transit, Bothell
- Herzog Industries LLC: sub to Skanska USA Cvl Wst Ca Dst Inc, $474,255 on "I-405, I-405/Brickyard to SR 527 Improvement Project - 009727" for Wash State Dept of Transportation, Bothell
- Jh Kelly LLC: sub to W G Clark Construction Co, $726,217 on "Fire Station 22" for South Snohomish County Fire & Rescue, Bothell
- K Fox Insulation Inc.: sub to Jh Kelly LLC, $42,675 on "Fire Station 22" for South Snohomish County Fire & Rescue, Bothell
- Larusso Concrete Inc: sub to Pcl Construction Srvc Inc, $4,925,512 on "Stride Bus Rapid Transit (BRT) BUs Base North (BBN)" for Sound Transit, Bothell
- Macdonald-Miller Fac Solns LLC: sub to G L Y Construction Inc, $121,150 on "Northshore Middle School-health room remodel" for Northshore School District #417, Bothell
- Mcdowell Northwest Inc: sub to Northwest Construction Inc, $480,850 on "Sammamish River & Waynita Creek Restoration" for City of Bothell, Bothell
- Tmg Wall Systems LLC: sub to W G Clark Construction Co, $620,153 on "Fire Station 22" for South Snohomish County Fire & Rescue, Bothell
- V. Van Dyke, Inc.: sub to Knife River Prestress Inc, $150,000 on "Stride Bus Rapid Transit (BRT) BUs Base North (BBN)" for Sound Transit, Bothell
BREMERTON
- James King Roofing LLC: prime, $42,526 on "Perry Ave Breezeway" for North Perry Ave Water District, Bremerton
- Miles Resources LLC: sub to Active Construction Inc, $123,174 on "E 9th Street Stormwater Improvements" for City of Bremerton, Bremerton
- Mohawk Carpt Distribution LLC: prime, $45,712 on "ESD 114 Phase 1" for Educational Services District #114, Bremerton
- Rivers Edge Envrnmntl Srvs Inc: sub to Abbott Construction LLC, $2,193,217 on "BSD Consolidated Facilities" for Bremerton School District #100, Bremerton
- Take Charge Electric: sub to Key Peninsula Construction LLC, $47,700 on "Illahee State Park - Welcome Station and Entrance Road" for Washington State Parks and Recreation Commission, Bremerton
- Weatherproofing Tech Inc: prime, $47,918 on "VIEW RIDGE ELEMENTARY SCHOOL P&R" for Bremerton School District #100, Bremerton
BREWSTER
BURIEN
- Armadillo Painting Company LLC: sub to G L Y Construction Inc, $236,000 on "Mary's Place Burien Shelter" for Mary's Place Seattle, Burien
- Filco Company Inc: prime, $57,626 on "HOLG-01197" for Pollution Liability Insurance Agency, Burien
- Metro Elevator NW Inc: prime, $116,880 on "Preventative Maintenance" for Highline School District, Burien
- Polygon Us Corporation: sub to Walsh Construction Co/Wash, $45,000 on "Burien Family Supportive" for Mercy Housing, Burien
- Rebar International Inc: sub to Johansen Construction Co LLC, $129,833 on "BT102 Burien Transit Center & Roadwork Project" for Sound Transit, Burien
- Tucci & Sons LLC: sub to Johansen Construction Co LLC, $620,520 on "BT102 Burien Transit Center & Roadwork Project" for Sound Transit, Burien
CAMANO ISLAND
- B C Traffic LLC: sub to Coral Construction Company, $136,225 on "NON-STANDARD GUARDRAIL REPLACEMENT - CAMANO ISLAND" for Island County, Camano Island
- Coral Construction Company: prime, $587,587 on "NON-STANDARD GUARDRAIL REPLACEMENT - CAMANO ISLAND" for Island County, Camano Island
CAMAS
- Apex Steel Inc: sub to Howard S Wright, $384,594 on "Camas-Washougal Fire Department HQ and Station 41" for City of Camas, Camas
- Kodiak Pacific Construction Co: sub to Skyward Construction LLC, $80,850 on "Camas Tennis Center Project" for Camas School District #117, Camas
- Sparrow Electrical LLC: sub to Skyward Construction LLC, $149,079 on "Camas Tennis Center Project" for Camas School District #117, Camas
CAMP MURRAY
CAMP MURRAY, LACEY
CANTON
CARNATION
CASTLE ROCK
- Able Fence Co Inc: sub to Tapani Inc, $64,000 on "Burma Road Toutle Park Road Bypass Project" for Cowlitz County Public Works, Castle Rock
- Ase LLC: sub to S & W Painting, $45,500 on "Cowlitz Fire Dist 6 Remodel" for Cowlitz County Fire District #6, Castle Rock
- Omega Morgan Cranes LLC: sub to Quigg Bros Inc, $61,140 on "Cowlitz Tower Road Bridge" for Cowlitz County Public Works, Castle Rock
CEDONIA
CENTRALIA
- Northeast Electric LLC: sub to R L Alia Company, $623,000 on "Washington Elementary and Oakview Elementary Student Safety" for City of Centralia, Centralia
- Specialized Pavement Mrkg LLC: sub to R L Alia Company, $67,572 on "Washington Elementary and Oakview Elementary Student Safety" for City of Centralia, Centralia
CHATTAROY
CHEHALIS
- Al's Welding & Steel Fab Inc: sub to C D K Const Services Inc, $222,682 on "Bow Lake Recycling & Transfer Station" for King County Solid Waste, Chehalis
- Al's Welding & Steel Fab Inc: sub to Cornerstone General Contrs Inc, $2,123,479 on "EVC-Baker Hall Replacement-Preconstruction" for Wash State Dept of Enterprise Services, Chehalis
- Granite Construction Company: sub to Taycon LLC, $51,360 on "SWWF Friendlyville Improvements" for Lewis County, Chehalis
- Northwest Boring Co Inc: sub to Hcon Incorporated, $126,374 on "Curtis Hill Road and SR 6 Water Main Replacement" for Boistfort Valley Water Corp, Chehalis
- Pacific Rim Serv/Const Co Inc: sub to Kerr Contractors Oregon LLC, $68,619 on "I-5, 1.2 Mi. S. of Rogers Rd to SR 505 Vic - Paving - XE3728" for Wash State Dept of Transportation, Chehalis
- Performance Contracting Inc: sub to Mckinstry Co LLC, $98,570 on "Winlock HS - MS HVAC Upgrade" for Winlock School District #232, Chehalis
- Pioneer Masonry Rstrtn Co Inc: prime, $41,306 on "Lewis County PUD" for Lewis County Public Utility District, Chehalis
- Pioneer Masonry Rstrtn Co Inc: prime, $93,702 on "Historic Courthouse Repointing of S Lower Elevation" for Lewis County Public Facilities District, Chehalis
- Trs Mechanical Inc: prime, $45,739 on "WSP Chehalis HVAC Maintenance & Service Contract" for State Patrol, Washington, Chehalis
CHELAN, MANSON,WENATCHEE
CHENEY
- Cameron-Reilly LLC: prime, $184,650 on "2025 Service Charge Phase 2 and Cheney Phase 2" for Spokane Transit Authority, Cheney
- Cameron-Reilly LLC: sub to Northwest Turf Solutions Inc, $59,188 on "2026 Pickleball and Tennis Court Project" for City of Cheney, Cheney
CHEWELAH
CITY OF SPOKANE
CITY OF SPOKANE VALLEY
- Swinerton Builders: prime, $122,710 on "CVVL HS Exterior Wall Repair" for Central Valley School District #356, City of Spokane Valley
- Systech Mechanical LLC: sub to Kw Energy LLC, $61,073 on "HVAC upgrade" for Woodland Montessori School, City of Spokane Valley
- Turftec USA LLC: sub to Cameron-Reilly LLC, $384,000 on "Meadowglen Park Development" for City of Spokane, City of Spokane Valley
CLALLAM BAY
CLARKSTON
- Apollo Solutions Group: prime, $63,430 on "CLARKSTON SCHOOL DISTRICT PH VI FP251 IAQ GRANT" for Clarkston School District #250, Clarkston
- Jetco Machine/Fabrication LLC: prime, $873,902 on "Flow Barrier Cover Plates" for Douglas County Public Utility District, Clarkston
CLE ELUM
- Arrow Insulation Inc: prime, $52,875 on "HopeSource - Taylor" for Hopesource, Cle Elum
- T Bailey LLC: sub to Burton Construction Inc, $46,372 on "Bullfrog AMF - Water Storage Tank Removal - SCR" for Wash State Dept of Transportation, Cle Elum
- Triple River Construction LLC: prime, $210,550 on "Iron Ck RM 0.9-3.1; WF Iron Ck RM 0.0-0.3; Hovey Ck RM 0.25-0.36 Wood Placement & Road Decommission" for Mid-Columbia Fisheries Enhancement Group, Cle Elum
- Wayne Dalton Sales & Service: sub to Belsaas & Smith Const Inc, $57,981 on "New Search & Rescue/EOC Facility" for Kittitas County, Cle Elum
CLYDE HILL
COLFAX
COLUMBIA
COLVILLE
- Cameron-Reilly LLC: sub to Lydig Construction Inc, $43,533 on "Colville Reservoir No. 2 Replacement" for City of Colville, Colville
- Grt Crane Services: sub to Lydig Construction Inc, $107,285 on "Colville Reservoir No. 2 Replacement" for City of Colville, Colville
CONNELL
COOK
COUPEVILLE
- All American Drywall Contr LLC: sub to Millig LLC, $55,750 on "IC Law & Justice Center Energy Upgrades" for Wash State Dept of Enterprise Services, Coupeville
- Justin's Excavating LLC: sub to Triple C Construction Svcs LLC, $100,000 on "Ryan's House for Youth" for Commerce, Wa. State Department of (Formerly Cted), Coupeville
- Trico Companies LLC: prime, $664,928 on "Whidbey Health CT Imaging Room Conversion" for Whidbey Island Public Hospital District, Coupeville
- Well Done Interiors LLC: sub to Triple C Construction Svcs LLC, $45,160 on "Ryan's House for Youth" for Commerce, Wa. State Department of (Formerly Cted), Coupeville
COVINGTON
- Mcgregor Door & Hardware LLC: sub to Gencap Construction Corp, $44,055 on "Covington PW Maintenance Facility" for City of Covington, Covington
- Quail Electric LLC: sub to J A Morris Construction LLC, $138,000 on "2101 HQ Bldg A Rehab" for Covington Water District, Covington
- Superior Framing Solutions LLC: sub to Gencap Construction Corp, $93,437 on "Covington PW Maintenance Facility" for City of Covington, Covington
CRESTON
CURLEW
DALLESPORT
DAVENPORT
DEER PARK
DEMING
DES MOINES
- Acoustical Design Inc: sub to Skanska USA Building Inc, $176,654 on "Pacific MS Replacement Project" for Highline School District, Des Moines
- Acoustics Northwest Inc: sub to Skanska USA Building Inc, $294,655 on "Pacific MS Replacement Project" for Highline School District, Des Moines
- Daktronics Inc: sub to Skanska USA Building Inc, $182,375 on "Pacific MS Replacement Project" for Highline School District, Des Moines
Browse WaPublicWorksIntentPulse by category and location · Search and filter WaPublicWorksIntentPulse