WaPublicWorksIntentPulse: all 1,000 record reports, page 4 of 5
Every WaPublicWorksIntentPulse record report, 200 per page, grouped by state. Records 601 to 800: Mill Plain Electric Inc: prime, $182,679 on "SeaTac, WA EV" for King County Administration Bldg, Seatac to Lydig Construction Inc: prime, $3,500,000 on "Partner's INW - Ziggy's TI" for Partners Inland Northwest, Spokane Valley. Source: Washington State Department of Labor & Industries prevailing wage Statements of Intent (data.wa.gov).
SEATAC
- Mill Plain Electric Inc: prime, $182,679 on "SeaTac, WA EV" for King County Administration Bldg, Seatac
- Mohawk Carpt Distribution LLC: prime, $49,941 on "City of Seatac Community Center" for City of Seatac, Seatac
- Northwest Playground Equip LLC: prime, $236,287 on "McMicken/KaBoom Site Furnishings & Turf" for City of Seatac, Seatac
- Omni Mechanical Inc: sub to Innspace, $119,385 on "Innspace Seattle Office TI" for Port of Seattle, Seatac
- PNW Reinforcing Inc: sub to Gary Merlino Const Co Inc, $70,777 on "188th Duct Bank Crossing" for Port of Seattle, Seatac
- Pumptech LLC: prime, $44,237 on "Port of Seattle Lift Station Inspections (Round 2)" for Port of Seattle, Seatac
- Shinn Mechanical Inc: prime, $7,348,750 on "Deaerator and Condensate System Upgrade" for Port of Seattle, Seatac
- Vallejo Enterprises: prime, $114,057 on "TV service install/fber" for Port of Seattle, Seatac
SEATAC AIRPORT
SEATTLE
- A & B Fabricators Inc: sub to G L Y Construction Inc, $1,156,592 on "Seattle Center Monorail Station Reconfiguration" for City of Seattle, Seattle
- Airganic LLC: prime, $62,155 on "OTE09182026" for Seattle Office of Housing Homewise Program, City O, Seattle
- All City Fence Co: sub to G L Y Construction Inc, $155,473 on "NMOW Security and Fencing" for Sound Transit, Seattle
- Architectural Sheet Metal Inc: sub to Wayne's Roofing Inc, $5,328,073 on "Aki Kurose Middle School" for Seattle School District, Seattle
- Artistic Drywall Textures Inc: sub to Pacific Mobile Structures Inc, $134,113 on "King county Harborview 3 story TIPS Construction" for King County, Seattle
- Associated Underwater Svcs Inc: sub to Skanska USA Building Inc, $150,000 on "Terminal 91/Pier 66 Cruise Shore Power Extensions Progressive Design Build" for Port of Seattle, Seattle
- Avi-Spl LLC: prime, $95,372 on "UW LLC Classroom 159 Upgrade" for University of Washington, Seattle
- Barclay Dean Archtl Prdts LLC: sub to Lydig Construction Inc, $177,000 on "Aki Kurose Middle School" for Seattle School District, Seattle
- Best Choice Plumbing Inc: sub to M A D Construction LLC, $77,000 on "William Grose Center for Cultural Innovation" for City of Seattle, Seattle
- Brandsafway Services LLC: sub to Grayhawk Construction Co Inc, $250,000 on "Aki Kurose Middle School" for Seattle School District, Seattle
- Brandsafway Services LLC: sub to Lydig Construction Inc, $250,000 on "Aki Kurose Middle School" for Seattle School District, Seattle
- Bulldog Plumbing & Design LLC: sub to Marpac Construction LLC, $43,000 on "Star Center Renovation" for Downtown Emergency Center, Seattle
- C & P Fencing: sub to Scarsella Bros Inc, $91,596 on "Terminal 5 Container Yard Expansion" for Port of Seattle, Seattle
- C R Floors & Interiors Inc: sub to Pacific Mobile Structures Inc, $271,380 on "King county Harborview 3 story TIPS Construction" for King County, Seattle
- Carrier Corporation: prime, $78,192 on "CHILLER MAINTENANCE SERVICES 2026-2028" for Port of Seattle, Seattle
- Columbia Allied Services Inc: sub to Kassel & Associates Inc, $284,420 on "Bakun Building Improvements" for City of Seattle, Seattle
- Compass General Const I LLC: prime, $7,150,023 on "Roots Young Adult Shelter Phase 2B" for Roots Young Adult Shelter, Seattle
- Crux Diving Inc: sub to Massana Construction Inc, $1,339,415 on "SR 519, SEATTLE FERRY TERMINAL PILE CORROSION MITIGATION-XE3752" for Wash State Dept of Transportation, Seattle
- Cummins Inc: prime, $100,993 on "PLANNED MAINTENANCE" for Seattle City Light, Seattle
- D & G Mech Insulation Inc: sub to Johansen Mechanical Inc, $126,378 on "SPL Carnegie Cooling Centers W Seattle" for Seattle Public Library, Seattle
- D D J Construction Welding Inc: sub to Massana Construction Inc, $90,577 on "SR 519, SEATTLE FERRY TERMINAL PILE CORROSION MITIGATION-XE3752" for Wash State Dept of Transportation, Seattle
- Davis Door Service Inc: sub to C D K Const Services Inc, $145,748 on "SHA JOC - Job #1" for Seattle Housing Authority, Seattle
- Dickson Company: prime, $41,086 on "250102 Morgan Street Demo" for Habitat For Humanity of Seattle-King County, Seattle
- E C Company: sub to Johnson Controls Bldg Sol LLC, $49,945 on "Fluid Cooler Repl. W. Hospital Harborview M.C." for Wash State Dept of Enterprise Services, Seattle
- Entrance Controls Inc: prime, $41,944 on "26371 - SDOT University Bridge" for Seattle, City of/Department of Transportation, Seattle
- Entrance Controls Inc: prime, $45,490 on "26369 - SDOT Ballard Bridge" for Seattle, City of/Department of Transportation, Seattle
- Entrance Controls Inc: prime, $47,776 on "26370 - SDOT Fremont Bridge" for Seattle, City of/Department of Transportation, Seattle
- Evergreen Technologies Inc: sub to Valley Elec Co of Mtvernon Inc, $846,894 on "Aki Kurose Middle School" for Seattle School District, Seattle
- Filco Company Inc: prime, $54,318 on "HOLG-01198" for Pollution Liability Insurance Agency, Seattle
- Filco Company Inc: prime, $60,000 on "HOLG-01195" for Pollution Liability Insurance Agency, Seattle
- Filco Company Inc: prime, $60,000 on "HOLG-01216" for Pollution Liability Insurance Agency, Seattle
- Finishing Edge Washington LLC: sub to Pacific Mobile Structures Inc, $222,915 on "King county Harborview 3 story TIPS Construction" for King County, Seattle
- Forma Construction Company: prime, $125,567 on "Jane Adams Emergency Theater Rigging Demo" for Seattle School District, Seattle
- Forma Construction Company: prime, $270,903 on "SCC - (BE & BPH) Ext. Door Replacement" for Wash State Dept of Enterprise Services, Seattle
- Forma Construction Company: prime, $47,740 on "Hamilton Middle School, Permanent Climbing Barrier" for Seattle School District, Seattle
- Forrest Sound Products LLC: sub to Jtm Construction Inc, $89,762 on "Seattle Municipal Tower Floors 28,30,32-36 City Light TI" for Seattle City Light, Seattle
- G L Y Construction Inc: prime, $161,769 on "N10755-T5 Lift Station no. 3 Safety Improvements" for Port of Seattle, Seattle
- Gary Merlino Const Co Inc: prime, $500,000 on "Cedar Hills Regional Landfill Building Repair Services Work Order" for King County Solid Waste, Seattle
- Gonzales Boring/Tunneling Inc: sub to C A Carey Corporation, $1,692,400 on "PS 56 Abandonment & Trenchless Sewer Installation 2025" for Seattle Public Utilities, Seattle
- Guardian Security Systems Inc: prime, $88,500 on "UW Dry Standpipe Repair" for University of Washington, Seattle
- Herzog Industries LLC: prime, $120,000 on "Brown Bear Glass Replacement" for Woodland Park Zoo, Seattle
- Herzog Industries LLC: prime, $70,000 on "Charles St Facility" for City of Seattle, Seattle
- Hoffman Construction Co of Wa: prime, $101,000,000 on "GC/CM Services for West Point - WP EIP early procurement, electrical service entrance, fiber network & early constructio" for King County, Seattle
- Holaday Parks Inc: sub to Trane, $499,319 on "Cascade Court DHW Decarb" for Bellwether Housing, Seattle
- Hot Mix Pavers, Inc: sub to Jansen Inc, $251,650 on "Unit Price Curb Ramps and Sidewalks Contract 4" for Seattle, City of/Department of Transportation, Seattle
- Hydro2geotech LLC: sub to Midmountain Contractors Inc, $44,950 on "5TH AVE & COLUMBIA ST EMERGENCY SEWER MAINLINE REPAIR" for City of Seattle, Seattle
- Industry Erectors Inc: sub to Andersen Const Co of Wash LLC, $190,416 on "Centralized Cooling Building Connections" for University of Washington, Seattle
- Interior Specialists Inc: sub to Marpac Construction LLC, $48,428 on "Star Center Renovation" for Downtown Emergency Center, Seattle
- Interior Technology Inc: sub to Flatiron West Inc, $86,667 on "SCWQP: Tunnel Effluent Pump Station-Ballard Conveyance" for Seattle Public Utilities, Seattle
- Interior Technology Inc: sub to Lydig Construction Inc, $215,000 on "Aki Kurose Middle School" for Seattle School District, Seattle
- J S Perrott & Co: sub to Sellen Constr Co Inc, $149,983 on "PNB Seattle SODO School" for Pacific Northwest Ballet Association, Seattle
- Jammie's Enviromental Inc: sub to Orion Marine Contractors Inc, $145,368 on "Terminal 91/Pier 66 Cruise Shore Power Extensions Progressive Design Build" for Port of Seattle, Seattle
- Jansen Inc: prime, $4,000,000 on "Unit Price Curb Ramps and Sidewalks Contract 4" for Seattle, City of/Department of Transportation, Seattle
- Johnson Barrow LLC: sub to Macdonald-Miller Fac Solns LLC, $167,230 on "UW Power Plant North CT Media" for University of Washington, Seattle
- Johnson Controls Bldg Sol LLC: sub to Macdonald-Miller Fac Solns LLC, $411,645 on "Harborview Medical Center Valve Replacements" for Wash State Dept of Enterprise Services, Seattle
- Johnson Controls Fire Prttn LP: prime, $281,273 on "Seattle Justice Center" for City of Seattle, Seattle
- Johnson Controls Fire Prttn LP: sub to Andersen Const Co of Wash LLC, $1,851,747 on "FA Panel Upgrades Phase 2" for University of Washington, Seattle
- Long Painting Co: sub to G L Y Construction Inc, $686,928 on "Seattle Center Monorail Station Reconfiguration" for City of Seattle, Seattle
- M A Mortenson Company: prime, $152,983 on "Field Seat Platform Refurbishment" for Wash State Public Stadium Authority, Seattle
- Ma Construction Services Inc: sub to American West Contracting Co, $411,745 on "Primeau Place Reclad Project" for Seattle Housing Authority, Seattle
- Macdonald-Miller Fac Solns LLC: prime, $148,690 on "SMT Elevator Machine RM AC Rep" for City of Seattle, Seattle
- Macdonald-Miller Fac Solns LLC: prime, $51,169 on "UWMC-EA03 Espresso Drn Rpr PH2" for University of Washington Hospital, Seattle
- Macdonald-Miller Fac Solns LLC: sub to Abbott Construction LLC, $176,012 on "UWMC ML PCCT UPGRADE SA2305 (NW A-WING 238 & ML SA2305)" for University of Washington Hospital, Seattle
- Mak's Dump Truck LLC: sub to Skanska USA Cvl Wst Ca Dst Inc, $50,000 on "SR 520, I-5 to Montlake I/C and Bridge Replacement Project - 009775" for Wash State Dept of Transportation, Seattle
- Mattison Martinoli Inc: sub to Lydig Construction Inc, $121,459 on "Aki Kurose Middle School" for Seattle School District, Seattle
- Mckinstry Co LLC: prime, $43,136 on "HMC R&T Autoclaves" for Harborview Medical Center, Seattle
- Mckinstry Co LLC: prime, $81,000 on "NWH - Xray Room 227" for University of Washington Hospital, Seattle
- Midmountain Contractors Inc: prime, $98,942 on "5TH AVE & COLUMBIA ST EMERGENCY SEWER MAINLINE REPAIR" for City of Seattle, Seattle
- Modern Metals LLC: prime, $403,315 on "14378 30TH AVE NE Affordable Housing Project" for Seattle Housing Authority, Seattle
- Netcompliance Envrmntl Svc LLC: sub to Jtm Construction Inc, $88,200 on "Seattle Municipal Tower Floors 28,30,32-36 City Light TI" for Seattle City Light, Seattle
- Northern Hardwood Co Inc: sub to Sustainable Floors Inc, $66,629 on "UW Haggett Hall Replacement" for University of Washington, Seattle
- Northwest Lng/Geotxtl Prd Inc: sub to Pivetta Brothers Const Inc, $256,684 on "Bitter Lake Reservoir Improvements" for City of Seattle, Seattle
- Northwest School Equipment Inc: sub to Lincoln Construction Inc, $49,583 on "Lakeridge Elementary Seismic Upgrade and Grounds/Fields Improvements" for Renton School District #403, Seattle
- NW Tank Lining & Inspect Inc: sub to Gary Merlino Const Co Inc, $56,000 on "Transit Facility Improvements Work Order (FTA)" for King County Metro Transit, Seattle
- Olympic Interiors Inc: sub to Jtm Construction Inc, $49,400 on "UW Crest/Camp New 3D Printing Suite" for University of Washington, Seattle
- Out West Lndscp & Irrigtn Inc: sub to Midmountain Contractors Inc, $49,500 on "SEWER REHAB PIKE-DAKOTA-107TH" for City of Seattle, Seattle
- P B S Supply Company Inc: sub to Lydig Construction Inc, $389,070 on "Aki Kurose Middle School" for Seattle School District, Seattle
- Pacific Fishermen Shipyard and Electric, LLC: prime, $45,000 on "Dry Dock & Rudder repair/Prop Replace" for King County Metro Transit, Seattle
- Pacific Steel Group LLC: sub to Michels Construction, Inc, $134,466 on "W205 Bi-Directional Load Test" for Sound Transit, Seattle
- Peak Drywall Solutions Inc: prime, $870,000 on "Licton Springs Park Public Restroom Replacement" for City of Seattle, Seattle
- Performance Contracting Inc: sub to Forma Construction Company, $41,645 on "South Roof Replacement and Restroom Improvements" for Woodland Park Zoo, Seattle
- Pullman Sst Inc: sub to Lincoln Construction Inc, $72,800 on "Lakeridge Elementary Seismic Upgrade and Grounds/Fields Improvements" for Renton School District #403, Seattle
- Red Hawk Fire Protection LLC: prime, $109,933 on "CCTV Camera Upgrades at Bryn Mawr Elementary" for Renton School District #403, Seattle
- Resicon LLC: prime, $73,626 on "OTE08282026" for Seattle Office of Housing Homewise Program, City O, Seattle
- Rp Painting and Drywall Inc: sub to M A D Construction LLC, $50,655 on "William Grose Center for Cultural Innovation" for City of Seattle, Seattle
- Sak Builders Inc: sub to Ward-Henshaw Const Co Inc, $193,850 on "Bitter Lake Reservoir Improvements" for City of Seattle, Seattle
- Saybr Contractors Inc: prime, $321,826 on "SSC-Culinary Arts Building Fascia Renovation" for Wash State Dept of Enterprise Services, Seattle
- Schindler Elevator Corp: prime, $6,565,140 on "Port-Wide Conveyance Maintenance and Repair Services" for Port of Seattle, Seattle
- Seawest Construction Inc: sub to Kassel & Associates Inc, $70,660 on "SPL Fremont Carnegie Cooling Centers" for Seattle Public Library, Seattle
- Sebastian Gc Inc: sub to Prospect Construction Inc, $510,097 on "Bitter Lake Reservoir Improvements" for City of Seattle, Seattle
- Siemens Industry Inc: prime, $44,815 on "BWA2 BAU SMT Flr 32 33 HP Controls Meter" for City of Seattle, Seattle
- Siemens Industry Inc: sub to Crescent Mechanical Inc, $192,020 on "Bakun Building Improvements" for City of Seattle, Seattle
- Skyline Tile & Marble Inc: sub to Sellen Constr Co Inc, $146,890 on "Memorial Stadium Redevelopment" for City of Seattle, Seattle
- Snyder Roofing of Wash LLC: sub to Forma Construction Company, $244,060 on "South Roof Replacement and Restroom Improvements" for Woodland Park Zoo, Seattle
- Snyder Roofing of Wash LLC: sub to Kassel & Associates Inc, $275,385 on "Bakun Building Improvements" for City of Seattle, Seattle
- Solar Art American Window Film: sub to Mission Glass LLC, $145,945 on "L230-NE 130TH STREET INFILL STATION FINISHES" for Sound Transit, Seattle
- Solidus Fabrication & Dsgn LLC: sub to Vigor Marine LLC, $76,054 on "M.V. KALEETAN DRYDOCKING" for Wash State Dept of Transportation, Seattle
- Sound Glass Sales Inc: sub to Kassel & Associates Inc, $555,971 on "Bakun Building Improvements" for City of Seattle, Seattle
- Stagecraft Industries Inc: sub to Forma Construction Company, $84,925 on "Jane Adams Emergency Theater Rigging Demo" for Seattle School District, Seattle
- Steady Flow Swr & Drain Co: prime, $279,569 on "3415 45th AVE NE Emergency Grinder Pump Installation" for Seattle Public Utilities, Seattle
- Story Acoustics Inc: sub to Wayne's Roofing Inc, $188,970 on "Salmon Bay Reroof" for Seattle School District, Seattle
- Subsurface Construction LLC: sub to Midmountain Contractors Inc, $103,600 on "5TH AVE & COLUMBIA ST EMERGENCY SEWER MAINLINE REPAIR" for City of Seattle, Seattle
- Todd A Welch Inc: sub to Skagit Architectural Millwk In, $63,000 on "Seattle Municipal Tower Floors 28,30,32-36 City Light TI" for Seattle City Light, Seattle
- Walker Rebar Inc: sub to Ox Concrete LLC, $45,000 on "West Sound Technical Skills Center Improvement Project" for Bremerton School District #100, Seattle
- Walker Specialty Const Inc: sub to G & W Commercial Flooring Inc, $64,800 on "HMC GEH & GCT ROOMS" for Harborview Medical Center, Seattle
- Washington Best Finishes LLC: sub to Forma Construction Company, $79,796 on "SCC - (BE & BPH) Ext. Door Replacement" for Wash State Dept of Enterprise Services, Seattle
- Washington Marine Cleaning LLC: sub to Vigor Marine LLC, $41,650 on "M.V. KALEETAN DRYDOCKING" for Wash State Dept of Transportation, Seattle
- Waters Construction Inc: sub to Centennial Contractors Ent Inc, $176,800 on "Northgate Wrong Side Door East Side South Wing" for Sound Transit, Seattle
- Waters Construction Inc: sub to Centennial Contractors Ent Inc, $179,928 on "ST Union Station Slip Hazard Repair" for Sound Transit, Seattle
- Western Neon Inc: sub to G L Y Construction Inc, $263,933 on "Seattle Center Monorail Station Reconfiguration" for City of Seattle, Seattle
- Western Towboat Co.: sub to Manson Construction Co, $108,133 on "South Leschi Marina Attenuator and Public Facility" for City of Seattle, Seattle
SEATTLE, EVERETT
SELAH
- Alden Plumbing LLC: sub to Stellar J Corporation, $51,500 on "Phase 2 - WWTP Improvements" for City of Selah, Selah
- B C V Inc: prime, $41,623 on "2026 Crack Sealing" for City of Selah, Selah
SELAH, WA
SHELTON
- Mayda & Sons Mechanical: sub to F P H Construction Inc, $512,335 on "SF Olympic Moutnain Ice Cream Expansion" for Port of Shelton, Shelton
- Netcompliance Envrmntl Svc LLC: sub to Ge Renewables Us LLC, $206,279 on "Cushman 2 Unit 31, 32 Rebuild" for Tacoma Public Utilities District, Shelton
SHORELINE
- Burton Construction Inc: prime, $499,335 on "Spartan Rec Center HVAC Replacement" for City of Shoreline, Shoreline
- Corona Steel Inc: sub to Forma Construction Company, $143,076 on "Shoreline Parks Improvements Bundle" for City of Shoreline, Shoreline
- Cressy Door Co Inc: sub to Kiewit Building Group Inc, $100,265 on "Fircrest Nursing Facility" for Fircrest Properties, Shoreline
- Innovative Millwork Soltns LLC: sub to Mission Bell Mfg Inc, $414,728 on "Fircrest Nursing Facility" for Fircrest Properties, Shoreline
- Psf Mechanical Inc: prime, $50,000 on "2026-ANNUAL INTENT FOR T&M WORK FOR CITY OF SHORELINE SITES FOR THE YEAR" for City of Shoreline, Shoreline
SILVER FIRS ,MILL CREEK EVERETT AND MONROE
SKOKOMISH
SKOKOMISH NATION
SNOHOMISH
- Elevator Support Company LLC: prime, $62,116 on "2026-7 SY PM" for Snohomish School District #201, Snohomish
- Graham Const & Management Inc: prime, $4,878,000 on "Snohomish Clinic" for Snohomish County Public Hospital District #1, Snohomish
- Moon Construction Company: prime, $137,151 on "Snohomish Library Wall Repair" for Sno-Isle Regional Library, Snohomish
- Next Generation 1 LLC: sub to Timberline Communications LLC, $48,000 on "SSP-6184" for Ziply Fiber, Snohomish
SNOQUALMIE
- The Controls Group Services, Inc.: sub to Evergreen Power Systems Inc, $50,000 on "SVSD #410 MT SI HIGH SCHOOL" for Snoqualmie Valley School District #410, Snoqualmie
- Zesbaugh, Inc: sub to G L Y Construction Inc, $167,967 on "Snoqualmie Valley Health MOB/ASC Project" for King County Public Hospital District #4, Snoqualmie
SOAP LAKE
- Northwest Playground Equip LLC: prime, $601,104 on "Soap Lake ES Playground" for Soap Lake School District #156, Soap Lake
- Tanz Mechanical Insulation LLC: sub to Apollo Solutions Group, $57,000 on "Soap Lake SD Indoor Air Quality" for Wash State Dept of Enterprise Services, Soap Lake
SOUTH BEND
SOUTH CLE ELUM
SPANAWAY
- Lizard Wtrprfing/Deck Ctng LLC: sub to Cornerstone General Contrs Inc, $85,299 on "Cedarcrest Middle School" for Bethel School District, Spanaway
- Osborn Concrete & Consult LLC: sub to Howard S Wright, $52,500 on "Spanaway Lake HS Greenhouse" for Bethel School District, Spanaway
- Pacific Sound Soln Const Inc: sub to Habitat For Humnty-Tac/Prc Cty, $54,000 on "PCHA Acquisitions" for Commerce, Wa. State Department of (Formerly Cted), Spanaway
- R L Alia Company: prime, $2,158,377 on "168th Street East - SR 7 to B St. E." for Pierce County, Spanaway
SPOKANE
- Aci Northwest Inc: sub to Professional Piping Inc, $158,474 on "SPCC - Main Building-East Wing Renovation - Core & Shell-Mini MACC02" for Wash State Dept of Enterprise Services, Spokane
- Aci Northwest Inc: sub to Professional Piping Inc, $188,578 on "SPCC - Main Building - East Wing Renovation (PRECONSTRUCTION)" for Wash State Dept of Enterprise Services, Spokane
- Allstar Glass Company: sub to Bouten Construction Company, $335,025 on "SPCC - Main Building-East Wing Renovation - Core & Shell-Mini MACC02" for Wash State Dept of Enterprise Services, Spokane
- Atlas Boiler/Equipment Co Inc: prime, $156,500 on "ARFF Building HVAC Maintenance" for Spokane Airport Board, Spokane
- Beynon Sports Surfaces Inc: prime, $97,467 on "Podium Track Rprs & Restripe" for Spokane Public Facilities District, Spokane
- Bugle NW Inc: sub to North Wind Site Services, LLC, $115,888 on "Spokane County PFAS Water Filtration Phase 1 Project" for Spokane County Purchasing, Spokane
- Burton Construction Inc: prime, $499,632 on "Ft Wright Building Demo" for Wash State Military, Spokane
- C & S Glass Company Inc: sub to Leone & Keeble Inc, $96,600 on "Water Department Main Office Renovation - Phase 2" for City of Spokane, Spokane
- Colvico Inc: prime, $207,726 on "Taxiway K Circuit Replacement" for Spokane Airport Board, Spokane
- Colvico Inc: sub to Liberty Concrete LLC, $443,550 on "Fish Lake Tail Connection Phase 1" for City of Spokane, Spokane
- Custom Energy Consultants: prime, $178,818 on "Retro Cx Ph. II SFCC 27 & SCC 28" for Wash State Dept of Enterprise Services, Spokane
- Cutting Edge Plmb & Mech Inc: sub to Leone & Keeble Inc, $116,000 on "Water Department Main Office Renovation - Phase 2" for City of Spokane, Spokane
- Dsi Construction Inc: sub to Leone & Keeble Inc, $145,425 on "Water Department Main Office Renovation - Phase 2" for City of Spokane, Spokane
- Dsi Construction Inc: sub to Spilker Contracting LLC, $114,875 on "Upriver Dam Office Building Interior Renovation" for City of Spokane, Spokane
- Freedom Iron LLC: sub to Leone & Keeble Inc, $52,777 on "Water Department Main Office Renovation - Phase 2" for City of Spokane, Spokane
- Great Northern Masonry Co: sub to Bouten Construction Company, $210,000 on "FBH CHAS Sprague Clinic" for Commerce, Wa. State Department of (Formerly Cted), Spokane
- Harris Rebar Columbia Bsin Inc: sub to Garco/Qd Builders A Joint Vent, $41,456 on "TREX Central Hall" for Spokane International Airport, Spokane
- I R S Environmental of Wa Inc: sub to Leone & Keeble Inc, $50,000 on "Water Department Main Office Renovation - Phase 2" for City of Spokane, Spokane
- Idaho Fence Company: sub to Leone & Keeble Inc, $44,700 on "SELKIRK K-12 ADDITION & MODERNIZATION" for Selkirk School District #70, Spokane
- Inland Asphalt Co: sub to Leone & Keeble Inc, $100,095 on "Water Department Main Office Renovation - Phase 2" for City of Spokane, Spokane
- Kilgore Tec Products Inc: sub to Bouten Construction Company, $41,935 on "FBH CHAS Sprague Clinic" for Commerce, Wa. State Department of (Formerly Cted), Spokane
- Knight Const / Supply Inc: prime, $2,500,000 on "WTEF Mechanical repairs 26-27" for City of Spokane, Spokane
- Knight Const / Supply Inc: prime, $322,823 on "WTEF Fabric Filter Bag Change" for City of Spokane, Spokane
- Kone Inc: prime, $274,977 on "ELEVATOR AND ESCALATOR MAINTENANCE" for Spokane Airport Board, Spokane
- Mackin & Little Inc: sub to Custom Energy Consultants, $156,026 on "25/27 SFCC, SCC Campus HVAC Improvements" for Wash State Dept of Enterprise Services, Spokane
- Maverik Electric LLC: sub to Spilker Contracting LLC, $88,000 on "Upriver Dam Office Building Interior Renovation" for City of Spokane, Spokane
- Modern Glass Company: sub to Garco/Qd Builders A Joint Vent, $61,273 on "TREX Central Hall" for Spokane International Airport, Spokane
- Northwest Fence Company Inc: sub to Liberty Concrete LLC, $47,674 on "Fish Lake Tail Connection Phase 1" for City of Spokane, Spokane
- Power City Electric Inc: sub to K&N An Impel Company, $51,921 on "POWERHOUSE 2 TRASH RAKE REPLACEMENT" for City of Spokane, Spokane
- Power City Electric Inc: sub to Mcclintock & Turk Inc, $43,900 on "Serpentix Replacement Project" for City of Spokane, Spokane
- Q&D Construction LLC: sub to Shamrock Paving Inc, $166,000 on "Runway Intersection Rehabilitation" for Spokane Airport Board, Spokane
- R P C LLC: sub to Liberty Concrete LLC, $79,890 on "COS Make Beacon Hill Public Ph 2" for City of Spokane, Spokane
- Rob's Demolition Inc: sub to M J Takisaki Inc, $167,850 on "SFCC - Building 6 Demolition and Site Restoration" for Wash State Dept of Enterprise Services, Spokane
- Silver Ridge Construction LLC: sub to North Wind Site Services, LLC, $89,506 on "Spokane County PFAS Water Filtration Phase 1 Project" for Spokane County Purchasing, Spokane
- Spokane Acoustics Inc: sub to Leone & Keeble Inc, $51,226 on "Orchard Prairie School Modernization & Replacement" for Orchard Prairie School District #123, Spokane
- T5 Enterprises LLC: sub to Spilker Contracting LLC, $138,000 on "Upriver Dam Office Building Interior Renovation" for City of Spokane, Spokane
- T5 Enterprises LLC: sub to Spilker Contracting LLC, $192,560 on "Spokane Police Academy Addition" for City of Spokane, Spokane
- The Fa Bartlett Tree Expert Co: prime, $125,000 on "Tree Equity Spokane - Tree Removal" for City of Spokane, Spokane
- Titan Mechanical Inc: prime, $136,173 on "Rogers Burner Replacement" for Spokane School District #81, Spokane
- Trailhead Tree Service LLC: prime, $375,000 on "Tree Removal - On Call-As Needed" for City of Spokane Parks & Recreation, Spokane
- Vector Electric Corporation: sub to Leone & Keeble Inc, $464,805 on "Water Department Main Office Renovation - Phase 2" for City of Spokane, Spokane
- Weatherproofing Tech Inc: prime, $181,121 on "SPOKANE FALLS COMMUNITY COLLEGE #15" for Spokane Falls Community College, Spokane
- Western Hardwood Flooring Inc: prime, $63,278 on "Portable Floors Refinish" for Spokane Public Facilities District, Spokane
- Wm Winkler Company: sub to Halme Construction Inc, $101,320 on "Washington G&O - 8th to 3rd" for City of Spokane, Spokane
- Wm Winkler Company: sub to Inland Infrastructure LLC, $68,898 on "Habitat Carnahan Subdivision" for City of Spokane Valley, Spokane
SPOKANE VALLEY
- A F P Systems Inc: sub to Walker Construction Inc, $77,000 on "Regal Care Residential" for Commerce, Wa. State Department of (Formerly Cted), Spokane Valley
- American Ironwrks & Erctrs Inc: sub to Apollo Inc, $50,000 on "Havana Well Station Phase 2" for City of Spokane, Spokane Valley
- Construction Ahead Inc: sub to Road Products LLC, $80,110 on "SR290/SR27 Pines Rd BNSF Grade Separation" for City of Spokane Valley, Spokane Valley
- Flynn Bec LP: prime, $49,595 on "SPOKANE VALLEY FIRE STATION 1 TPO RR" for Spokane Valley Fire Department, Spokane Valley
- Garland/Dbs Inc: prime, $85,001 on "25-WA-261036 East Valley SD - Trentwood ES" for East Valley School District #361, Spokane Valley
- Inland Infrastructure LLC: prime, $981,347 on "Habitat Carnahan Subdivision" for City of Spokane Valley, Spokane Valley
- Lydig Construction Inc: prime, $3,500,000 on "Partner's INW - Ziggy's TI" for Partners Inland Northwest, Spokane Valley
Browse WaPublicWorksIntentPulse by category and location · Search and filter WaPublicWorksIntentPulse