Every TxDotContractProgressPulse record report, 200 per page, grouped by state. Records 801 to 1,000: T&L Cleaning Services LLC: TxDOT maintenance contract 47% complete, US0377, Erath County ($5,041,191) to Zurich American Insurance Company: TxDOT widen freeway contract 86% complete, IH 10, Jefferson County ($136,562,374, 35 subs). Source: Texas Department of Transportation construction contract recapitulation (data.texas.gov).
Texas
- T&L Cleaning Services LLC: TxDOT maintenance contract 47% complete, US0377, Erath County ($5,041,191)
- Texas Cordia Construction, LLC: TxDOT bridge replacement contract 94% complete, CR, Hidalgo County ($2,600,173, 7 subs)
- Texas Cordia Construction, LLC: TxDOT rehabilitation of existing road contract 100% complete, FM 1015, Hidalgo County ($12,094,699, 6 subs)
- Texas Cordia Construction, LLC: TxDOT rehabilitation of existing road contract 100%+ complete, FM 676, Hidalgo County ($16,639,402, 9 subs)
- Texas Cordia Construction, LLC: TxDOT widen non-freeway contract 29% complete, SH 107, Hidalgo County ($32,410,804, 6 subs)
- Texas Cordia Construction, LLC: TxDOT widen non-freeway contract 35% complete, FM 1423, Hidalgo County ($3,802,011, 3 subs)
- Texas Cordia Construction, LLC: TxDOT widen non-freeway contract 73% complete, FM 494, Hidalgo County ($20,416,135, 5 subs)
- Texas Cordia Construction, LLC: TxDOT widen non-freeway contract 85% complete, FM 491, Hidalgo County ($5,528,435, 4 subs)
- Texas Cordia Construction, LLC: TxDOT widen non-freeway contract 95% complete, FM 676, Hidalgo County ($12,303,502, 7 subs)
- Texas Gulf Construction Company, INC.: TxDOT maintenance contract 0% complete, SH0087, Galveston County ($40,819,145)
- Texas Gulf Construction Company, INC.: TxDOT maintenance contract 21% complete, SH 87, Galveston County ($26,325,150)
- Texas Gulf Construction Company, INC.: TxDOT miscellaneous construction contract 20% complete, SH 87, Galveston County ($53,465,450, 8 subs)
- Texas Gulf Construction Company, INC.: TxDOT miscellaneous construction contract 97% complete, SH 87, Galveston County ($11,957,837, 16 subs)
- Texas Materials Group, INC.: TxDOT bridge replacement contract 57% complete, FM 646, Galveston County ($16,646,178, 8 subs)
- Texas Materials Group, INC.: TxDOT bridge replacement contract 98% complete, CR, Hardin County ($3,941,119, 12 subs)
- Texas Materials Group, INC.: TxDOT bridge replacement contract 99% complete, SH 124, Jefferson County ($7,770,405, 10 subs)
- Texas Materials Group, INC.: TxDOT hazard elimination & safety contract 100% complete, US 287, Ellis County ($10,989,299, 7 subs)
- Texas Materials Group, INC.: TxDOT maintenance contract 100%+ complete, US0080, Wood County ($2,650,601)
- Texas Materials Group, INC.: TxDOT maintenance contract 41% complete, US0181, Karnes County ($3,489,750)
- Texas Materials Group, INC.: TxDOT maintenance contract 93% complete, US0080, Van Zandt County ($3,118,167)
- Texas Materials Group, INC.: TxDOT materials-only contract 26% complete, US0069, Smith County ($3,196,199)
- Texas Materials Group, INC.: TxDOT miscellaneous construction contract 100%+ complete, IH 35, Comal County ($6,800,363, 10 subs)
- Texas Materials Group, INC.: TxDOT miscellaneous construction contract 27% complete, SH 358, Nueces County ($58,654,086, 10 subs)
- Texas Materials Group, INC.: TxDOT miscellaneous construction contract 40% complete, SH 225, Harris County ($22,268,584, 9 subs)
- Texas Materials Group, INC.: TxDOT overlay contract 100%+ complete, BS 21P, Nacogdoches County ($11,088,431, 7 subs)
- Texas Materials Group, INC.: TxDOT overlay contract 100%+ complete, BU 59G, Angelina County ($4,884,730, 4 subs)
- Texas Materials Group, INC.: TxDOT overlay contract 100%+ complete, IH 37, Live Oak County ($15,031,592, 10 subs)
- Texas Materials Group, INC.: TxDOT overlay contract 100%+ complete, SL 304, Houston County ($14,401,270, 8 subs)
- Texas Materials Group, INC.: TxDOT overlay contract 84% complete, IH 69, Harris County ($45,321,550, 9 subs)
- Texas Materials Group, INC.: TxDOT overlay contract 97% complete, SH 225, Harris County ($22,090,347, 10 subs)
- Texas Materials Group, INC.: TxDOT overlay contract 98% complete, FM 518, Galveston County ($4,994,158, 2 subs)
- Texas Materials Group, INC.: TxDOT overlay contract 99% complete, SH 87, Galveston County ($7,780,604, 5 subs)
- Texas Materials Group, INC.: TxDOT rehabilitation of existing road contract 100%+ complete, IH 10, Kendall County ($26,771,615, 7 subs)
- Texas Materials Group, INC.: TxDOT rehabilitation of existing road contract 100%+ complete, US 84, Mclennan County ($10,926,563, 9 subs)
- Texas Materials Group, INC.: TxDOT rehabilitation of existing road contract 20% complete, FM 893, San Patricio County ($12,243,593, 3 subs)
- Texas Materials Group, INC.: TxDOT rehabilitation of existing road contract 32% complete, IH 45, Dallas County ($19,175,439, 11 subs)
- Texas Materials Group, INC.: TxDOT rehabilitation of existing road contract 45% complete, US 175, Dallas County ($29,529,856, 14 subs)
- Texas Materials Group, INC.: TxDOT rehabilitation of existing road contract 46% complete, FM 55, Ellis County ($8,638,301, 7 subs)
- Texas Materials Group, INC.: TxDOT rehabilitation of existing road contract 49% complete, SH 36, Austin County ($6,480,610, 2 subs)
- Texas Materials Group, INC.: TxDOT rehabilitation of existing road contract 8% complete, IH 35, Bexar County ($2,844,607, 4 subs)
- Texas Materials Group, INC.: TxDOT rehabilitation of existing road contract 83% complete, SS 73, Ellis County ($4,024,255, 9 subs)
- Texas Materials Group, INC.: TxDOT rehabilitation of existing road contract 83% complete, Various, Travis County ($9,199,901, 5 subs)
- Texas Materials Group, INC.: TxDOT rehabilitation of existing road contract 90% complete, IH 410, Bexar County ($9,693,874, 7 subs)
- Texas Materials Group, INC.: TxDOT rehabilitation of existing road contract 92% complete, FM 78, Bexar County ($21,679,814, 8 subs)
- Texas Materials Group, INC.: TxDOT rehabilitation of existing road contract 97% complete, FM 975, Burleson County ($6,044,710, 9 subs)
- Texas Materials Group, INC.: TxDOT rehabilitation of existing road contract 99% complete, SH 36, Austin County ($4,624,507, 5 subs)
- Texas Materials Group, INC.: TxDOT restoration contract 100%+ complete, FM 1414, Newton County ($3,964,290, 8 subs)
- Texas Materials Group, INC.: TxDOT restoration contract 76% complete, US 87, Gillespie County ($9,622,971, 8 subs)
- Texas Materials Group, INC.: TxDOT widen freeway contract 88% complete, US 281, Blanco County ($12,929,540, 9 subs)
- Texas Materials Group, INC.: TxDOT widen non-freeway contract 100%+ complete, FM 1960, Harris County ($65,615,542, 20 subs)
- Texas Materials Group, INC.: TxDOT widen non-freeway contract 51% complete, FM 1130, Orange County ($3,966,810, 5 subs)
- Texas Materials Group, INC.: TxDOT widen non-freeway contract 92% complete, FM 777, Jasper County ($10,505,362, 12 subs)
- Third Coast Services LLC: TxDOT corridor traffic management contract 99% complete, SH 6, Fort Bend County ($4,064,968, 2 subs)
- Third Coast Services LLC: TxDOT miscellaneous construction contract 33% complete, FM 1764, Galveston County ($4,356,677, 2 subs)
- Third Coast Services LLC: TxDOT traffic signal contract 77% complete, IH 610, Harris County ($2,509,075, 2 subs)
- Third Coast Services LLC: TxDOT traffic signal contract 89% complete, SL 521, Jackson County ($2,644,035, 2 subs)
- Thk Construction LLC: TxDOT bridge replacement contract 95% complete, SH 7, Nacogdoches County ($6,252,911, 12 subs)
- Thk Construction LLC: TxDOT bridge replacement contract 98% complete, CR, Cooke County ($2,475,522, 6 subs)
- Thk Construction LLC: TxDOT bridge replacement contract 98% complete, FM 2610, Polk County ($2,475,737, 9 subs)
- Thk Construction LLC: TxDOT hazard elimination & safety contract 92% complete, SH 154, Delta County ($2,464,629, 6 subs)
- Thk Construction LLC: TxDOT maintenance contract 100%+ complete, IH 30, Titus County ($7,756,806, 10 subs)
- Thk Construction LLC: TxDOT maintenance contract 80% complete, Various, Wichita County ($3,663,021, 1 sub)
- Ti-Zack Concrete, LLC: TxDOT bridge widening or rehabilitation contract 30% complete, IH 27, Hale County ($3,816,554, 5 subs)
- Ti-Zack Concrete, LLC: TxDOT maintenance contract 100% complete, Various, Lubbock County ($3,277,086, 3 subs)
- Ti-Zack Concrete, LLC: TxDOT miscellaneous construction contract 100% complete, SL 396, Mclennan County ($2,726,515, 7 subs)
- Ti-Zack Concrete, LLC: TxDOT miscellaneous construction contract 100%+ complete, SH 152, Moore County ($10,237,244, 8 subs)
- Ti-Zack Concrete, LLC: TxDOT miscellaneous construction contract 45% complete, FM 1541, Randall County ($11,838,078, 11 subs)
- Ti-Zack Concrete, LLC: TxDOT miscellaneous construction contract 95% complete, US 287, Moore County ($3,811,117, 8 subs)
- Ti-Zack Concrete, LLC: TxDOT rehabilitation of existing road contract 94% complete, Various, Wharton County ($2,975,138, 4 subs)
- Ti-Zack Concrete, LLC: TxDOT traffic signal contract 49% complete, Various, Jefferson County ($2,694,540, 5 subs)
- Traf-Tex, INC.: TxDOT corridor traffic management contract 100%+ complete, IH 69, Fort Bend County ($3,350,303)
- Traf-Tex, INC.: TxDOT corridor traffic management contract 26% complete, VA, Harris County ($3,571,943)
- Traf-Tex, INC.: TxDOT miscellaneous construction contract 24% complete, Various, Nueces County ($2,925,020, 1 sub)
- Traf-Tex, INC.: TxDOT miscellaneous construction contract 41% complete, VA, Harris County ($3,660,365)
- Traf-Tex, INC.: TxDOT miscellaneous construction contract 42% complete, IH 45, Montgomery County ($9,044,585)
- Traf-Tex, INC.: TxDOT miscellaneous construction contract 81% complete, IH 69, Montgomery County ($3,751,484)
- Traf-Tex, INC.: TxDOT traffic signal contract 31% complete, IH 37, Nueces County ($3,168,237, 2 subs)
- Traf-Tex, INC.: TxDOT traffic signal contract 86% complete, VA, Harris County ($2,521,069, 4 subs)
- Trevway, INC.: TxDOT bridge replacement contract 3% complete, CR, Fort Bend County ($2,848,247, 3 subs)
- Trevway, INC.: TxDOT bridge replacement contract 51% complete, CR, Wharton County ($2,648,292, 4 subs)
- Trevway, INC.: TxDOT bridge replacement contract 52% complete, CR, Wharton County ($2,731,565, 4 subs)
- Trevway, INC.: TxDOT bridge replacement contract 60% complete, CR, Wharton County ($3,131,608, 4 subs)
- Trevway, INC.: TxDOT bridge replacement contract 95% complete, CR, Gonzales County ($3,224,730, 3 subs)
- Trevway, INC.: TxDOT rehabilitation of existing road contract 98% complete, US 90, Fayette County ($2,776,128, 2 subs)
- Tri State Electric, LTD.: TxDOT hazard elimination & safety contract 100%+ complete, SH 20, El Paso County ($5,796,794, 4 subs)
- Tri State Electric, LTD.: TxDOT hazard elimination & safety contract 35% complete, BU 54A, El Paso County ($2,772,050, 7 subs)
- Tri State Electric, LTD.: TxDOT hazard elimination & safety contract 75% complete, IH 10, El Paso County ($6,231,003, 5 subs)
- Tri State Electric, LTD.: TxDOT hazard elimination & safety contract 88% complete, BU 54A, El Paso County ($2,968,624, 4 subs)
- Tri State Electric, LTD.: TxDOT traffic protection devices contract 38% complete, Various, El Paso County ($8,626,137, 2 subs)
- Trp Construction Group, LLC: TxDOT maintenance contract 67% complete, SH0019, Henderson County ($4,796,402)
- Trp Infrastructure Services, LLC: TxDOT maintenance contract 100%+ complete, IH0410, Bexar County ($2,923,900)
- Trp Infrastructure Services, LLC: TxDOT maintenance contract 100%+ complete, US0287, Wichita County ($2,937,792)
- Trp Infrastructure Services, LLC: TxDOT miscellaneous construction contract 100%+ complete, IH 45, Harris County ($2,827,770)
- True Roads Construction LLC: TxDOT hazard elimination & safety contract 100%+ complete, US 259, Rusk County ($2,538,225, 6 subs)
- True Roads Construction LLC: TxDOT rehabilitation of existing road contract 27% complete, US 82, Bowie County ($11,298,695, 8 subs)
- Ttg Utilities, INC.: TxDOT rehabilitation of existing road contract 77% complete, FD, Coryell County ($5,787,023, 5 subs)
- Urban Infraconstruction LLC: TxDOT widen non-freeway contract 19% complete, FM 549, Rockwall County ($30,009,684, 13 subs)
- Vaca Underground Utilities INC: TxDOT miscellaneous construction contract 42% complete, VA, Harris County ($3,476,447, 1 sub)
- Vaca Underground Utilities INC: TxDOT miscellaneous construction contract 78% complete, VA, Harris County ($2,720,264, 1 sub)
- Vaca Underground Utilities INC: TxDOT traffic signal contract 90% complete, SH 35, Matagorda County ($2,437,684, 1 sub)
- Volcanic Stone Co.: TxDOT materials-only contract 35% complete, US0060, Carson County ($2,816,885)
- Vulcan Construction Materials, LLC: TxDOT maintenance contract 38% complete, US0090, Val Verde County ($2,403,920)
- Vulcan Construction Materials, LLC: TxDOT materials-only contract 55% complete, US0090, Uvalde County ($2,422,854)
- Vulcan Construction Materials, LLC: TxDOT materials-only contract 62% complete, IH0030, Bowie County ($4,522,239)
- Webber Waterworks, LLC: TxDOT miscellaneous construction contract 44% complete, US 183, Travis County ($429,904,421, 26 subs)
- Webber, LLC: TxDOT bridge widening or rehabilitation contract 95% complete, US 60, Parmer County ($73,178,672, 24 subs)
- Webber, LLC: TxDOT convert non-freeway to freeway contract 61% complete, US 59, San Jacinto County ($192,491,946, 26 subs)
- Webber, LLC: TxDOT hazard elimination & safety contract 100%+ complete, US 75, Collin County ($61,140,287, 19 subs)
- Webber, LLC: TxDOT miscellaneous construction contract 100%+ complete, IH 35, Hays County ($86,633,817, 31 subs)
- Webber, LLC: TxDOT miscellaneous construction contract 100%+ complete, SL 335, Potter County ($135,936,006, 24 subs)
- Webber, LLC: TxDOT miscellaneous construction contract 26% complete, SL 360, Travis County ($69,279,169, 25 subs)
- Webber, LLC: TxDOT miscellaneous construction contract 40% complete, US 183, Williamson County ($141,269,426, 28 subs)
- Webber, LLC: TxDOT miscellaneous construction contract 49% complete, IH 10, Harris County ($413,188,033, 25 subs)
- Webber, LLC: TxDOT newlocation non-freeway contract 78% complete, SH 84, Webb County ($122,673,213, 15 subs)
- Webber, LLC: TxDOT rehabilitation of existing road contract 100%+ complete, US 59, Wharton County ($7,015,371, 6 subs)
- Webber, LLC: TxDOT widen freeway contract 100%+ complete, IH 10, Guadalupe County ($137,741,929, 26 subs)
- Webber, LLC: TxDOT widen freeway contract 100%+ complete, IH 37, San Patricio County ($92,020,740, 21 subs)
- Webber, LLC: TxDOT widen freeway contract 100%+ complete, SH 99, Fort Bend County ($100,041,584, 21 subs)
- Webber, LLC: TxDOT widen freeway contract 53% complete, SH 5, Collin County ($158,790,785, 27 subs)
- Webber, LLC: TxDOT widen freeway contract 53% complete, SL 1604, Bexar County ($156,256,943, 27 subs)
- Webber, LLC: TxDOT widen freeway contract 67% complete, IH 10, Guadalupe County ($254,068,996, 28 subs)
- Webber, LLC: TxDOT widen freeway contract 67% complete, IH 27, Randall County ($314,767,568, 25 subs)
- Webber, LLC: TxDOT widen freeway contract 94% complete, IH 35, Denton County ($123,950,571, 27 subs)
- Webber, LLC: TxDOT widen freeway contract 96% complete, US 80, Kaufman County ($124,239,117, 29 subs)
- Webber, LLC: TxDOT widen freeway contract 97% complete, IH 10, Colorado County ($376,767,849, 24 subs)
- Webber, LLC: TxDOT widen non-freeway contract 100% complete, SL 378, Tom Green County ($43,071,989, 18 subs)
- Webber, LLC: TxDOT widen non-freeway contract 100%+ complete, FM 2514, Collin County ($63,505,105, 21 subs)
- Webber, LLC: TxDOT widen non-freeway contract 100%+ complete, SH 46, Comal County ($61,541,240, 19 subs)
- Webber, LLC: TxDOT widen non-freeway contract 49% complete, US 380, Collin County ($143,764,981, 18 subs)
- Webber, LLC: TxDOT widen non-freeway contract 91% complete, FM 2100, Harris County ($98,881,567, 29 subs)
- Webber, LLC: TxDOT widen non-freeway contract 94% complete, CR, Lubbock County ($37,968,234, 14 subs)
- Webber, LLC: TxDOT widen non-freeway contract 97% complete, SH 36, Brazoria County ($127,890,523, 25 subs)
- Westfield Insurance Company: TxDOT bridge replacement contract 36% complete, FM 731, Johnson County ($3,591,524, 18 subs)
- Westfield Insurance Company: TxDOT bridge replacement contract 51% complete, US 287, Childress County ($4,088,612, 13 subs)
- Westfield Insurance Company: TxDOT bridge replacement contract 57% complete, SH 176, Howard County ($2,537,007, 12 subs)
- Westfield Insurance Company: TxDOT bridge replacement contract 78% complete, CR, Ellis County ($2,592,308, 12 subs)
- Westfield Insurance Company: TxDOT miscellaneous construction contract 64% complete, SH 136, Hutchinson County ($3,409,939, 9 subs)
- Wg Engineering & Construction, LLC: TxDOT maintenance contract 22% complete, IH0020, Tarrant County ($2,460,054, 1 sub)
- Wg Engineering & Construction, LLC: TxDOT traffic signal contract 37% complete, US 75, Collin County ($4,643,862, 4 subs)
- Wg Engineering & Construction, LLC: TxDOT traffic signal contract 73% complete, SL 12, Dallas County ($4,237,243, 3 subs)
- Williams Brothers Construction Co., INC.: TxDOT interchange (new or reconstructed) contract 100% complete, IH 30, Tarrant County ($331,282,906, 42 subs)
- Williams Brothers Construction Co., INC.: TxDOT interchange (new or reconstructed) contract 42% complete, IH 30, Hunt County ($197,966,061, 18 subs)
- Williams Brothers Construction Co., INC.: TxDOT interchange (new or reconstructed) contract 81% complete, US 69, Jefferson County ($81,582,703, 17 subs)
- Williams Brothers Construction Co., INC.: TxDOT miscellaneous construction contract 100%+ complete, IH 10, Waller County ($151,643,878, 23 subs)
- Williams Brothers Construction Co., INC.: TxDOT miscellaneous construction contract 83% complete, IH 45, Galveston County ($251,207,443, 20 subs)
- Williams Brothers Construction Co., INC.: TxDOT newlocation non-freeway contract 95% complete, SH 35, Harris County ($97,367,839, 18 subs)
- Williams Brothers Construction Co., INC.: TxDOT restoration contract 23% complete, IH 35, Bexar County ($222,430,680, 14 subs)
- Williams Brothers Construction Co., INC.: TxDOT traffic signal contract 100%+ complete, IH 410, Bexar County ($109,440,021, 22 subs)
- Williams Brothers Construction Co., INC.: TxDOT upgrade to standards freeway contract 100% complete, US 59, Wharton County ($184,632,081, 21 subs)
- Williams Brothers Construction Co., INC.: TxDOT upgrade to standards freeway contract 97% complete, IH 10, Orange County ($90,994,882, 23 subs)
- Williams Brothers Construction Co., INC.: TxDOT upgrade to standards non-freeway contract 52% complete, US 59, Wharton County ($345,189,438, 20 subs)
- Williams Brothers Construction Co., INC.: TxDOT widen freeway contract 100%+ complete, SL 1604, Bexar County ($154,425,589, 27 subs)
- Williams Brothers Construction Co., INC.: TxDOT widen freeway contract 34% complete, IH 69, Harris County ($713,543,247, 32 subs)
- Williams Brothers Construction Co., INC.: TxDOT widen freeway contract 37% complete, IH 10, Jefferson County ($543,815,681, 16 subs)
- Williams Brothers Construction Co., INC.: TxDOT widen freeway contract 54% complete, IH 10, Jefferson County ($315,542,678, 20 subs)
- Williams Brothers Construction Co., INC.: TxDOT widen freeway contract 55% complete, IH 30, Rockwall County ($348,131,125, 25 subs)
- Williams Brothers Construction Co., INC.: TxDOT widen freeway contract 56% complete, IH 45, Galveston County ($233,734,262, 14 subs)
- Williams Brothers Construction Co., INC.: TxDOT widen freeway contract 57% complete, SH 146, Harris County ($118,151,855, 11 subs)
- Williams Brothers Construction Co., INC.: TxDOT widen freeway contract 66% complete, IH 45, Galveston County ($114,624,116, 14 subs)
- Williams Brothers Construction Co., INC.: TxDOT widen freeway contract 73% complete, IH 45, Walker County ($229,969,145, 22 subs)
- Williams Brothers Construction Co., INC.: TxDOT widen freeway contract 78% complete, IH 10, Bexar County ($420,223,347, 24 subs)
- Williams Brothers Construction Co., INC.: TxDOT widen freeway contract 82% complete, IH 30, Rockwall County ($318,242,202, 28 subs)
- Williams Brothers Construction Co., INC.: TxDOT widen freeway contract 89% complete, IH 45, Galveston County ($172,993,517, 17 subs)
- Williams Brothers Construction Co., INC.: TxDOT widen freeway contract 94% complete, IH 10, Jefferson County ($123,771,117, 22 subs)
- Williams Brothers Construction Co., INC.: TxDOT widen freeway contract 99% complete, IH 10, Orange County ($58,360,157, 17 subs)
- Willis Electric Co., LP: TxDOT traffic signal contract 100%+ complete, Various, Ector County ($2,835,079, 8 subs)
- Yellowstone Landscape - Central, INC.: TxDOT landscape & scenic enhancement contract 100%+ complete, IH 45, Montgomery County ($3,162,369, 2 subs)
- Yellowstone Landscape - Central, INC.: TxDOT landscape & scenic enhancement contract 17% complete, IH 45, Galveston County ($3,205,663)
- Yellowstone Landscape - Central, INC.: TxDOT landscape & scenic enhancement contract 72% complete, IH 69, Harris County ($4,027,212, 2 subs)
- Yellowstone Landscape - Central, INC.: TxDOT landscape & scenic enhancement contract 85% complete, SH 99, Montgomery County ($12,467,474, 2 subs)
- Yellowstone Landscape - Central, INC.: TxDOT landscape & scenic enhancement contract 91% complete, IH 10, Harris County ($2,633,499, 1 sub)
- Yellowstone Landscape - Central, INC.: TxDOT landscape & scenic enhancement contract 99% complete, US 290, Waller County ($3,390,421)
- Yellowstone Landscape - Central, INC.: TxDOT maintenance contract 72% complete, US0290, Harris County ($14,495,712, 1 sub)
- Yunex LLC: TxDOT traffic signal contract 26% complete, CS, Dallas County ($3,628,795, 1 sub)
- Yunex LLC: TxDOT traffic signal contract 60% complete, SL 12, Dallas County ($3,175,673, 8 subs)
- Yunex LLC: TxDOT traffic signal contract 62% complete, HULEN ST, Tarrant County ($2,495,213, 6 subs)
- Yunex LLC: TxDOT traffic signal contract 83% complete, SL 12, Dallas County ($2,619,055, 8 subs)
- Zachry Construction Corporation: TxDOT interchange (new or reconstructed) contract 35% complete, IH 35E, Denton County ($125,019,776, 23 subs)
- Zachry Construction Corporation: TxDOT upgrade to standards freeway contract 75% complete, IH 20, Parker County ($101,436,184, 30 subs)
- Zachry Construction Corporation: TxDOT widen freeway contract 100%+ complete, IH 10, Bexar County ($189,795,345, 34 subs)
- Zachry Construction Corporation: TxDOT widen freeway contract 100%+ complete, SL 1604, Bexar County ($250,494,035, 53 subs)
- Zachry Construction Corporation: TxDOT widen freeway contract 100%+ complete, US 75, Grayson County ($188,220,969, 25 subs)
- Zachry Construction Corporation: TxDOT widen freeway contract 59% complete, IH 30, Tarrant County ($270,949,006, 31 subs)
- Zachry Construction Corporation: TxDOT widen freeway contract 65% complete, IH 410, Bexar County ($84,602,028, 30 subs)
- Zachry Construction Corporation: TxDOT widen non-freeway contract 100% complete, SH 36, Brazoria County ($111,316,213, 26 subs)
- Zachry Construction Corporation: TxDOT widen non-freeway contract 100%+ complete, FM 1417, Grayson County ($34,434,371, 28 subs)
- Zachry Construction Corporation: TxDOT widen non-freeway contract 100%+ complete, FM 1463, Fort Bend County ($114,002,080, 32 subs)
- Zachry Construction Corporation: TxDOT widen non-freeway contract 49% complete, FM 723, Fort Bend County ($145,926,402, 25 subs)
- Zack Burkett Co.: TxDOT hazard elimination & safety contract 100% complete, FM 1287, Young County ($6,505,018, 5 subs)
- Zack Burkett Co.: TxDOT overlay contract 100%+ complete, US 380, Throckmorton County ($4,706,859, 6 subs)
- Zack Burkett Co.: TxDOT overlay contract 100%+ complete, US 380, Young County ($5,531,636, 6 subs)
- Zack Burkett Co.: TxDOT overlay contract 100%+ complete, US 81, Montague County ($4,799,409, 3 subs)
- Zack Burkett Co.: TxDOT rehabilitation of existing road contract 100%+ complete, SH 114, Young County ($13,154,261, 6 subs)
- Zack Burkett Co.: TxDOT rehabilitation of existing road contract 83% complete, SH 6, Foard County ($6,898,953, 5 subs)
- Zack Burkett Co.: TxDOT restoration contract 97% complete, FM 422, Baylor County ($5,205,577, 6 subs)
- Zack Burkett Co.: TxDOT widen non-freeway contract 100%+ complete, BU 287J, Wichita County ($9,546,342, 7 subs)
- Zack Burkett Co.: TxDOT widen non-freeway contract 100%+ complete, SH 240, Wichita County ($5,662,321, 7 subs)
- Zack Burkett Co.: TxDOT widen non-freeway contract 22% complete, US 83, Cottle County ($49,253,082, 6 subs)
- Zack Burkett Co.: TxDOT widen non-freeway contract 52% complete, FM 104, Cottle County ($6,279,570, 7 subs)
- Zurich American Insurance Company: TxDOT widen freeway contract 86% complete, IH 10, Jefferson County ($136,562,374, 35 subs)