TxDotContractProgressPulse: all 1,000 record reports, page 3 of 5
Every TxDotContractProgressPulse record report, 200 per page, grouped by state. Records 401 to 600: International Eagle Enterprises, INC.: TxDOT maintenance contract 100%+ complete, Various, El Paso County ($2,888,843, 2 subs) to Orion Construction, LLC: TxDOT bridge replacement contract 100%+ complete, SH 317, Bosque County ($6,695,166, 14 subs). Source: Texas Department of Transportation construction contract recapitulation (data.texas.gov).
Texas
- International Eagle Enterprises, INC.: TxDOT maintenance contract 100%+ complete, Various, El Paso County ($2,888,843, 2 subs)
- International Eagle Enterprises, INC.: TxDOT maintenance contract 81% complete, FM1110, El Paso County ($2,481,802, 1 sub)
- International Eagle Enterprises, INC.: TxDOT safety rest area contract 99% complete, IH 10, Hudspeth County ($24,335,968, 3 subs)
- Interstate Barricades & Markings, INC.: TxDOT miscellaneous construction contract 100%+ complete, Various, Bexar County ($2,999,118)
- Ioc Company LLC: TxDOT hazard elimination & safety contract 21% complete, SH 48, Cameron County ($4,871,749, 5 subs)
- Ioc Company LLC: TxDOT maintenance contract 94% complete, IH 2, Hidalgo County ($10,307,483, 2 subs)
- Ioc Company LLC: TxDOT maintenance contract 96% complete, IH0002, Hidalgo County ($11,722,365)
- Ioc Company LLC: TxDOT miscellaneous construction contract 1% complete, Various, Cameron County ($7,124,484, 7 subs)
- Ioc Company LLC: TxDOT overlay contract 0% complete, FM 1419, Cameron County ($8,444,079)
- Ioc Company LLC: TxDOT overlay contract 26% complete, US 83, Starr County ($2,559,397, 4 subs)
- Ioc Company LLC: TxDOT overlay contract 58% complete, FM 493, Hidalgo County ($11,727,548, 3 subs)
- Ioc Company LLC: TxDOT rehabilitation of existing road contract 38% complete, FM 1015, Hidalgo County ($21,070,432, 6 subs)
- Ioc Company LLC: TxDOT rehabilitation of existing road contract 49% complete, FM 510, Cameron County ($13,013,802, 2 subs)
- Ioc Company LLC: TxDOT rehabilitation of existing road contract 6% complete, FM 1421, Cameron County ($15,526,764, 4 subs)
- Ioc Company LLC: TxDOT upgrade to standards freeway contract 33% complete, US 281, Hidalgo County ($169,156,689, 14 subs)
- Ioc Company LLC: TxDOT widen freeway contract 83% complete, US 83, Zapata County ($34,493,165, 6 subs)
- Ioc Company LLC: TxDOT widen non-freeway contract 100%+ complete, US 83, Starr County ($27,674,440, 17 subs)
- Ioc Company LLC: TxDOT widen non-freeway contract 55% complete, US 83, Starr County ($33,804,088, 9 subs)
- Isi Contracting, INC.: TxDOT bridge replacement contract 11% complete, UA 90, Fort Bend County ($28,445,548, 10 subs)
- Isi Contracting, INC.: TxDOT bridge replacement contract 74% complete, US 190, Tyler County ($38,202,790, 8 subs)
- Isi Contracting, INC.: TxDOT bridge widening or rehabilitation contract 91% complete, Various, Harris County ($4,858,277, 2 subs)
- Isi Contracting, INC.: TxDOT hazard elimination & safety contract 100%+ complete, US 90, Harris County ($2,931,776, 6 subs)
- Isi Contracting, INC.: TxDOT maintenance contract 100%+ complete, SL0008, Harris County ($5,260,517, 1 sub)
- Isi Contracting, INC.: TxDOT maintenance contract 16% complete, IH0610, Harris County ($5,144,700)
- Isi Contracting, INC.: TxDOT maintenance contract 83% complete, US0290, Harris County ($5,874,002)
- Isi Contracting, INC.: TxDOT maintenance contract 91% complete, US0290, Harris County ($5,440,477, 2 subs)
- Isi Contracting, INC.: TxDOT miscellaneous construction contract 100%+ complete, FM 1488, Montgomery County ($11,768,309, 11 subs)
- Isi Contracting, INC.: TxDOT miscellaneous construction contract 89% complete, US 290, Waller County ($11,287,735, 16 subs)
- Isi Contracting, INC.: TxDOT miscellaneous construction contract 99% complete, US 290, Waller County ($9,887,229, 12 subs)
- Isi Contracting, INC.: TxDOT rehabilitation of existing road contract 92% complete, SL 8, Harris County ($31,140,064, 14 subs)
- J E Construction Services, LLC: TxDOT convert non-freeway to freeway contract 58% complete, SH 286, Nueces County ($79,180,204, 13 subs)
- J E Construction Services, LLC: TxDOT widen non-freeway contract 14% complete, FM 624, Nueces County ($30,842,622, 5 subs)
- J. Carroll Weaver, INC.: TxDOT bridge replacement contract 97% complete, CR, Webb County ($4,522,095, 4 subs)
- J. Carroll Weaver, INC.: TxDOT hazard elimination & safety contract 97% complete, SH 234, San Patricio County ($6,002,457, 5 subs)
- J. Carroll Weaver, INC.: TxDOT rehabilitation of existing road contract 90% complete, IH 37, San Patricio County ($7,952,541, 2 subs)
- J. H. Strain & Sons, INC.: TxDOT bridge replacement contract 29% complete, FM 604, Taylor County ($2,739,392, 7 subs)
- J. H. Strain & Sons, INC.: TxDOT miscellaneous construction contract 40% complete, SH 36, Taylor County ($4,175,101, 4 subs)
- J. H. Strain & Sons, INC.: TxDOT rehabilitation of existing road contract 92% complete, US 277, Coke County ($42,805,503, 12 subs)
- J. H. Strain & Sons, INC.: TxDOT widen non-freeway contract 94% complete, FM 1235, Taylor County ($3,259,427, 5 subs)
- J. Lee Milligan, INC.: TxDOT hazard elimination & safety contract 56% complete, FM 2590, Randall County ($28,568,456, 7 subs)
- J. Lee Milligan, INC.: TxDOT maintenance contract 57% complete, IH0040, Potter County ($10,007,611)
- J. Lee Milligan, INC.: TxDOT rehabilitation of existing road contract 15% complete, US 60, Deaf Smith County ($45,199,631, 5 subs)
- J. Lee Milligan, INC.: TxDOT rehabilitation of existing road contract 61% complete, US 54, Dallam County ($26,623,978, 5 subs)
- J. Lee Milligan, INC.: TxDOT widen freeway contract 100% complete, FM 281, Moore County ($41,423,505, 4 subs)
- J3 Company, LLC: TxDOT hazard elimination & safety contract 100%+ complete, US 87, Bexar County ($5,038,399, 7 subs)
- Jagoe-Public Company: TxDOT maintenance contract 100%+ complete, IH0020, Parker County ($3,344,800)
- Jagoe-Public Company: TxDOT rehabilitation of existing road contract 89% complete, FM 920, Parker County ($4,997,477, 5 subs)
- Jagoe-Public Company: TxDOT rehabilitation of existing road contract 94% complete, FM 3163, Denton County ($4,266,792, 9 subs)
- Jagoe-Public Company: TxDOT widen non-freeway contract 100%+ complete, FM 373, Cooke County ($7,336,794, 8 subs)
- Jagoe-Public Company: TxDOT widen non-freeway contract 100%+ complete, US 377, Grayson County ($7,318,307, 7 subs)
- James Construction Group, LLC: TxDOT bridge replacement contract 100%+ complete, SH 288, Brazoria County ($53,231,623, 24 subs)
- James Construction Group, LLC: TxDOT bridge replacement contract 64% complete, IH 20, Ward County ($29,259,684, 18 subs)
- James Construction Group, LLC: TxDOT miscellaneous construction contract 100%+ complete, SH 249, Harris County ($8,084,716, 6 subs)
- James Construction Group, LLC: TxDOT miscellaneous construction contract 23% complete, US 83, Taylor County ($74,023,914, 14 subs)
- James Construction Group, LLC: TxDOT miscellaneous construction contract 28% complete, IH 45, Montgomery County ($43,038,118, 20 subs)
- James Construction Group, LLC: TxDOT miscellaneous construction contract 97% complete, FM 1764, Galveston County ($18,055,749, 15 subs)
- James Construction Group, LLC: TxDOT miscellaneous construction contract 98% complete, MH, Harris County ($59,329,283, 30 subs)
- James Construction Group, LLC: TxDOT new location freeway contract 90% complete, US 59, Polk County ($178,705,269, 30 subs)
- James Construction Group, LLC: TxDOT upgrade to standards freeway contract 47% complete, US 59, Webb County ($351,512,621, 21 subs)
- James Construction Group, LLC: TxDOT widen freeway contract 34% complete, SH 146, Galveston County ($200,589,211, 32 subs)
- James Construction Group, LLC: TxDOT widen freeway contract 91% complete, SL 336, Montgomery County ($21,465,641, 15 subs)
- James Construction Group, LLC: TxDOT widen non-freeway contract 100%+ complete, FM 1097, Montgomery County ($22,238,450, 25 subs)
- James Construction Group, LLC: TxDOT widen non-freeway contract 100%+ complete, FM 2218, Fort Bend County ($48,385,927, 24 subs)
- James Construction Group, LLC: TxDOT widen non-freeway contract 100%+ complete, SL 121, Bell County ($35,397,000, 24 subs)
- James Construction Group, LLC: TxDOT widen non-freeway contract 34% complete, US 190, Madison County ($183,820,507, 16 subs)
- James Construction Group, LLC: TxDOT widen non-freeway contract 70% complete, SH 105, Montgomery County ($53,266,100, 19 subs)
- James Construction Group, LLC: TxDOT widen non-freeway contract 76% complete, FM 1488, Montgomery County ($49,181,533, 22 subs)
- James Construction Group, LLC: TxDOT widen non-freeway contract 93% complete, SH 105, Montgomery County ($105,018,262, 19 subs)
- James Construction Group, LLC: TxDOT widen non-freeway contract 98% complete, SL 363, Bell County ($55,332,401, 30 subs)
- James Hamilton Construction Co.: TxDOT hazard elimination & safety contract 59% complete, US 62, Gaines County ($8,306,962, 5 subs)
- James Hamilton Construction Co.: TxDOT rehabilitation of existing road contract 100%+ complete, RM 652, Culberson County ($30,058,509, 13 subs)
- James Hamilton Construction Co.: TxDOT restoration contract 80% complete, SH 214, Cochran County ($34,968,093, 11 subs)
- Jcw Construction, LLC: TxDOT maintenance contract 100%+ complete, US0059, Wharton County ($2,436,333)
- Jcw Construction, LLC: TxDOT maintenance contract 58% complete, SH0111, Dewitt County ($3,150,703)
- Jfo Services, LLC: TxDOT miscellaneous construction contract 45% complete, BS 36J, Washington County ($2,382,546, 5 subs)
- Joe Bland Construction LLC: TxDOT rehabilitation of existing road contract 33% complete, US 183, Williamson County ($14,881,672, 7 subs)
- John Reed And Company, LLC: TxDOT bridge replacement contract 52% complete, CR, Wharton County ($2,804,821, 2 subs)
- John Reed And Company, LLC: TxDOT bridge replacement contract 98% complete, SH 60, Wharton County ($5,754,899, 12 subs)
- Johnson Bros. Corporation, A Southland Company: TxDOT rehabilitation of existing road contract 100%+ complete, SH 302, Winkler County ($48,065,281, 12 subs)
- Johnson Bros. Corporation, A Southland Company: TxDOT rehabilitation of existing road contract 92% complete, US 175, Dallas County ($81,724,577, 28 subs)
- Jones Bros. Dirt & Paving Contractors, INC.: TxDOT bridge replacement contract 96% complete, US 285, Reeves County ($48,250,918, 14 subs)
- Jones Bros. Dirt & Paving Contractors, INC.: TxDOT hazard elimination & safety contract 100%+ complete, SH 158, Ector County ($6,053,247, 8 subs)
- Jones Bros. Dirt & Paving Contractors, INC.: TxDOT hazard elimination & safety contract 18% complete, SL 250, Midland County ($20,524,193, 11 subs)
- Jones Bros. Dirt & Paving Contractors, INC.: TxDOT overlay contract 100%+ complete, SH 349, Midland County ($8,686,228, 6 subs)
- Jones Bros. Dirt & Paving Contractors, INC.: TxDOT rehabilitation of existing road contract 100%+ complete, IH 20, Martin County ($12,121,541, 7 subs)
- Jones Bros. Dirt & Paving Contractors, INC.: TxDOT rehabilitation of existing road contract 100%+ complete, US 67, Pecos County ($41,634,268, 11 subs)
- Jones Bros. Dirt & Paving Contractors, INC.: TxDOT rehabilitation of existing road contract 70% complete, SH 18, Ward County ($18,378,293, 9 subs)
- Jones Bros. Dirt & Paving Contractors, INC.: TxDOT rehabilitation of existing road contract 90% complete, US 67, Upton County ($13,869,247, 9 subs)
- Jones Bros. Dirt & Paving Contractors, INC.: TxDOT rehabilitation of existing road contract 92% complete, FM 846, Martin County ($28,245,967, 10 subs)
- Jones Bros. Dirt & Paving Contractors, INC.: TxDOT traffic signal contract 4% complete, SH 158, Midland County ($6,361,562, 9 subs)
- Jones Bros. Dirt & Paving Contractors, INC.: TxDOT widen freeway contract 11% complete, SH 115, Winkler County ($25,593,201, 9 subs)
- Jones Bros. Dirt & Paving Contractors, INC.: TxDOT widen freeway contract 19% complete, SH 115, Winkler County ($29,653,896, 9 subs)
- Jones Bros. Dirt & Paving Contractors, INC.: TxDOT widen freeway contract 20% complete, US 285, Pecos County ($27,673,482, 10 subs)
- Jones Bros. Dirt & Paving Contractors, INC.: TxDOT widen non-freeway contract 16% complete, US 67, Upton County ($27,335,957, 12 subs)
- Jones Bros. Dirt & Paving Contractors, INC.: TxDOT widen non-freeway contract 89% complete, US 67, Upton County ($29,018,097, 12 subs)
- Jordan Foster Construction, LLC: TxDOT convert non-freeway to freeway contract 37% complete, US 90, Bexar County ($124,809,706, 20 subs)
- Jordan Foster Construction, LLC: TxDOT interchange (new or reconstructed) contract 39% complete, SL 375, El Paso County ($12,876,264, 6 subs)
- Jordan Foster Construction, LLC: TxDOT miscellaneous construction contract 90% complete, US 62, El Paso County ($272,196,819, 24 subs)
- Jordan Foster Construction, LLC: TxDOT rehabilitation of existing road contract 73% complete, FM 1281, El Paso County ($39,552,362, 14 subs)
- Jordan Foster Construction, LLC: TxDOT upgrade to standards freeway contract 47% complete, SH 71, Bastrop County ($59,021,973, 17 subs)
- Jordan Foster Construction, LLC: TxDOT widen freeway contract 100%+ complete, IH 10, Bexar County ($100,848,461, 21 subs)
- Jordan Foster Construction, LLC: TxDOT widen freeway contract 85% complete, SL 375, El Paso County ($145,348,189, 24 subs)
- Jordan Foster Construction, LLC: TxDOT widen non-freeway contract 68% complete, FM 1516, Bexar County ($70,854,434, 13 subs)
- Kiewit Infrastructure South Co.: TxDOT overlay contract 100%+ complete, IH 10, Crockett County ($23,700,583, 11 subs)
- Knife River Corporation - South: TxDOT bridge replacement contract 67% complete, SH 220, Erath County ($10,068,472, 14 subs)
- Knife River Corporation - South: TxDOT hazard elimination & safety contract 96% complete, FM 2377, Ellis County ($6,786,052, 12 subs)
- Knife River Corporation - South: TxDOT rehabilitation of existing road contract 18% complete, FM 39, Madison County ($18,618,538, 13 subs)
- Knife River Corporation - South: TxDOT rehabilitation of existing road contract 42% complete, FM 667, Ellis County ($9,679,717, 10 subs)
- Knife River Corporation - South: TxDOT rehabilitation of existing road contract 55% complete, FM 2293, Robertson County ($18,550,009, 18 subs)
- Knife River Corporation - South: TxDOT rehabilitation of existing road contract 87% complete, SS 579, Hill County ($3,612,413, 8 subs)
- Knife River Corporation - South: TxDOT rehabilitation of existing road contract 97% complete, FM 2780, Washington County ($17,619,876, 12 subs)
- Knife River Corporation - South: TxDOT restoration contract 95% complete, FM 879, Ellis County ($9,430,548, 10 subs)
- Knife River Corporation - South: TxDOT widen non-freeway contract 100%+ complete, FM 2818, Brazos County ($53,878,369, 27 subs)
- L & N Bridge, LLC: TxDOT bridge replacement contract 99% complete, FM 68, Fannin County ($2,926,144, 8 subs)
- L A Fuller & Sons Construction, LTD.: TxDOT hazard elimination & safety contract 86% complete, SL 335, Randall County ($6,975,651, 7 subs)
- L A Fuller & Sons Construction, LTD.: TxDOT miscellaneous construction contract 94% complete, Various, Potter County ($4,020,191, 5 subs)
- L A Fuller & Sons Construction, LTD.: TxDOT miscellaneous construction contract 95% complete, SL 395, Potter County ($5,966,385, 5 subs)
- L A Fuller & Sons Construction, LTD.: TxDOT rehabilitation of existing road contract 98% complete, Various, Randall County ($4,205,123, 3 subs)
- L. S. Equipment Co., INC.: TxDOT rehabilitation of existing road contract 100%+ complete, SH 49, Cass County ($12,087,129, 9 subs)
- L&L Company: TxDOT traffic protection devices contract 99% complete, Various, Tom Green County ($2,488,408)
- Lakey, INC.: TxDOT widen non-freeway contract 89% complete, FM 1131, Orange County ($5,104,462, 7 subs)
- Lakey, INC.: TxDOT widen non-freeway contract 98% complete, FM 697, Grayson County ($5,188,334, 8 subs)
- Lamar Companies LLC: TxDOT interchange (new or reconstructed) contract 62% complete, US 69, Wood County ($39,060,728, 10 subs)
- Larry Young Paving, INC.: TxDOT bridge replacement contract 15% complete, SH 105, Washington County ($2,898,512, 9 subs)
- Larry Young Paving, INC.: TxDOT bridge replacement contract 83% complete, US 79, Robertson County ($19,115,760, 14 subs)
- Larry Young Paving, INC.: TxDOT hazard elimination & safety contract 100%+ complete, FM 1179, Brazos County ($4,317,835, 7 subs)
- Larry Young Paving, INC.: TxDOT hazard elimination & safety contract 100%+ complete, US 79, Leon County ($3,092,438, 6 subs)
- Larry Young Paving, INC.: TxDOT hazard elimination & safety contract 28% complete, BS 71E, Fayette County ($4,030,857, 5 subs)
- Larry Young Paving, INC.: TxDOT hazard elimination & safety contract 50% complete, BS 6R, Brazos County ($4,469,916, 6 subs)
- Larry Young Paving, INC.: TxDOT hazard elimination & safety contract 57% complete, FM 974, Brazos County ($2,875,282, 4 subs)
- Larry Young Paving, INC.: TxDOT hazard elimination & safety contract 99% complete, SH 21, Brazos County ($7,077,676, 7 subs)
- Larry Young Paving, INC.: TxDOT miscellaneous construction contract 90% complete, FM 158, Brazos County ($17,823,822, 7 subs)
- Lesna Construction, INC.: TxDOT rehabilitation of existing road contract 100%+ complete, RM 652, Culberson County ($24,168,204, 5 subs)
- Liberty Mutual Insurance Company: TxDOT rehabilitation of existing road contract 94% complete, FM 1495, Brazoria County ($8,777,058, 30 subs)
- Lindsay Corporation: TxDOT maintenance contract 36% complete, IH0030, Dallas County ($30,757,686)
- Lindsey Electric, L.P.: TxDOT maintenance contract 62% complete, IH0610, Harris County ($3,282,377)
- Lindsey Electric, L.P.: TxDOT maintenance contract 94% complete, IH0610, Harris County ($2,535,512)
- Lipham Asphalt And Paving Company, LLC: TxDOT seal coat contract 100%+ complete, US 380, Haskell County ($9,560,109, 2 subs)
- Lipham Asphalt And Paving Company, LLC: TxDOT seal coat contract 87% complete, SS 331, Lubbock County ($21,467,957, 2 subs)
- Lone Star Dirt & Paving, LTD.: TxDOT widen non-freeway contract 93% complete, CS, Lubbock County ($19,624,310, 14 subs)
- Lone Star Paving Company: TxDOT maintenance contract 22% complete, SH 29, Burnet County ($3,062,864, 2 subs)
- Lone Star Paving Company: TxDOT maintenance contract 85% complete, SH0130, Travis County ($11,632,301, 3 subs)
- Lone Star Paving Company: TxDOT restoration contract 99% complete, IH 37, Atascosa County ($17,668,156, 6 subs)
- Longview Asphalt, INC.: TxDOT materials-only contract 71% complete, US0069, Cherokee County ($4,373,939)
- Longview Bridge And Road, LTD.: TxDOT bridge replacement contract 23% complete, SH 64, Rusk County ($13,863,141, 10 subs)
- Longview Bridge And Road, LTD.: TxDOT bridge replacement contract 37% complete, IH 20, Gregg County ($37,560,038, 11 subs)
- Longview Bridge And Road, LTD.: TxDOT bridge replacement contract 69% complete, SH 155, Marion County ($54,977,522, 12 subs)
- Longview Bridge And Road, LTD.: TxDOT bridge replacement contract 97% complete, US 271, Titus County ($22,992,908, 16 subs)
- Longview Bridge And Road, LTD.: TxDOT convert non-freeway to freeway contract 66% complete, SL 287, Angelina County ($11,280,207, 8 subs)
- Longview Bridge And Road, LTD.: TxDOT convert non-freeway to freeway contract 90% complete, US 59, Angelina County ($63,840,014, 21 subs)
- Longview Bridge And Road, LTD.: TxDOT interchange (new or reconstructed) contract 93% complete, US 59, Nacogdoches County ($96,006,575, 21 subs)
- Longview Bridge And Road, LTD.: TxDOT newlocation non-freeway contract 54% complete, IH 30, Bowie County ($71,360,119, 18 subs)
- Longview Bridge And Road, LTD.: TxDOT widen freeway contract 84% complete, IH 30, Bowie County ($103,877,889, 24 subs)
- Longview Bridge And Road, LTD.: TxDOT widen non-freeway contract 40% complete, FM 2493, Smith County ($78,605,190, 6 subs)
- Longview Bridge And Road, LTD.: TxDOT widen non-freeway contract 59% complete, FM 2275, Gregg County ($23,669,860, 11 subs)
- Lucania Construction LLC: TxDOT bridge replacement contract 95% complete, CS, Cameron County ($2,404,615, 5 subs)
- Lucania Contractors LLC: TxDOT bridge widening or rehabilitation contract 87% complete, Various, Webb County ($3,362,590, 2 subs)
- Madden Contracting Company, LLC.: TxDOT maintenance contract 60% complete, IH0020, Harrison County ($6,504,275, 1 sub)
- Madden Contracting Company, LLC.: TxDOT rehabilitation of existing road contract 100%+ complete, SH 300, Upshur County ($24,813,485, 9 subs)
- Madden Contracting Company, LLC.: TxDOT rehabilitation of existing road contract 100%+ complete, SH 315, Rusk County ($21,451,375, 10 subs)
- Madden Contracting Company, LLC.: TxDOT rehabilitation of existing road contract 100%+ complete, SS 63, Gregg County ($3,255,324, 4 subs)
- Madden Contracting Company, LLC.: TxDOT restoration contract 100%+ complete, FM 2204, Gregg County ($3,530,063, 10 subs)
- Madden Contracting Company, LLC.: TxDOT widen non-freeway contract 98% complete, SH 204, Cherokee County ($17,760,412, 15 subs)
- Marcom's Mowing Service, LLC: TxDOT maintenance contract 76% complete, US0287, Wichita County ($3,819,008, 1 sub)
- Mario Sinacola & Sons Excavating, INC.: TxDOT newlocation non-freeway contract 32% complete, SS 394, Ellis County ($19,134,085, 13 subs)
- Mario Sinacola & Sons Excavating, INC.: TxDOT widen freeway contract 100%+ complete, US 75, Collin County ($81,103,679, 23 subs)
- Mario Sinacola & Sons Excavating, INC.: TxDOT widen non-freeway contract 99% complete, SH 114, Denton County ($101,486,625, 25 subs)
- Martin Marietta Materials, INC.: TxDOT materials-only contract 100%+ complete, US0287, Childress County ($3,934,097)
- Martin Marietta Materials, INC.: TxDOT materials-only contract 72% complete, IH0069C, Hidalgo County ($7,494,242)
- Massana Construction INC.: TxDOT hazard elimination & safety contract 78% complete, US 62, Lubbock County ($3,267,634, 5 subs)
- Mbn Enterprises LLC: TxDOT bridge replacement contract 0% complete, IH 610, Harris County ($3,198,584, 5 subs)
- Mbn Enterprises LLC: TxDOT miscellaneous construction contract 93% complete, FM 1960, Harris County ($10,710,022, 4 subs)
- Mc2 Civil, LLC: TxDOT maintenance contract 96% complete, SH0249, Harris County ($5,112,884)
- Mc2 Civil, LLC: TxDOT miscellaneous construction contract 49% complete, IH 45, Harris County ($21,205,839, 10 subs)
- Mc2 Civil, LLC: TxDOT miscellaneous construction contract 79% complete, UA 90, Harris County ($38,473,113, 17 subs)
- Mc2 Civil, LLC: TxDOT miscellaneous construction contract 99% complete, FM 2004, Galveston County ($3,102,541, 5 subs)
- Missouri Petroleum Products Company LLC: TxDOT maintenance contract 94% complete, US 87, Moore County ($18,834,643, 6 subs)
- Missouri Petroleum Products Company: TxDOT seal coat contract 92% complete, SH 8, Bowie County ($12,836,501, 3 subs)
- Missouri Petroleum Products Company: TxDOT seal coat contract 93% complete, US 87, Dallam County ($17,477,909, 5 subs)
- Mor-Wil, L.L.C.: TxDOT miscellaneous construction contract 4% complete, FM 2556, Cameron County ($6,635,620, 1 sub)
- Mortmara Construction, INC.: TxDOT bridge replacement contract 77% complete, US 287, Hardeman County ($30,379,848, 20 subs)
- Mp Heavy Construction INC: TxDOT bridge replacement contract 42% complete, US 287, Houston County ($9,031,788, 16 subs)
- Nobles Road Construction, INC.: TxDOT widen non-freeway contract 23% complete, FM 608, Nolan County ($8,057,062, 3 subs)
- Nobles Road Construction, INC.: TxDOT widen non-freeway contract 97% complete, SH 153, Nolan County ($14,520,145, 11 subs)
- Northeastern Pavers, LLC: TxDOT maintenance contract 58% complete, IH0020, Palo Pinto County ($7,141,551)
- Northeastern Pavers, LLC: TxDOT overlay contract 100%+ complete, IH 20, Eastland County ($23,391,840, 6 subs)
- Northeastern Pavers, LLC: TxDOT rehabilitation of existing road contract 85% complete, FM 917, Johnson County ($4,578,215, 7 subs)
- Northeastern Pavers, LLC: TxDOT seal coat contract 87% complete, FM 3363, Eastland County ($12,376,827, 2 subs)
- Northeastern Pavers, LLC: TxDOT seal coat contract 96% complete, SH 108, Erath County ($8,867,459, 3 subs)
- Nsg Logistics, LLC: TxDOT materials-only contract 37% complete, US0087, Moore County ($2,695,200)
- Nutrien Ag Solutions, INC.: TxDOT materials-only contract 42% complete, SH0031, Henderson County ($6,374,713)
- Nutrien Ag Solutions, INC.: TxDOT materials-only contract 44% complete, IH0010, Guadalupe County ($6,560,682)
- Nutrien Ag Solutions, INC.: TxDOT materials-only contract 62% complete, US0084, Garza County ($5,507,595)
- O. Trevino Construction, LLC: TxDOT hazard elimination & safety contract 100%+ complete, SH 289, Collin County ($2,586,746, 9 subs)
- O. Trevino Construction, LLC: TxDOT maintenance contract 100%+ complete, IH0040, Potter County ($3,396,006)
- O. Trevino Construction, LLC: TxDOT maintenance contract 100%+ complete, Various, Mclennan County ($2,754,639, 1 sub)
- O. Trevino Construction, LLC: TxDOT overlay contract 62% complete, SS 557, Kaufman County ($8,667,868, 8 subs)
- O. Trevino Construction, LLC: TxDOT rehabilitation of existing road contract 100%+ complete, Various, Tarrant County ($4,218,131, 4 subs)
- Olympus Painting Contractors, INC.: TxDOT miscellaneous construction contract 95% complete, Various, Smith County ($3,245,596, 2 subs)
- Orion Construction, LLC: TxDOT bridge replacement contract 100%+ complete, SH 317, Bosque County ($6,695,166, 14 subs)